{{#Wiki_filter:7 g     a lilinois Power Cornpany Chnton Power Station             l P O. Box 678 I
{{#Wiki_filter:7 g
Chnton. IL 61727 Tel 217 935-8881 U-602643 September 22,1996                     PRl[M ROUTING                      i gg Docket No. 50-461                                                   VRA            4        RC              !
a lilinois Power Cornpany Chnton Power Station l
v DRA       T         EIC               [
P O. Box 678 Chnton. IL 61727 I
SGA' Mr. A. B. (Bill) Beach                                         NnH ORP v DRS         4-       Ol               i Regional Admmistrator UNus 1
Tel 217 935-8881 U-602643 PRl[M ROUTING September 22,1996 i
PAO             -
gg VRA 4
Region III DRMA U.S. Nuclear Regulatory Commiss. ion                                                                         ,
RC Docket No. 50-461 v DRA T EIC
                  .801 Warrenville Road Lisle, Illinois 60532-4351                                                 FILE _       b                  !
[
H ORP SGA' Mr. A. B. (Bill) Beach Nnv DRS 4-Ol i
Regional Admmistrator 1 PAO UNus Region III DRMA U.S. Nuclear Regulatory Commiss. ion
.801 Warrenville Road b
Lisle, Illinois 60532-4351 FILE _


==Subject:==
==Subject:==
Revised Assessment Report of September 5-6,1996                                             I Reactor Recirculation Pump Seal Failure and                                                 ;
Revised Assessment Report of September 5-6,1996 I
Anem4=taA Plant Shutdown at Clinton Power Station                                             )
Reactor Recirculation Pump Seal Failure and Anem4=taA Plant Shutdown at Clinton Power Station
)


==Dear Mr. Beach:==
==Dear Mr. Beach:==
i Enclosed is a revised assessment report concerning the actions and decisions                         !
i Enclosed is a revised assessment report concerning the actions and decisions involved in the September 5-6,1996 reactor recirculation pump seal failure and associated shutdown at Clinton Power Station (CPS). This report is a revision of the report 2
involved in the September 5-6,1996 reactor recirculation pump seal failure and associated                       I shutdown at Clinton Power Station (CPS). This report is a revision of the report                             2 originally provided by Illinois Power (IP) letter U-602637 dated September 16,1996 in                         j response to your September 11,1996 Confirmatory Action Letter.
originally provided by Illinois Power (IP) letter U-602637 dated September 16,1996 in j
response to your September 11,1996 Confirmatory Action Letter.
l Our assessment report was revised to more clearly indicate in the body of the report the specific procedure noncompliances that occurred during this event and to include the results of additional considerations and information identified from ongoing assessment since submittal of the original report. We intend to discuss the conclusions of the report during the management meeting scheduled on Monday, September 23,1996.
l Our assessment report was revised to more clearly indicate in the body of the report the specific procedure noncompliances that occurred during this event and to include the results of additional considerations and information identified from ongoing assessment since submittal of the original report. We intend to discuss the conclusions of the report during the management meeting scheduled on Monday, September 23,1996.
Sincerely yours, o             ~
Sincerely yours, o
Richard F. Phares                            ,      ,
Manager-Nuclear Assessment
                                                                                                                                  ]
l    ;
TBE/csm                                                                                  /
Enclosure -                                                                                              l      l
~
~
                                                                                                                                'l 9610010257 960922 PDR ADOCK 05000461                                                                                                       '
Richard F. Phares
S                        PDR               _  j
]
: y.                                                                                        BEP t s 88
Manager-Nuclear Assessment l
/
TBE/csm Enclosure -
l
~
'l 9610010257 960922 PDR ADOCK 05000461 S
PDR j
BEP t s 88 y.


U-602643 l
U-602643 l
Page 2 l-cc:         NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Illinois Department ofNuclear Safety Document Control Desk
Page 2 l-cc:
NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Illinois Department ofNuclear Safety Document Control Desk
{
{
l 1
l 1
l l
l l
l l
l lC}}
C}}

Latest revision as of 11:28, 12 December 2024

Forwards Revised Special Assessment:Confirmatory Action Ltr Dtd 960911, Involving 960905-06 Reactor Recirculation Pump Seal Failure & Associated Shutdown at Plant
ML20129F118
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/22/1996
From: Phares R
ILLINOIS POWER CO.
To: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20129F121 List:
References
CAL, U-602643, NUDOCS 9610010257
Download: ML20129F118 (2)


Text

7 g

a lilinois Power Cornpany Chnton Power Station l

P O. Box 678 Chnton. IL 61727 I

Tel 217 935-8881 U-602643 PRl[M ROUTING September 22,1996 i

gg VRA 4

RC Docket No. 50-461 v DRA T EIC

[

H ORP SGA' Mr. A. B. (Bill) Beach Nnv DRS 4-Ol i

Regional Admmistrator 1 PAO UNus Region III DRMA U.S. Nuclear Regulatory Commiss. ion

.801 Warrenville Road b

Lisle, Illinois 60532-4351 FILE _

Subject:

Revised Assessment Report of September 5-6,1996 I

Reactor Recirculation Pump Seal Failure and Anem4=taA Plant Shutdown at Clinton Power Station

)

Dear Mr. Beach:

i Enclosed is a revised assessment report concerning the actions and decisions involved in the September 5-6,1996 reactor recirculation pump seal failure and associated shutdown at Clinton Power Station (CPS). This report is a revision of the report 2

originally provided by Illinois Power (IP) letter U-602637 dated September 16,1996 in j

response to your September 11,1996 Confirmatory Action Letter.

l Our assessment report was revised to more clearly indicate in the body of the report the specific procedure noncompliances that occurred during this event and to include the results of additional considerations and information identified from ongoing assessment since submittal of the original report. We intend to discuss the conclusions of the report during the management meeting scheduled on Monday, September 23,1996.

Sincerely yours, o

~

Richard F. Phares

]

Manager-Nuclear Assessment l

/

TBE/csm Enclosure -

l

~

'l 9610010257 960922 PDR ADOCK 05000461 S

PDR j

BEP t s 88 y.

U-602643 l

Page 2 l-cc:

NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Illinois Department ofNuclear Safety Document Control Desk

{

l 1

l l

l lC