ENS 45731: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 02/26/2010 08:30 CST
| event date = 02/26/2010 08:30 CST
| last update date = 02/26/2010
| last update date = 02/26/2010
| title = In-Plant Paging System Out Of Service
| title = In-Plant Paging System Out of Service
| event text = At about 0830 CST on 2/26/2010 , it was discovered that the station paging system was not operating.  Repair efforts were initiated.  The Control Room and station personnel were notified of the pager outage. The automated callout system is available to notify the emergency response organization during the pager outage if needed.
| event text = At about 0830 CST on 2/26/2010 , it was discovered that the station paging system was not operating.  Repair efforts were initiated.  The Control Room and station personnel were notified of the pager outage. The automated callout system is available to notify the emergency response organization during the pager outage if needed.
* * * UPDATE FROM JOHN MUSSER TO JOE O'HARA AT 1556 EST ON 2/26/10 * * *
* * * UPDATE FROM JOHN MUSSER TO JOE O'HARA AT 1556 EST ON 2/26/10 * * *

Latest revision as of 21:10, 1 March 2018

ENS 45731 +/-
Where
Ft Calhoun Omaha Public Power District icon.png
Nebraska (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-0.22 h-0.00917 days <br />-0.00131 weeks <br />-3.01356e-4 months <br />)
Opened: Erick Matzke
14:17 Feb 26, 2010
NRC Officer: Joe O'Hara
Last Updated: Feb 26, 2010
45731 - NRC Website
Loading map...