[g>.R MCy k                             UNITED STATES
[g>.R MCy k UNITED STATES NUCLEAR REGULATORY COMMISSION o
    ;              ,        NUCLEAR REGULATORY COMMISSION o
WASHINGTON, D.C. 20555-0001
* WASHINGTON, D.C. 20555-0001
.....,o January 15, 1997 MEMORANDUM T0:
      . . . . . ,o                             January 15, 1997 MEMORANDUM T0:       David B. Matthews, Chief Generic Issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:               Stewart L. Magruder, Project Manager Generic Issues and Environmental           MN Projects Branch                                                     l Division of Reactor Program Management                                 )
David B. Matthews, Chief Generic Issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:
Stewart L. Magruder, Project Manager Generic Issues and Environmental MN Projects Branch Division of Reactor Program Management
)
Office of Nuclear Reactor Regulation
Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF JANUARY 23, 1996, MEETING WITH ABB COMBUSTION ENGINEERING REGARDING REVISION TO SMALL BREAK LOSS-0F-COOLANT ACCIDENT EVALUATION MODEL On January 23, 1996, representatives of ABB Combustion Engineering (ABB-CE) and Entergy Operations, Incorporated met with representatives of the Nuclear               i Regulatory Commission (NRC) at the NRC's offices in Rockville, Maryland.
OF JANUARY 23, 1996, MEETING WITH ABB COMBUSTION ENGINEERING REGARDING REVISION TO SMALL BREAK LOSS-0F-COOLANT ACCIDENT EVALUATION MODEL On January 23, 1996, representatives of ABB Combustion Engineering (ABB-CE) and Entergy Operations, Incorporated met with representatives of the Nuclear Regulatory Commission (NRC) at the NRC's offices in Rockville, Maryland.
Attachment 1 provides a list of meeting attendees.
' provides a list of meeting attendees.
The purpose of the meeting was to discuss the process for review of a proposed revision to the ABB-CE Small Break Loss of Coolant Accident (SBLOCA) Emergency Core Cooling System safety analysis methods. In a {{letter dated|date=February 13, 1996|text=letter dated February 13, 1996}}, ABB-CE stated that they considered parts of the meeting presentation material to be proprietary information. In a {{letter dated|date=June 7, 1996|text=letter dated June 7, 1996}}, ABB-CE submitted a non-proprietary version of the presentation material.     In a {{letter dated|date=December 12, 1996|text=letter dated December 12, 1996}}, the NRC agreed with ABB-CE's proprietary determination and agreed to withhold portions of the presentation material from public disclosure. Attachment 2 contains the non-proprietary presentation material.
The purpose of the meeting was to discuss the process for review of a proposed revision to the ABB-CE Small Break Loss of Coolant Accident (SBLOCA) Emergency Core Cooling System safety analysis methods.
The ABB-CE representatives opened the meeting with a short discussion of the background of the ABB-CE SBLOCA code submittals. The Entergy representative discussed the potential application of the revised SBLOCA evaluation model (EM) and the realistic evaluation model (REM) to the Waterford plant. The ABB-CE representatives then discussed the technical background and status of the SBLOCA REM including a discussion of its compliance with the code scaling, applicability, and uncertainty (CSAU) evaluation methodology. The staff noted @h/A that it would be helpful for ABB-CE to include a discussion of the REM process and how it complies with CSAU in the first volume of the topical report. The       i     N staff also stated that the uncertainty analysis and two-phase flow models will be looked at closely.                                                               IT j( g '
In a {{letter dated|date=February 13, 1996|text=letter dated February 13, 1996}}, ABB-CE stated that they considered parts of the meeting presentation material to be proprietary information.
210005 NBC ?UJE BEEER COPY m M . n.e   -- #
In a {{letter dated|date=June 7, 1996|text=letter dated June 7, 1996}}, ABB-CE submitted a non-proprietary version of the presentation material.
y                                                                 mM *h C                   PDR
In a {{letter dated|date=December 12, 1996|text=letter dated December 12, 1996}}, the NRC agreed with ABB-CE's proprietary determination and agreed to withhold portions of the presentation material from public disclosure. Attachment 2 contains the non-proprietary presentation material.
The ABB-CE representatives opened the meeting with a short discussion of the background of the ABB-CE SBLOCA code submittals. The Entergy representative discussed the potential application of the revised SBLOCA evaluation model (EM) and the realistic evaluation model (REM) to the Waterford plant.
The ABB-CE representatives then discussed the technical background and status of the SBLOCA REM including a discussion of its compliance with the code scaling, applicability, and uncertainty (CSAU) evaluation methodology. The staff noted @h/A that it would be helpful for ABB-CE to include a discussion of the REM process N
and how it complies with CSAU in the first volume of the topical report. The i
I j( g '
staff also stated that the uncertainty analysis and two-phase flow models will T
be looked at closely.
210005 NBC ?UJE BEEER COPY m M. n.e #
y mM *h C
PDR


