ML20129B070: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:..
{{#Wiki_filter:(0ll- 0 W
(0ll- 0 W
/
            /         %,                                        UNITED STATES
UNITED STATES
[                   p,                       NUCLEAR REGULATORY COMMISSION t;                   j                               wAsmwaron, o. c.20sss
[
          \...../
p, NUCLEAR REGULATORY COMMISSION t;
MAR 12 W                                                                 .
j wAsmwaron, o. c.20sss
Ms. Susan L. Hiatt OCRE Representative 8275 Munson Road                                                                       IN RESPONSE REFER Mentor, OH 44060                                                                       TO F01A-85-88 f
\\...../
MAR 12 W Ms. Susan L. Hiatt OCRE Representative 8275 Munson Road IN RESPONSE REFER Mentor, OH 44060 TO F01A-85-88 f


==Dear Ms. Hiatt:==
==Dear Ms. Hiatt:==
This is in response to your {{letter dated|date=January 30, 1985|text=letter dated January 30, 1985}}, in which you requested, pursuant to the Freedom of Information Act, all records relating to the January 30 and 31, 1985, meeting between the Nuclear Regulatory Commission and the Hydrogen Control Owners Group held in Bethesda, Maryland.
This is in response to your {{letter dated|date=January 30, 1985|text=letter dated January 30, 1985}}, in which you requested, pursuant to the Freedom of Information Act, all records relating to the January 30 and 31, 1985, meeting between the Nuclear Regulatory Commission and the Hydrogen Control Owners Group held in Bethesda, Maryland.
The documents listed on the enclosed appendix are responsive to your request.
The documents listed on the enclosed appendix are responsive to your request.
Line 35: Line 35:
==Enclosures:==
==Enclosures:==
As stated e
As stated e
8506050100 850312 PDR         FOIA HIATT85-88                 PDR
8506050100 850312 PDR FOIA HIATT85-88 PDR


Re: F01A-85-88 APPENDIX
Re: F01A-85-88 APPENDIX 1.
: 1. 01/24/85 Memo for Elinor G. Adensam from Carl Stahle re: FORTHCOMING MEETING WITH HYDROGEN CONTROL OWNERS GROUP FOR ALL MARK III PLANTS w/ attached Meeting Notice Distribution.                                       (6pages)
01/24/85 Memo for Elinor G. Adensam from Carl Stahle re: FORTHCOMING MEETING WITH HYDROGEN CONTROL OWNERS GROUP FOR ALL MARK III PLANTS w/ attached Meeting Notice Distribution.
: 2. 01/28/85 Talking Paper - STATUS OF ORNL MODELS FOR HYDROGEN GENERATION IN BWR CORES.           (2pages)
(6pages) 2.
: 3. Ol/30/P.5 Infonnation regarding Task 1 and Task 7.                     (67pages)
01/28/85 Talking Paper - STATUS OF ORNL MODELS FOR HYDROGEN GENERATION IN BWR CORES.
        '4. 01/31/85 Attendees w/   attached -Equipment Meeting with        Hydrogen Survivability   Analysis ControlProgram.Owners Group (11 page
(2pages) 3.
: 5. 02/13/85 Letter to Robert Bernero from S. H. Hobbs re: Hydrogen Control Owners Group 1/4 Scale Test Facility 3D-Complex Calorimeter HGN-027. (13pages)
Ol/30/P.5 Infonnation regarding Task 1 and Task 7.
: 6. Undated     Proposed Agends fer the January 30 Meeting Between the Hydrogen Control Owners Group and Nuclear Regulatory Comission. (1 page)
(67pages)
: 7. Undated     Task 9 - Diffusion Flame Therman Environment.                                   (5pages)
Attendees - Meeting with Hydrogen Control Owners Group (11 page
: 8. Undated     Task 11 - Equipment Survivability Analysis Program.                                           (6pages)
'4.
: 9. Undated     Task 12 - Validation of Analytical Methods.                             (3pages)
01/31/85 w/ attached Equipment Survivability Analysis Program.
: 10. Undated     Time / Seconds - Cumulative Hydrogen Generation.                                     (1 page) t Note: 75% fees waived d
5.
02/13/85 Letter to Robert Bernero from S. H. Hobbs re: Hydrogen Control Owners Group 1/4 Scale Test Facility 3D-Complex Calorimeter HGN-027.
(13pages) 6.
Undated Proposed Agends fer the January 30 Meeting Between the Hydrogen Control Owners Group and Nuclear Regulatory Comission.
(1 page) 7.
Undated Task 9 - Diffusion Flame Therman Environment.
(5pages) 8.
Undated Task 11 - Equipment Survivability Analysis Program.
(6pages) 9.
Undated Task 12 - Validation of Analytical Methods.
(3pages)
: 10. Undated Time / Seconds - Cumulative Hydrogen Generation.
(1 page) t Note: 75% fees waived d
f
f
    , ,  -.  ,  .        ,-        ,  ,....,.c.   -
,....,.c.
                                                          .  ,      -.--,,_.n,
-.--,,_.n,
                                                                                        ,-~ - . - , , - . - . - - - .           . - - - ,}}
,-~ -. -,, -. -. - - -.
.}}

