ENCLOSURE 1 NOTICE OF VIOLATION Florida Power and Light Company   Docket No. 50-389 St. Lucie Unit 2   License ."o. NPF-16 The following violation was identified during an inspection conducted on June 11 - July 8,1985. The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).
ENCLOSURE 1 NOTICE OF VIOLATION Florida Power and Light Company Docket No.
 
50-389 St. Lucie Unit 2 License."o.
 
NPF-16 The following violation was identified during an inspection conducted on June 11 - July 8,1985.
 
The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).


10 CFR 50, Appendix B, Criterion V, as ' implemented by section 5.0 of FP&L Topical Quality Assurance Report, requires, in part, that activities affecting quality be prescribed by documented instructions, procedures and drawings and shall be accomplished in accordance with these instructions,
10 CFR 50, Appendix B, Criterion V, as ' implemented by section 5.0 of FP&L Topical Quality Assurance Report, requires, in part, that activities affecting quality be prescribed by documented instructions, procedures and drawings and shall be accomplished in accordance with these instructions,
  ' procedures and drawing Contrary to the above, plant modifications were performed on Unit 2 in 1984 per plant change / modification (PC/M)-015-283 which added redundant over-current devices to electrical distribution systems to comply with NRC Regulatory Guides 1.63 and 1.75. The addition of these devices resulted in some safety-related relays no longer being testable with the unit at powe On June 26, 1985, an attempt was made to perform Operating Procedure (0P)
' procedures and drawings.
2-0400053, Engineered Safeguards Relay Test, for Semi-annual Surveillanc The PC/M did not modify the procedures to prevent testing of certain relay This resulted in a plant transient that almost tripped the reacto This is a Severity Level V violation (Supplement I).


Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice a written statement or explanation in reply
Contrary to the above, plant modifications were performed on Unit 2 in 1984 per plant change / modification (PC/M)-015-283 which added redundant over-current devices to electrical distribution systems to comply with NRC Regulatory Guides 1.63 and 1.75. The addition of these devices resulted in some safety-related relays no longer being testable with the unit at power.
.
 
including: (1) admission or denial of the alleged violations; (2) the reasons
On June 26, 1985, an attempt was made to perform Operating Procedure (0P)
, for the violations if admitted; (3) the corrective steps which have been taken
2-0400053, Engineered Safeguards Relay Test, for Semi-annual Surveillance.
: and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieve Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d)
 
or 10 CFR 73.2 '
The PC/M did not modify the procedures to prevent testing of certain relays.
'       '
 
This resulted in a plant transient that almost tripped the reactor.
 
This is a Severity Level V violation (Supplement I).
 
Pursuant to 10 CFR 2.201, you are required to submit to this office within 30
.
days of the date of this Notice a written statement or explanation in reply including:
(1) admission or denial of the alleged violations; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken
,
:
and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.
 
Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d)
or 10 CFR 73.21.
 
'
JUL 191985
'
'
Date:
Date:
JUL 191985
,
,
f G
f G
.
-
}}
}}

Latest revision as of 08:25, 12 December 2024

Notice of Violation from Insp on 850611-0708
ML20133F601
Person / Time
Site: Saint Lucie, Hermes  NextEra Energy icon.png
Issue date: 07/19/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20133F573 List:
References
50-389-85-17, NUDOCS 8508080356
Download: ML20133F601 (1)


Text

,

<

.

.-

_

s

.

ENCLOSURE 1 NOTICE OF VIOLATION Florida Power and Light Company Docket No.

50-389 St. Lucie Unit 2 License."o.

NPF-16 The following violation was identified during an inspection conducted on June 11 - July 8,1985.

The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

10 CFR 50, Appendix B, Criterion V, as ' implemented by section 5.0 of FP&L Topical Quality Assurance Report, requires, in part, that activities affecting quality be prescribed by documented instructions, procedures and drawings and shall be accomplished in accordance with these instructions,

' procedures and drawings.

Contrary to the above, plant modifications were performed on Unit 2 in 1984 per plant change / modification (PC/M)-015-283 which added redundant over-current devices to electrical distribution systems to comply with NRC Regulatory Guides 1.63 and 1.75. The addition of these devices resulted in some safety-related relays no longer being testable with the unit at power.

On June 26, 1985, an attempt was made to perform Operating Procedure (0P)

2-0400053, Engineered Safeguards Relay Test, for Semi-annual Surveillance.

The PC/M did not modify the procedures to prevent testing of certain relays.

This resulted in a plant transient that almost tripped the reactor.

This is a Severity Level V violation (Supplement I).

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30

.

days of the date of this Notice a written statement or explanation in reply including:

(1) admission or denial of the alleged violations; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken

,

and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.

Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d)

or 10 CFR 73.21.

'

JUL 191985

'

'

Date:

,

f G

.

-