Line 16: Line 16:
| event date = 05/04/2011 CDT
| event date = 05/04/2011 CDT
| last update date = 05/04/2011
| last update date = 05/04/2011
| title = Pressure Switch With Possible Sub-Standard Electrical Lead Terminations
| title = Pressure Switch with Possible Sub-Standard Electrical Lead Terminations
| event text = SOR Process Instruments has determined that certain model pressure switches it has manufactured may have leads attached to the terminal blocks that are not in conformance with good manufacturing practice.  The pressure switches in question may have lead wire attached to the terminal block in which the connection between the stripped, stranded wire and a crimped terminal may not be flush with the terminal end.  SOR states that there have been no known field problems associated with this issue.   
| event text = SOR Process Instruments has determined that certain model pressure switches it has manufactured may have leads attached to the terminal blocks that are not in conformance with good manufacturing practice.  The pressure switches in question may have lead wire attached to the terminal block in which the connection between the stripped, stranded wire and a crimped terminal may not be flush with the terminal end.  SOR states that there have been no known field problems associated with this issue.   
This condition applies to SOR model switches with terminal block "X" options 9013-737, 9013-747, 9013-7674.  SOR has provided this information to those customers that purchased these switches.  The U.S. plants that received these switches are Braidwood and Duane Arnold.
This condition applies to SOR model switches with terminal block "X" options 9013-737, 9013-747, 9013-7674.  SOR has provided this information to those customers that purchased these switches.  The U.S. plants that received these switches are Braidwood and Duane Arnold.

Latest revision as of 22:07, 1 March 2018

ENS 46821 +/-
Where
Sor Inc Process Instrumentation
Lenexa, Kansas (NRC Region 4)
Organization: Sor Inc Process Instrumentation
Reporting
10 CFR 21.21
Time - Person (Reporting Time:+7.23 h0.301 days <br />0.043 weeks <br />0.0099 months <br />)
Opened: Colbert Turney
12:14 May 4, 2011
NRC Officer: Bill Huffman
Last Updated: May 4, 2011