.-                                                                                    i 1
i i
-                                                                                    i D. Matthews                           -2_                     January 15, 1997 The ABB-CE representatives next discussed the proposed revision to the SBLOCA EM. They stated that the objectives of the EM revision were to support           i Entergy's plan for a power uprate at Waterford and to minimize the impact on     i the NRC's review of the SBLOCA REM. The staff stated that they would probably begin the review of the EM revision in the Spring and, therefore, have a better chance to support ABB-CE's proposed schedule for that model than a schedule for the SBLOCA REM because they could not predict when they could begin the review of the SBLOCA REM.
D. Matthews
-2_
January 15, 1997 The ABB-CE representatives next discussed the proposed revision to the SBLOCA EM. They stated that the objectives of the EM revision were to support i
Entergy's plan for a power uprate at Waterford and to minimize the impact on i
the NRC's review of the SBLOCA REM.
The staff stated that they would probably begin the review of the EM revision in the Spring and, therefore, have a better chance to support ABB-CE's proposed schedule for that model than a schedule for the SBLOCA REM because they could not predict when they could begin the review of the SBLOCA REM.
The group agreed that the next step in the process should be a letter from Entergy spelling out the need for the topical report approvals. A consensus was also reached that a kick-off meeting for the EM revision should be held after the revision is submitted and a contractor has been chosen by the staff for the review.
The group agreed that the next step in the process should be a letter from Entergy spelling out the need for the topical report approvals. A consensus was also reached that a kick-off meeting for the EM revision should be held after the revision is submitted and a contractor has been chosen by the staff for the review.
Attachments: As stated cc w/atts:   See next page
Attachments: As stated cc w/atts:
See next page


