{{#Wiki_filter:Commonweahh Rhson Company
{{#Wiki_filter:Commonweahh Rhson Company 15)run Generating Station e.
: e.        15)run Generating Station
,4450 North German Church Road
        ,    ,4450 North German Church Road
: 11) run,11. 610ID979 i Tcl H15-2315 411 October 22, 1996 LTR:
      .        11) run,11. 610ID979 i Tcl H15-2315 411 October 22, 1996                                                                       l LTR:             BYRON 96-0269 FILE:           1.10.0101                                                             i i
BYRON 96-0269 FILE:
U.S. Nuclear Regulatory Commission
1.10.0101 i
!      Washington, DC 20555                                                                   ]
i U.S. Nuclear Regulatory Commission
j 1
]
l ATTENTION: Document Control Desk
Washington, DC 20555 j
1 ATTENTION: Document Control Desk


==SUBJECT:==
==SUBJECT:==
Byron Nuclear' Power Station Units 1 and 2 Response to Notice of Violation l
Byron Nuclear' Power Station Units 1 and 2 Response to Notice of Violation Inspection Report No. 50-454/96008; 50-455/96008 j
Inspection Report No. 50-454/96008; 50-455/96008                       j NRC Docket Numbers 50-454, 50-455                                       '
NRC Docket Numbers 50-454, 50-455


==REFERENCE:==
==REFERENCE:==
Geoffrey E. Grant letter to Mr. Graesser dated                               j September 27, 1996, transmitting NRC Inspection                         l Report 50-454/96008; 50-455/96008                                       )
Geoffrey E. Grant letter to Mr. Graesser dated j
4            Enclosed is Commonwealth Edison Company's response to the Notice of               ,
September 27, 1996, transmitting NRC Inspection Report 50-454/96008; 50-455/96008
violation (NOV) which was transmitted with the referenced letter and                     !
)
Inspection Report. The NOV cited one (1) Severity Level IV violation                   ;
Enclosed is Commonwealth Edison Company's response to the Notice of 4
requiring a written response. Comed's response is provided in the attachment.           j This letter contains the following commitments:
violation (NOV) which was transmitted with the referenced letter and Inspection Report. The NOV cited one (1) Severity Level IV violation requiring a written response. Comed's response is provided in the attachment.
: 1.       The entire Byron RPT group will be evaluated, by Job Performance Measures, to determine whether or not this may be a Training or Attention to Detail issue, according to RP Policy 28, " Byron RP Dept. Self Assessments."
j This letter contains the following commitments:
: 2.       Byron RP will determine if additional positive controls are needed     ,
1.
in Low and High level tool storage areas, to prevent future           I occurrences.
The entire Byron RPT group will be evaluated, by Job Performance Measures, to determine whether or not this may be a Training or Attention to Detail issue, according to RP Policy 28, " Byron RP Dept. Self Assessments."
                                                                                                ]
2.
: 3.       RP and Training will track the Job Ferformance Measures being conducted to determine future Training requirements, if needed.
Byron RP will determine if additional positive controls are needed in Low and High level tool storage areas, to prevent future I
: 4.       The Byron Ccatracted RPT program Posting and Labeling Lesson Plans will be updated to include this event.
]
: 5.       Byron Training Dept. will determine if this event should be included in the Generic Contracted RPT Program taught at PTC and in Contracted Decon Laborer Training.
occurrences.
M0055                                                                                   ol #
3.
9610280160 961022 PDR     ADOCK 05000454 G                         PDR A l'nicom Company
RP and Training will track the Job Ferformance Measures being conducted to determine future Training requirements, if needed.
4.
The Byron Ccatracted RPT program Posting and Labeling Lesson Plans will be updated to include this event.
5.
Byron Training Dept. will determine if this event should be included in the Generic Contracted RPT Program taught at PTC and in Contracted Decon Laborer Training.
M0055 ol 9610280160 961022 PDR ADOCK 05000454 G
PDR A l'nicom Company