Latest revision as of 12:10, 12 December 2024

Response to FOIA Request for Documents Re 850130-31 Meetings Between NRC & Hydrogen Control Owners Group.Forwards Documents Listed in App
ML20129B070
Person / Time
Issue date: 03/12/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Hiatt S
OHIO CITIZENS FOR RESPONSIBLE ENERGY
Shared Package
ML20129B073 List:
References
FOIA-85-88 NUDOCS 8506050100
Download: ML20129B070 (2)


Text

(0ll- 0 W

/

UNITED STATES

[

p, NUCLEAR REGULATORY COMMISSION t;

j wAsmwaron, o. c.20sss

\\...../

MAR 12 W Ms. Susan L. Hiatt OCRE Representative 8275 Munson Road IN RESPONSE REFER Mentor, OH 44060 TO F01A-85-88 f

Dear Ms. Hiatt:

This is in response to your letter dated January 30, 1985, in which you requested, pursuant to the Freedom of Information Act, all records relating to the January 30 and 31, 1985, meeting between the Nuclear Regulatory Commission and the Hydrogen Control Owners Group held in Bethesda, Maryland.

The documents listed on the enclosed appendix are responsive to your request.

You will be billed separately by our Division of Accounting and Finance in the amount of $2.01 for the enclosed documents.

Sincerely, oL P-J. M. Felton, Director Division of Rules and Records Office of Administration

Enclosures:

As stated e

8506050100 850312 PDR FOIA HIATT85-88 PDR

Re: F01A-85-88 APPENDIX 1.

01/24/85 Memo for Elinor G. Adensam from Carl Stahle re: FORTHCOMING MEETING WITH HYDROGEN CONTROL OWNERS GROUP FOR ALL MARK III PLANTS w/ attached Meeting Notice Distribution.

(6pages) 2.

01/28/85 Talking Paper - STATUS OF ORNL MODELS FOR HYDROGEN GENERATION IN BWR CORES.

(2pages) 3.

Ol/30/P.5 Infonnation regarding Task 1 and Task 7.

(67pages)

Attendees - Meeting with Hydrogen Control Owners Group (11 page

'4.

01/31/85 w/ attached Equipment Survivability Analysis Program.

5.

02/13/85 Letter to Robert Bernero from S. H. Hobbs re: Hydrogen Control Owners Group 1/4 Scale Test Facility 3D-Complex Calorimeter HGN-027.

(13pages) 6.

Undated Proposed Agends fer the January 30 Meeting Between the Hydrogen Control Owners Group and Nuclear Regulatory Comission.

(1 page) 7.

Undated Task 9 - Diffusion Flame Therman Environment.

(5pages) 8.

Undated Task 11 - Equipment Survivability Analysis Program.

(6pages) 9.

Undated Task 12 - Validation of Analytical Methods.

(3pages)

10. Undated Time / Seconds - Cumulative Hydrogen Generation.

(1 page) t Note: 75% fees waived d

f

,....,.c.

-.--,,_.n,

,-~ -. -,, -. -. - - -.

.