D. Matthews                                                     January 15, 1997 The ABB-CE representatives next discussed the proposed revision to the SBLOCA' EM. They stated that the objectives of the EM revision were to support Entergy's plan for a power uprate at Waterford and to minimize the impact on the NRC's review of the SBLOCA REM. The staff stated that they would probably begin the review of the EM revision in the Spring and, therefore, have a better chance to support ABB-CE's proposed schedule for that model than a schedule for the SBLOCA REM because they could not predict when they could begin the review of the SBLOCA REM.
D. Matthews January 15, 1997 The ABB-CE representatives next discussed the proposed revision to the SBLOCA' EM. They stated that the objectives of the EM revision were to support Entergy's plan for a power uprate at Waterford and to minimize the impact on the NRC's review of the SBLOCA REM. The staff stated that they would probably begin the review of the EM revision in the Spring and, therefore, have a better chance to support ABB-CE's proposed schedule for that model than a schedule for the SBLOCA REM because they could not predict when they could begin the review of the SBLOCA REM.
The group agreed that the next step in the process should be a letter from Entergy spelling out the need for the topical report approvals. A consensus was also reached that a kick-off meeting for the EM revision should be held after the revision is submitted and a contractor has been chosen by the staff for the review.
The group agreed that the next step in the process should be a letter from Entergy spelling out the need for the topical report approvals.
Attachments: As stated cc w/atts:   See next page Distribution:
A consensus was also reached that a kick-off meeting for the EM revision should be held after the revision is submitted and a contractor has been chosen by the staff for the review.
Hard Cooy Central Files PUBLIC PGEB R/F OGC ACRS EMail FMiraglia AThadani RZimmerman TMartin FAkstuleweiz SMagruder EJordan F0rr RJones JLyons EWeiss Document Name: G:\SLM1\MSUM123.96                                           '
Attachments: As stated cc w/atts:
Toreceiveacopyofthisdocument,ipicateinthebox:                   "C" - Copy     t(out attachment / enclosure   "E" - Copy witp attachment / enclosure   "N" - N c@y 0FFICE   PM:PEGB           E. SC:PGESjfy/iV   SPLBv>(/           BC:PEGSf(t)
See next page Distribution:
NAME     SMagruder:sw eirs FAkstulewciz       JLyohs>           DMatthedsst/
Hard Cooy Central Files PUBLIC PGEB R/F OGC ACRS EMail FMiraglia AThadani RZimmerman TMartin FAkstuleweiz SMagruder EJordan F0rr RJones JLyons EWeiss Document Name: G:\\SLM1\\MSUM123.96 Toreceiveacopyofthisdocument,ipicateinthebox:
DATE     1/so/97             1/f(/97 1             /
"C" - Copy t(out attachment / enclosure "E" - Copy witp attachment / enclosure "N" - N c@y 0FFICE PM:PEGB E.
1/ h/97           1/l(/97   V 0FFICIAL RECORD COPY
SC:PGESjfy/iV SPLBv>(/
BC:PEGSf(t)
NAME SMagruder:sw eirs FAkstulewciz JLyohs>
DMatthedsst/
DATE 1/so/97 1/f(/97 1 1/ h/97 1/l(/97 V
/
0FFICIAL RECORD COPY


    . . .._            -  . . - . . . . - -          .        - - . -  . - - _ - . - . . ~ . -       _ _ _ .- . .
. - - _ -. -.. ~. -
i 1
i NRC/ABB-CE MEETING ON SBLOCA REM LIST OF ATTENDEES January 23, 1996 1
NRC/ABB-CE MEETING ON SBLOCA REM
58ME ORGANIZATION J
!                                                  LIST OF ATTENDEES January 23, 1996 1
Philip Curtis ABB-CE Ernie Jageler ABB-CE Joe Cleary ABB-CE Ed Lee ABB-CE Dick Whipple ABB-CE
58ME                                   ORGANIZATION J
't F. Titus Entergy Ray Burski Entergy Bob Jones NRC/NRR Tim Collins NRC/NRR Frank Orr NRC/NRR 1
Philip Curtis                         ABB-CE Ernie Jageler                         ABB-CE Joe Cleary                             ABB-CE Ed Lee                                 ABB-CE
Stu Magruder NRC/NRR i
!          Dick Whipple                           ABB-CE
't F. Titus                               Entergy
!          Ray Burski                             Entergy Bob Jones                             NRC/NRR Tim Collins                           NRC/NRR Frank Orr                             NRC/NRR 1
Stu Magruder                           NRC/NRR i
i l
i l
l l
l 1
Attachment 1 l
1


e,e
e,e
                                                                                                                                                                                                      ?,
?,
SBLOCA REM                                                                                     NRC/ABB/EOI Meeting 1/23/96
SBLOCA REM NRC/ABB/EOI Meeting 1/23/96
                                                                                                                                                                                                      ~
~
NRC/ABB/EOI MEETING                                                                                                                       -
NRC/ABB/EOI MEETING MEETING DATE: TUESDAY, JANUARY 23,1996 MEETINGTIME: 10:00 A.M.
MEETING DATE: TUESDAY, JANUARY 23,1996                                                                                                       ,
LOCATION: NRC OFFICES, WHITE FLINT, MD h
MEETINGTIME: 10:00 A.M.
g SBLOCA REM REVIEW AND i
LOCATION: NRC OFFICES, WHITE FLINT, MD gh SBLOCA REM REVIEW AND                                                                                                                                         i PLANNING MEETING i
PLANNING MEETING i
SBLOCA REM PREPARED IN COOPERATION WITH THE                                                                                                                       ;
SBLOCA REM PREPARED IN COOPERATION WITH THE C-E OWNERS GROUP t
C-E OWNERS GROUP                                                                                               t A Et El Page1                                                     NON-PROPRIETARY VERSION                                                                 7%B5Ep                             ;
A Et El Page1 NON-PROPRIETARY VERSION 7%B5Ep
Attachment 2