    - . .. . . - . - . . . .                  . . ..    ~ . . . . - - . . . . . . . . - . , . - - - . - - ~ - . . - . .        . . - - - _ - . - . . .
~...
4 j
. - -........ -.,. - - -. - - ~ -.. -..
I 1
4j I
1 Byron Ltr: 96-0269                                                                                                       ,
1 1
i October 22, 1996
Byron Ltr: 96-0269 i
:                                Page 2 4
October 22, 1996 Page 2 4
* t i
t i
i                                           6.         The following procedures will be added to RP required reading                                     ;
i 6.
4 during 4th quarter Continuing Training:                                                           .i BRP 5010-1, " Radiation Posting and Labeling Requirements"                                         l 4
The following procedures will be added to RP required reading during 4th quarter Continuing Training:
j'                                                     BAP 720-3, " Control and Release of Materials in the RPA" 1                                                                                                                                                           i i
4
;                                            7         Byron RP will determine the feasibility of posting all tool and equipment storage cages as Radiation Areas.
. i BRP 5010-1, " Radiation Posting and Labeling Requirements" l
5'
4 j'
;                                            If your staff has any questions or comments concerning this letter, 4-
BAP 720-3, " Control and Release of Materials in the RPA" 1
                              'please refer them to Don Brindle, Regulatory Assurance Supervisor, at
i i
;-                                (815)234-5441 ext. 2280.
7 Byron RP will determine the feasibility of posting all tool and equipment storage cages as Radiation Areas.
5' If your staff has any questions or comments concerning this letter, 4-
'please refer them to Don Brindle, Regulatory Assurance Supervisor, at (815)234-5441 ext. 2280.
l 1
l 1
Respectfully, f
Respectfully, f
i                                     ,
i
                            ) K. L. Grae er j                        F Site Vice President j                               Byron Nuclear Power Station i
) K. L. Grae er F Site Vice President j
4 KLG/DB/rp i
j Byron Nuclear Power Station i
!                                Attachment (s)
4*
I cc:     A.       B. Beach, NRC Regional Administrator - RIII G. F. Dick Jr., Byron Project Manager - NRR S.       D. Burgess, Senior Resident Inspector, Byron R.     D. Lanksbury, Reactor Projects Chief - RIII F.       Niziolek, Division of Engineering - IDNS D.       L. Farrar, Nuclear Regulatory Services Manager, Downers Grove Safety Review Dept, c/o Document Control Desk, 3rd Floor, Downers Grove                                         ;
KLG/DB/rp i
DCD-Licensing, Suite 400, Dowers Grove.
Attachment (s)
I cc:
A.
B.
Beach, NRC Regional Administrator - RIII G.
F. Dick Jr., Byron Project Manager - NRR S. D. Burgess, Senior Resident Inspector, Byron R. D. Lanksbury, Reactor Projects Chief - RIII F. Niziolek, Division of Engineering - IDNS D.
L. Farrar, Nuclear Regulatory Services Manager, Downers Grove Safety Review Dept, c/o Document Control Desk, 3rd Floor, Downers Grove DCD-Licensing, Suite 400, Dowers Grove.
{
{
i l-                                                                                                                                                         )
i l-
)
i 1
i 1
1 4
1 4
Line 76: Line 92:
l.
l.
J j
J j
(pn96byttrs\960269.wpfi1022%)
(pn96byttrs\\960269.wpfi1022%)
i 3
i 3
c       -      +-         .                                                  . , . -
c
+-
r.
r


