ML20129E617: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 20: | Line 20: | ||
{{#Wiki_filter:_ | {{#Wiki_filter:_ | ||
N | N | ||
.. cy~ | |||
';I33 | |||
$36 US Naval assearch 1.aboratory ATTE: Dr. A. I. $shindler, Assectate Direeter Materials and General Sciences Code 6000 Washington, D.C. | |||
20575 Deer ler. Schiedlar: | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 27: | Line 29: | ||
All obligattens by parties have been met and the contract is officially alemed. | All obligattens by parties have been met and the contract is officially alemed. | ||
staserely, Paul J. Edgemerth, Chief. | staserely, Paul J. Edgemerth, Chief. | ||
Centrast h iminstration Seaties Technical Centrasts Breach Division of Centraste Office of Administration l | Centrast h iminstration Seaties Technical Centrasts Breach Division of Centraste Office of Administration l | ||
Enclosere As stated best SFawlickt. ERR l | |||
nDs.det.,Osu L | |||
useidea, DC l | |||
W 042 | |||
? | ? | ||
I' Tes:Dc resinc Daenise FJEdseworth 8507170013 850709 7/ /45 7/ /85 PDR CONTR NRC-03-79-116 PDR}} | |||
Tes:Dc | |||
Latest revision as of 11:33, 12 December 2024
| ML20129E617 | |
| Person / Time | |
|---|---|
| Issue date: | 07/09/1985 |
| From: | Edgeworth P NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Schindler A NAVY, DEPT. OF, NAVAL RESEARCH LAB. |
| Shared Package | |
| ML20129E623 | List: |
| References | |
| CON-FIN-B-6587, CON-NRC-03-79-116, CON-NRC-3-79-116 NUDOCS 8507170013 | |
| Download: ML20129E617 (1) | |
Text
_
N
.. cy~
';I33
$36 US Naval assearch 1.aboratory ATTE: Dr. A. I. $shindler, Assectate Direeter Materials and General Sciences Code 6000 Washington, D.C.
20575 Deer ler. Schiedlar:
SUBJECT:
C M SE-0UT OF CONTRACT MO. NBC-03-79-116 The septes of :the subject modificaties which you signed have been fully emesated en behalf of the U.S. Nuclear Begulatory Commissies, and ese copy is hereby returned to yes.
All obligattens by parties have been met and the contract is officially alemed.
staserely, Paul J. Edgemerth, Chief.
Centrast h iminstration Seaties Technical Centrasts Breach Division of Centraste Office of Administration l
Enclosere As stated best SFawlickt. ERR l
nDs.det.,Osu L
useidea, DC l
W 042
?
I' Tes:Dc resinc Daenise FJEdseworth 8507170013 850709 7/ /45 7/ /85 PDR CONTR NRC-03-79-116 PDR