ENS 45949: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 05/21/2010 13:00 MDT | | event date = 05/21/2010 13:00 MDT | ||
| last update date = 06/15/2010 | | last update date = 06/15/2010 | ||
| title = Agreement State Report- Calibration Source Not Returned | | title = Agreement State Report- Calibration Source Not Returned to Its Storage Holder | ||
| event text = The following information was received by e-mail: | | event text = The following information was received by e-mail: | ||
About 0930 Weatherford International, LTD. (ND Lic # 33-45901-01) reported that at about 1500, May 21, 2010, in Williston, Williams County, ND, a well logging tool was [returned to] the truck with the calibration source still in the tool. The calibration source is Cs-137, strength about 55.5 GBq. This error was discovered about 1500, May 21, 2010. The source, when in the tool is highly collimated, restricting significant potential dose to a limited volume. The dosimeter badges for those working in the vicinity of the truck and those in an adjacent office have been sent in to Landauer for analysis. Drawings and estimated doses will be forwarded to NRC as soon as received from Weatherford. | About 0930 Weatherford International, LTD. (ND Lic # 33-45901-01) reported that at about 1500, May 21, 2010, in Williston, Williams County, ND, a well logging tool was [returned to] the truck with the calibration source still in the tool. The calibration source is Cs-137, strength about 55.5 GBq. This error was discovered about 1500, May 21, 2010. The source, when in the tool is highly collimated, restricting significant potential dose to a limited volume. The dosimeter badges for those working in the vicinity of the truck and those in an adjacent office have been sent in to Landauer for analysis. Drawings and estimated doses will be forwarded to NRC as soon as received from Weatherford. |
Latest revision as of 21:09, 1 March 2018
Where | |
---|---|
Weatherford International Limited Williston, North Dakota (NRC Region 4) | |
License number: | 33-46901-01 |
Organization: | North Dakota Department Of Health |
Reporting | |
Agreement State | |
Time - Person (Reporting Time:+65.08 h2.712 days <br />0.387 weeks <br />0.0891 months <br />) | |
Opened: | Dan Harman 12:05 May 24, 2010 |
NRC Officer: | Vince Klco |
Last Updated: | Jun 15, 2010 |
45949 - NRC Website | |