  . _. _ _ _ . _ _ . _              _    _ ._ __      _  m . . . . - . ._. . _ - . _ . _ _ _ . - . . _ _ . . -. . . _ . - . _ m . _ _ _ _ _ _ _
m.... -.._.. _ -. _.
ATTACHMENT I VIOLATION (454/455-96008-01) 10 CFR 20.1902 (a) requires that the licensee post each radiation area with a conspicuous sign or signs bearing the radiation symbol and the words " CAUTION,                                               ,
m ATTACHMENT I VIOLATION (454/455-96008-01) 10 CFR 20.1902 (a) requires that the licensee post each radiation area with a conspicuous sign or signs bearing the radiation symbol and the words " CAUTION, RADIATION AREA."
RADIATION AREA."
Contrary to the above, on September 5,1996, the area outside the high level tool storage area on the 346' elevation of the Auxiliary Building, a radiation area with a radiation dose rate of approximately eight millirem in one hour at 30 cm from the surface that the radiation penetrated was not posted with a sign bearing the radiation symbol and the words " CAUTION, RADIATION AREA."
Contrary to the above, on September 5,1996, the area outside the high level tool storage area on the 346' elevation of the Auxiliary Building, a radiation area with a radiation dose rate of approximately eight millirem in one hour at 30 cm from the surface that the radiation penetrated was not posted with a sign bearing the radiation symbol and the words " CAUTION, RADIATION AREA."
This is a Severity Level IV violation (Supplement I) .
This is a Severity Level IV violation (Supplement I).
REASON FOR THE VIOLATION A Contracted Decontamination Laborer moved a barrel and vacuum cleaner out of the high level tool storage area on the 346 elevation in the Auxiliary Building in order to move additional barrels into the area. When he moved them back into the                                             t cage he placed them next to the cage boundary, not back to their original location.           He was unaware of the Federal Regulations concerning storage of radioactive material.
REASON FOR THE VIOLATION A Contracted Decontamination Laborer moved a barrel and vacuum cleaner out of the high level tool storage area on the 346 elevation in the Auxiliary Building in order to move additional barrels into the area. When he moved them back into the t
cage he placed them next to the cage boundary, not back to their original location.
He was unaware of the Federal Regulations concerning storage of radioactive material.
CORRECTIVE STEPS TAKEN AND RESULTS ACHIEVED i
CORRECTIVE STEPS TAKEN AND RESULTS ACHIEVED i
: 1.         Radiation Protection, upon notification of the discrepancy, immediately                                           l l                                 surveyed the cage, and moved the equipment to a proper position in the cage.
1.
: 2.         A re-creation of the scene was performed to determine exact dose                                                   J l                                 rates and posting requirements.                                                                                     J l
Radiation Protection, upon notification of the discrepancy, immediately l
l
l surveyed the cage, and moved the equipment to a proper position in the cage.
: 3.         The Contracted RPT group was tailgated on posting and labeling requirements.
2.
L
A re-creation of the scene was performed to determine exact dose J
: 4.         Byron HPS notified the NRC Inspector of this investigation and the                                                   i procedural requirements of the High Level tool storage cages.
l rates and posting requirements.
: 5.         The Byron RP department completed a survey sweep of all tool and                                                     l equipment storage cages to insure proper postings and labelings.                                                     l I
J l
l 3.
The Contracted RPT group was tailgated on posting and labeling requirements.
L 4.
Byron HPS notified the NRC Inspector of this investigation and the i
procedural requirements of the High Level tool storage cages.
5.
The Byron RP department completed a survey sweep of all tool and equipment storage cages to insure proper postings and labelings.
r 4
r 4
5 (p:\96byttn\960269.wpfi1022%)
5 (p:\\96byttn\\960269.wpfi1022%)
i I,                                                   _                        .                          __ . . _ . .            _
i I,
y
y


  - . . . .      .      - _ . - . - . . -              .                    - -    . - - - - - - - - - - . ~ - - - -
. - - - - - - - - - -. ~ - - - -
i 8-       .
i 8-I t
              . .        I                                                                                                   t
)
)                                                                                                                             ;
CORRECTIVE STEPS THAT WILL BE TAKEN TO AVOID FURTHER VIOLATION 4
4 CORRECTIVE STEPS THAT WILL BE TAKEN TO AVOID FURTHER VIOLATION                                               '
1 i.
1
The entire Byron RPT group will be evaluated, by Job Performance j
;              i.         The entire Byron RPT group will be evaluated, by Job Performance                                 ,
Measures, to determine whether or not this may be a Training or l
j Measures, to determine whether or not this may be a Training or                                   l Attention to Detail issue, according to RP Policy 28, " Byron RP Dept.
Attention to Detail issue, according to RP Policy 28, " Byron RP Dept.
l                           Self Assessments." NTS item 455-200-96-0009-01 will track this action.
l Self Assessments." NTS item 455-200-96-0009-01 will track this action.
J
J 2.
;              2.         Byron RP will determine if additional positive controls are needed in                             ,i Low and High level tool storage areas, to prevent future occurrences.                             l
Byron RP will determine if additional positive controls are needed in Low and High level tool storage areas, to prevent future occurrences.
}                           NTS item 65-200-96-0009-02 will track this action, f               3.         RP and Training will track the Job Performance Measures being conducted to determine future Training requirements, if needed. NTS item 455-200-96-0009-03 will track this action.
l
: 4.         The Byron Contracted RPT program Posting and Labeling Lesson Plans will be updated to include this event. NTS item 455-200-96-0009-04 will track this action.
}
: 5.         Byron Training Dept. will determine if this event should be included in the Generic .Ontracted RPT Program tnaght at PTC and in Contracted Decon Laborer Training. NTS item 455-200-96-0009-05 will track this action.
NTS item 65-200-96-0009-02 will track this action, f
: 6.         The following procedures will be added to RP required reading during 4th quarter Continuing Training:
3.
RP and Training will track the Job Performance Measures being conducted to determine future Training requirements, if needed. NTS item 455-200-96-0009-03 will track this action.
4.
The Byron Contracted RPT program Posting and Labeling Lesson Plans will be updated to include this event. NTS item 455-200-96-0009-04 will track this action.
5.
Byron Training Dept. will determine if this event should be included in the Generic.Ontracted RPT Program tnaght at PTC and in Contracted Decon Laborer Training. NTS item 455-200-96-0009-05 will track this action.
6.
The following procedures will be added to RP required reading during 4th quarter Continuing Training:
BRP 5010-1, " Radiation Posting and Labeling Requirements" BAP 720-3, " Control and Release of Materials in the RPA" NTS item 455-200-96-0009-06 will track this action.
BRP 5010-1, " Radiation Posting and Labeling Requirements" BAP 720-3, " Control and Release of Materials in the RPA" NTS item 455-200-96-0009-06 will track this action.
: 7.         Byron RP will determine the feasibility of posting all tool and equipment storage cages as Radiation Areas. NTS item 455-200-96-0009-08 will track this action.
7.
DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Full compliance was achieved on 9/05/96 when material within the cage had been                               j re-positioned and a re-survey of the area conducted to ensure radiation levels                               l were within the posting limits.                                                                               l (pA96byttrs\960269.wpfi1022%)
Byron RP will determine the feasibility of posting all tool and equipment storage cages as Radiation Areas. NTS item 455-200-96-0009-08 will track this action.
                                              .      .            .    ..__ _                                ,_ _ _      ,}}
DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Full compliance was achieved on 9/05/96 when material within the cage had been j
re-positioned and a re-survey of the area conducted to ensure radiation levels were within the posting limits.
(pA96byttrs\\960269.wpfi1022%)
,}}