SBLOCA REM                                                   NRC/ABB/EOI Meeting 1/23/96 AGENDA NRC/ABB/EOI SBLOCA REM REVIEW AND PLANNING MEETING TUESDAY, JANUARY 23,1996         10:00 A.M. NRC OFFICES, WHITE FLINT, MD
SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 AGENDA NRC/ABB/EOI SBLOCA REM REVIEW AND PLANNING MEETING TUESDAY, JANUARY 23,1996 10:00 A.M.
: 1. INTRODUCTION - P. Curtis, V.P. Engineering Operations, ABB CENO - 5 Minutes
NRC OFFICES, WHITE FLINT, MD 1.
: 2. ENTERGY's PERSPECTIVE AND ACTION PLAN - F. Titus, V.P. Engineering, Entergy Operations, Inc. - 5 Min
INTRODUCTION - P. Curtis, V.P. Engineering Operations, ABB CENO - 5 Minutes 2.
  ,3. MEETING PURPOSE - P. Curtis, V.P. Engineering Operations, ABB CENO - 5 Minutes
ENTERGY's PERSPECTIVE AND ACTION PLAN - F. Titus, V.P. Engineering, Entergy Operations, Inc. - 5 Min
. 4. IIISTORY AND STATUS OF SCLOCA REM i'
,3.
        - R. Burski, Director Nuclear Safety, Waterford 3, Member of CEOG Steering Committee - 5 Minutes
MEETING PURPOSE - P. Curtis, V.P. Engineering Operations, ABB CENO - 5 Minutes
: 5. TECIINICAL BACKGROUND AND STATUS OF TIIE SBLOCA REM - E. Jageler, ABB CENO - 20 Minutes
. 4.
: 6. RECONCILIATION / ROAD MAP OF SBLOCA REM TO CSAU - N. E. Lee, ABB CENO - 20 Minutes
IIISTORY AND STATUS OF SCLOCA REM i'
: 7. PROPOSED ACTION PLAN FOR SBLOCA REM REVIEW AND APPROVAL - E. Jageler, ABB CENO - 10 Min
- R. Burski, Director Nuclear Safety, Waterford 3, Member of CEOG Steering Committee - 5 Minutes 5.
: 8. PROPOSED ABB SULOCA EM REVISION (1996) - J. Cleary, ABB CENO - 10 Minutes 9.
TECIINICAL BACKGROUND AND STATUS OF TIIE SBLOCA REM - E. Jageler, ABB CENO - 20 Minutes 6.
RECONCILIATION / ROAD MAP OF SBLOCA REM TO CSAU - N. E. Lee, ABB CENO - 20 Minutes 7.
PROPOSED ACTION PLAN FOR SBLOCA REM REVIEW AND APPROVAL - E. Jageler, ABB CENO - 10 Min 8.
PROPOSED ABB SULOCA EM REVISION (1996) - J. Cleary, ABB CENO - 10 Minutes 9.
PROPOSED REVIEW AND APPROVAL SCIIEDULES FOR SBLOCA REM AND 1996 SBLOCA EM
PROPOSED REVIEW AND APPROVAL SCIIEDULES FOR SBLOCA REM AND 1996 SBLOCA EM
      - E. Jageler, ABB CENO - 20 Minutes
- E. Jageler, ABB CENO - 20 Minutes
: 10. MEETING  
: 10. MEETING  


Line 91: Line 109:
  - P. Curtis, V.P. Engineering Operations, ABB CENO - 5 Minutes A It 59 Page 2 7%B555
  - P. Curtis, V.P. Engineering Operations, ABB CENO - 5 Minutes A It 59 Page 2 7%B555


