ENS 47694: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 02/23/2012 09:00 CST
| event date = 02/23/2012 09:00 CST
| last update date = 02/23/2012
| last update date = 02/23/2012
| title = Offsite Notification Due To An Intake Structure Oil Spill
| title = Offsite Notification Due to an Intake Structure Oil Spill
| event text = On February 23, 2012, at 0900 CST, an oil leak was identified from a gear box in the intake structure that had leaked into the circulating water cell.  Prompt action was taken to stop the leak. Less than or equal to 1 pint of oil was spilled into the circulating water cell and, subsequently, to the Missouri River.  The spill has been stopped and clean up of the oil sheen in the intake cell is proceeding.  A visible oil sheen was noted on the Missouri River downstream of the station's intake structure near the station's outfall.  The gear box has been drained to prevent any further leakage.  Notifications will be made per Fort Calhoun Nuclear Station's National Pollutant Discharge Elimination System (NPDES) permit.  Samples will be taken for off site analysis to determine the quantity of oil discharged.  The State of Nebraska, Department of Environmental Quality and National Response Center will be notified.
| event text = On February 23, 2012, at 0900 CST, an oil leak was identified from a gear box in the intake structure that had leaked into the circulating water cell.  Prompt action was taken to stop the leak. Less than or equal to 1 pint of oil was spilled into the circulating water cell and, subsequently, to the Missouri River.  The spill has been stopped and clean up of the oil sheen in the intake cell is proceeding.  A visible oil sheen was noted on the Missouri River downstream of the station's intake structure near the station's outfall.  The gear box has been drained to prevent any further leakage.  Notifications will be made per Fort Calhoun Nuclear Station's National Pollutant Discharge Elimination System (NPDES) permit.  Samples will be taken for off site analysis to determine the quantity of oil discharged.  The State of Nebraska, Department of Environmental Quality and National Response Center will be notified.
This notification is being made in accordance with 10 CFR 50.72(b)(2)(xi), 4 hour non-emergency notification due to a notification being made to a Government Agency (State of Nebraska, Department of Environmental Quality and National Response Center).
This notification is being made in accordance with 10 CFR 50.72(b)(2)(xi), 4 hour non-emergency notification due to a notification being made to a Government Agency (State of Nebraska, Department of Environmental Quality and National Response Center).

Latest revision as of 22:04, 1 March 2018

ENS 47694 +/-
Where
Fort Calhoun Omaha Public Power District icon.png
Nebraska (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release
Time - Person (Reporting Time:+-2.13 h-0.0888 days <br />-0.0127 weeks <br />-0.00292 months <br />)
Opened: Scott Moeck
12:52 Feb 23, 2012
NRC Officer: Vince Klco
Last Updated: Feb 23, 2012
47694 - NRC Website
Loading map...