Latest revision as of 11:32, 12 December 2024

Responds to NRC Re Violations Noted in Insp Repts 50-454/96-08 & 50-455/96-08.Corrective Actions:Surveyed Cage & Moved Equipment to Proper Position,Performed re- Creation of Scene & Tailgated Contracted RPT Group
ML20129E770
Person / Time
Site: Byron  
Issue date: 10/22/1996
From: Graesser K
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BYRON-96-0269, BYRON-96-269, NUDOCS 9610280160
Download: ML20129E770 (4)


Text

Commonweahh Rhson Company 15)run Generating Station e.

,4450 North German Church Road

11) run,11. 610ID979 i Tcl H15-2315 411 October 22, 1996 LTR:

BYRON 96-0269 FILE:

1.10.0101 i

i U.S. Nuclear Regulatory Commission

]

Washington, DC 20555 j

1 ATTENTION: Document Control Desk

SUBJECT:

Byron Nuclear' Power Station Units 1 and 2 Response to Notice of Violation Inspection Report No. 50-454/96008; 50-455/96008 j

NRC Docket Numbers 50-454, 50-455

REFERENCE:

Geoffrey E. Grant letter to Mr. Graesser dated j

September 27, 1996, transmitting NRC Inspection Report 50-454/96008; 50-455/96008

)

Enclosed is Commonwealth Edison Company's response to the Notice of 4

violation (NOV) which was transmitted with the referenced letter and Inspection Report. The NOV cited one (1) Severity Level IV violation requiring a written response. Comed's response is provided in the attachment.

j This letter contains the following commitments:

1.

The entire Byron RPT group will be evaluated, by Job Performance Measures, to determine whether or not this may be a Training or Attention to Detail issue, according to RP Policy 28, " Byron RP Dept. Self Assessments."

2.

Byron RP will determine if additional positive controls are needed in Low and High level tool storage areas, to prevent future I

]

occurrences.

3.

RP and Training will track the Job Ferformance Measures being conducted to determine future Training requirements, if needed.

4.

The Byron Ccatracted RPT program Posting and Labeling Lesson Plans will be updated to include this event.

5.

Byron Training Dept. will determine if this event should be included in the Generic Contracted RPT Program taught at PTC and in Contracted Decon Laborer Training.

M0055 ol 9610280160 961022 PDR ADOCK 05000454 G

PDR A l'nicom Company

~...

. - -........ -.,. - - -. - - ~ -.. -..

4j I

1 1

Byron Ltr: 96-0269 i

October 22, 1996 Page 2 4

t i

i 6.

The following procedures will be added to RP required reading during 4th quarter Continuing Training:

4

. i BRP 5010-1, " Radiation Posting and Labeling Requirements" l

4 j'

BAP 720-3, " Control and Release of Materials in the RPA" 1

i i

7 Byron RP will determine the feasibility of posting all tool and equipment storage cages as Radiation Areas.

5' If your staff has any questions or comments concerning this letter, 4-

'please refer them to Don Brindle, Regulatory Assurance Supervisor, at (815)234-5441 ext. 2280.

l 1

Respectfully, f

i

) K. L. Grae er F Site Vice President j

j Byron Nuclear Power Station i

4*

KLG/DB/rp i

Attachment (s)

I cc:

A.