SBLOCA REM                 NRC/ABB/EOl Meeting 1/23/96 ENTERGY'S PERSPECTIVE                               ,
SBLOCA REM NRC/ABB/EOl Meeting 1/23/96 ENTERGY'S PERSPECTIVE
  + Improve cost e:?fectiveness                                   .
+ Improve cost e:?fectiveness l + Eva.uating 2z-Mon ~::a Cycle anc. Power Uprate
l + Eva.uating 2z- Mon ~::a Cycle anc. Power Uprate               '
+ Need success pat:a for SBLOCA
  + Need success pat:a for SBLOCA
+ Alternative review approaches suggested in t:
  + Alternative review approaches suggested in t: 1e XRC etter da':ec 12/13/95                                     -
1e XRC etter da':ec 12/13/95 t
t e
e Page 3 kNTERGY
Page 3 kNTERGY


SBLOCA REM                                                   NRC/ABB/EdI Meeting 1/23/96 ACTION PLAN FOR WATERFORD 3 UPRATE A
SBLOCA REM NRC/ABB/EdI Meeting 1/23/96 ACTION PLAN FOR WATERFORD 3 UPRATE A n K Eva_uation Moc el revision (PARCH REM)
n K Eva_uation Moc el revision (PARCH REM)
Wi 1 fi~ e EM revision request unc.er 10CFR50.L6(a)(:.)(ii) l Short term, EM revision anrova. rec uirec. ay Decem aer,1996 Long term, SBLOCA REM wi: provic.e ac citiona.
Wi 1 fi~ e EM revision request unc.er 10CFR50.L6(a)(:.)(ii) l     Short term, EM revision anrova. rec uirec. ay Decem aer,1996 Long term, SBLOCA REM wi: provic.e ac citiona.
margin Page 4 I
margin Page 4 ENTERGY
ENTERGY


SELOCA REM                                                 NRC/ABB/EOI Meeting 1/23/96 l
l SELOCA REM NRC/ABB/EOI Meeting 1/23/96 l
l INTRODUCTION M.EETING PURPOSE
INTRODUCTION M.EETING PURPOSE
                                    + ESTABLISH A PLAN FOR REVIEW AND APPROVAL OF e                                 SBLOCA REM Acceptable to NRC Optimizes the Use of NRC Resources Supports the Needs of Utilitics Depending on SBLOCA REM for Improved Operation
+ ESTABLISH A PLAN FOR REVIEW AND APPROVAL OF e
                                    + ESTABLISH A PLAN FOR REVIEW AND APPROVAL OF AN EM SUPPLEMENT Supports [                       j for Waterford 3 Prior to Commitment of Major Capital Fun'ds Utilizes the Early Portions of the SBLOCA REM Review to Reduce the Impact of this EM Supplement Page 3 A ED El 7%E9Ep
SBLOCA REM Acceptable to NRC Optimizes the Use of NRC Resources Supports the Needs of Utilitics Depending on SBLOCA REM for Improved Operation
+ ESTABLISH A PLAN FOR REVIEW AND APPROVAL OF AN EM SUPPLEMENT Supports [
j for Waterford 3 Prior to Commitment of Major Capital Fun'ds Utilizes the Early Portions of the SBLOCA REM Review to Reduce the Impact of this EM Supplement A ED El Page 3 7%E9Ep


I SBLOCA REM                           NRC/ABB/EdI Meeting 1/23/96 SBLOCA REM Background
I SBLOCA REM NRC/ABB/EdI Meeting 1/23/96 SBLOCA REM Background
      + CEOG REM initia. Topica. suamittec in 1988 g
+ CEOG REM initia. Topica. suamittec in 1988 g
      + Previous NRC review and changes
+ Previous NRC review and changes
            - INEL pre..iminary review anc. questions answerec. in 1990
- INEL pre..iminary review anc. questions i
            - 1991 NRC questions resu..tec. in upgradec.
answerec. in 1990
Topica. Report submittec. in : 993               '
- 1991 NRC questions resu..tec. in upgradec.
      + CEOG dialog wita XRC managemeig Page 6 ENTERGY
Topica. Report submittec. in : 993
+ CEOG dialog wita XRC managemeig Page 6 ENTERGY


l!
l!
SBLOCA REM                         NRC/ABB/EO Meeting 1/23/96 Technical Background and Status of the SBLOCA REM
SBLOCA REM NRC/ABB/EO Meeting 1/23/96 l
1 Technical Background and Status of the SBLOCA REM
,i k
,i k
E. F. Jageler Sr. Consultant - Systems and Transients                                                     !
E. F. Jageler Sr. Consultant - Systems and Transients Program Manager for REM Methodologies ABB Combustion Engineering Nuclear Operations A BR Et Page 6 pggggy
Program Manager for REM Methodologies ABB Combustion Engineering Nuclear Operations A BR Et Page 6                                             pggggy