B.

Beach, NRC Regional Administrator - RIII G.

F. Dick Jr., Byron Project Manager - NRR S. D. Burgess, Senior Resident Inspector, Byron R. D. Lanksbury, Reactor Projects Chief - RIII F. Niziolek, Division of Engineering - IDNS D.

L. Farrar, Nuclear Regulatory Services Manager, Downers Grove Safety Review Dept, c/o Document Control Desk, 3rd Floor, Downers Grove DCD-Licensing, Suite 400, Dowers Grove.

{

i l-

)

i 1

1 4

1 4

l.

J j

(pn96byttrs\\960269.wpfi1022%)

i 3

c

+-

r.

r

m.... -.._.. _ -. _.

m ATTACHMENT I VIOLATION (454/455-96008-01) 10 CFR 20.1902 (a) requires that the licensee post each radiation area with a conspicuous sign or signs bearing the radiation symbol and the words " CAUTION, RADIATION AREA."

Contrary to the above, on September 5,1996, the area outside the high level tool storage area on the 346' elevation of the Auxiliary Building, a radiation area with a radiation dose rate of approximately eight millirem in one hour at 30 cm from the surface that the radiation penetrated was not posted with a sign bearing the radiation symbol and the words " CAUTION, RADIATION AREA."

This is a Severity Level IV violation (Supplement I).

REASON FOR THE VIOLATION A Contracted Decontamination Laborer moved a barrel and vacuum cleaner out of the high level tool storage area on the 346 elevation in the Auxiliary Building in order to move additional barrels into the area. When he moved them back into the t

cage he placed them next to the cage boundary, not back to their original location.

He was unaware of the Federal Regulations concerning storage of radioactive material.

CORRECTIVE STEPS TAKEN AND RESULTS ACHIEVED i

1.

Radiation Protection, upon notification of the discrepancy, immediately l

l surveyed the cage, and moved the equipment to a proper position in the cage.

2.

A re-creation of the scene was performed to determine exact dose J

l rates and posting requirements.

J l

l 3.

The Contracted RPT group was tailgated on posting and labeling requirements.

L 4.

Byron HPS notified the NRC Inspector of this investigation and the i

procedural requirements of the High Level tool storage cages.

5.

The Byron RP department completed a survey sweep of all tool and equipment storage cages to insure proper postings and labelings.

r 4

5 (p:\\96byttn\\960269.wpfi1022%)

i I,

y

. - - - - - - - - - -. ~ - - - -

i 8-I t

)

CORRECTIVE STEPS THAT WILL BE TAKEN TO AVOID FURTHER VIOLATION 4

1 i.

The entire Byron RPT group will be evaluated, by Job Performance j

Measures, to determine whether or not this may be a Training or l

Attention to Detail issue, according to RP Policy 28, " Byron RP Dept.

l Self Assessments." NTS item 455-200-96-0009-01 will track this action.

J 2.

Byron RP will determine if additional positive controls are needed in Low and High level tool storage areas, to prevent future occurrences.

l

}

NTS item 65-200-96-0009-02 will track this action, f

3.

RP and Training will track the Job Performance Measures being conducted to determine future Training requirements, if needed. NTS item 455-200-96-0009-03 will track this action.

4.

The Byron Contracted RPT program Posting and Labeling Lesson Plans will be updated to include this event. NTS item 455-200-96-0009-04 will track this action.

5.

Byron Training Dept. will determine if this event should be included in the Generic.Ontracted RPT Program tnaght at PTC and in Contracted Decon Laborer Training. NTS item 455-200-96-0009-05 will track this action.

6.

The following procedures will be added to RP required reading during 4th quarter Continuing Training:

BRP 5010-1, " Radiation Posting and Labeling Requirements" BAP 720-3, " Control and Release of Materials in the RPA" NTS item 455-200-96-0009-06 will track this action.

7.

Byron RP will determine the feasibility of posting all tool and equipment storage cages as Radiation Areas. NTS item 455-200-96-0009-08 will track this action.

DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Full compliance was achieved on 9/05/96 when material within the cage had been j

re-positioned and a re-survey of the area conducted to ensure radiation levels were within the posting limits.

(pA96byttrs\\960269.wpfi1022%)

,