                                                                    . . l SBLOCA REM                     NRC/ABB/EO Meeting 1/23/96     '!
.. l; SBLOCA REM NRC/ABB/EO Meeting 1/23/96 i
Objectives Review t1e status of the SBLOCA REM                 .
Objectives Review t1e status of the SBLOCA REM Plan and kickoff the approval process s
Plan and kickoff the approval process t
Determine how we can work together to t
Determine how we can work together to bring closure to t:1e SBLOCA REM review within a schedtte consistent with Our clients needs Establish action items Page 7 A Et Et E%EEEE
bring closure to t:1e SBLOCA REM
)
review within a schedtte consistent with Our clients needs Establish action items 1
A Et Et Page 7 E%EEEE


h-SBLOCA REM                                                               NRC/ABB/EOI Meeting 1/23/96                                                                                                           '
h-i SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Elements of SBLOCA REM i
Elements of SBLOCA REM                                                                                                                                                                   .            i i
l i
j CEFLASH-4AS/ REM PARCH / REM                                                       .
CEFLASH-4AS/ REM j
Uncertainty Evaluation Methods Ap%ications to C-E XSSSs Page 8 A ED Et 7%B555                           :
PARCH / REM Uncertainty Evaluation Methods Ap%ications to C-E XSSSs A ED Et Page 8 7%B555


SBLOCA REM                           NRC/ABB/EO Meeting 1/23/96 Responses to NRC Questions                                                         ;
SBLOCA REM NRC/ABB/EO Meeting 1/23/96 Responses to NRC Questions New documentation addressed official questions Included additionalIETs and SETS 3
New documentation addressed official questions 3
Greater detail in model and correlation definitions Clarifications in virtually every section Addressed difficult issues on the uncertainty evaluation by adding [
Included additionalIETs and SETS Greater detail in model and correlation definitions Clarifications in virtually every section Addressed difficult issues on the uncertainty evaluation by adding [                                             ]
]
Work performed by team of engineers not originally involved in development as independent che'ck A BR BD i
Work performed by team of engineers not originally involved in development as independent che'ck A BR BD l
i


SBLOCA REM                                                                                                         NRC/ABB/EOI Meeting 1/23/96 1991 Official Question Categories Type 1 - Clarifications and explanations (26)
SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 1991 Official Question Categories Type 1 - Clarifications and explanations (26)
Type II - Justificationa, assessments, and basis (12)
Type II - Justificationa, assessments, and basis (12)
Type III - Comparisons to data (10)
Type III - Comparisons to data (10)
Type IV - Uncertainty Evaluation (11)
Type IV - Uncertainty Evaluation (11) i Type V - Question #63 i
Type V - Question #63 Page 10                                                                                                                                               8%EEEE         '
I L
Page 10 8%EEEE


c,;
c,;
SBLOCA REM                                                                           NRC/ABB/EOI Meeting 1/23/96 Results of SBLOCA REM Documentation Eaca important moc.e. anc. corre..ation was redocumentec. as fo .ows:                                                                                                     -
SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Results of SBLOCA REM Documentation Eaca important moc.e. anc. corre..ation was redocumentec. as fo.ows:
Description Assessment (Data Base, Accuracy, and Scaling)
Description Assessment (Data Base, Accuracy, and Scaling)
Application to SBLOCA analysis                                                                                                         .
Application to SBLOCA analysis Coding Documentation mac.e consistent wita CSAU Somejustifications incluc.ec. ac.c.itiona. sensitivity stuc.ies [
Coding Documentation mac.e consistent wita CSAU                                                                                                       :
t A Et 59 Page11 ESEEEE
Somejustifications incluc.ec. ac.c.itiona. sensitivity stuc.ies [                                                                                         ,
: t. i SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 l
t Page11 A Et 59 ESEEEE
Results of SBLOCA REM Documentation (continuec.,2 of 3)
: t. i SBLOCA REM                           NRC/ABB/EOI Meeting 1/23/96 Results of SBLOCA REM Documentation (continuec.,2 of 3)
Increasec.num3er anc coverage ofIETs Strengthened code assessment i
Increasec.num3er anc coverage ofIETs
j Code comparison to data continued to [
          .            Strengthened code assessment                                       i j               Code comparison to data continued to [
]
                                              ]
Continued overall excellent agreement on transient pressure and inventory distribution l
Continued overall excellent agreement on transient pressure and inventory distribution Increasec. num aer anc. coverage of SETS                                 '
Increasec. num aer anc. coverage of SETS Strengthened justification of applicability range l
Strengthened justification of applicability range Page 12                                                       7%B555         i
Page 12 7%B555 i


                                                                                                                                      +.
+.
SBLOCA REM NRC/ABB/EO Meeting 1/23/96 Results of SBLOCA REM Documentation (continued,3 0:?3)
SBLOCA REM NRC/ABB/EO Meeting 1/23/96 Results of SBLOCA REM Documentation (continued,3 0:?3)
                                                                                                                            ~
~
Performec. [                                                                   ]
Performec. [
L             1                                                                                                             ;
]
Define level of confidence Better ensure "no compensating errors" Furtherjustification for [       ] scaling and geometric uncertainties             .
L 1
Provide a comparison and evaluation of how the                                                                               '
Define level of confidence Better ensure "no compensating errors" Furtherjustification for [
SBLOCA REM addresses each element in CSAU                                                                                   '
] scaling and geometric uncertainties Provide a comparison and evaluation of how the SBLOCA REM addresses each element in CSAU A Et 59 Page 13 7%EEEE
A Et 59 Page 13                                                   7%EEEE


SBLOCA REM                            NRC/ABB/EOI Meeting 1/23/96 Reconciliation / Road Map of SBLOCA REM to the Code Scaling, Applicability, and Uncertainty (CSAU) s' Evaluation January 23,1996 Naugab E. Lee                                                                                     '
NRC/ABB/EOI Meeting 1/23/96 SBLOCA REM Reconciliation / Road Map of SBLOCA REM to the Code Scaling, Applicability, and Uncertainty (CSAU)
Sr. Consultant - Systems and Transients ABB Combustion Engineering Nuclear Ope' rations A It Et Page 14                                                   7%B555
Evaluation s'
January 23,1996 Naugab E. Lee Sr. Consultant - Systems and Transients ABB Combustion Engineering Nuclear Ope' rations A It Et Page 14 7%B555


          .      .      . - _    -  - - -=   .    -      - - -      -    - -.      . - .  --
-=
SBLOCA REM
NRC/ABB/EOI Meeting 1/23/96
                                                                                                      ~
~
NRC/ABB/EOI Meeting 1/23/96 Objectives Comparison Between CSAU and ABB SBLOCA REM Approach
SBLOCA REM Objectives Comparison Between CSAU and ABB SBLOCA REM Approach
: 1. Documentation
: 1. Documentation
    .-                      2. Evaluation Methodology v
: 2. Evaluation Methodology v
CSAU
CSAU
: 1. NUREG-1230: Compendium of ECCS Research
: 1. NUREG-1230: Compendium of ECCS Research
: 2. NUREG/CR-5249: LBLOCA CSAU Report
: 2. NUREG/CR-5249: LBLOCA CSAU Report
: 3. NUREG/CR-5818: SBLOCA CSAU Report ABB CE SBLOCA REM Topicals CEN 420-P: 1,11, lil and Two Supplements JL ED ED               -
: 3. NUREG/CR-5818: SBLOCA CSAU Report ABB CE SBLOCA REM Topicals CEN 420-P: 1,11, lil and Two Supplements JL ED ED Page 15 7%B555
Page 15                                                               7%B555


                                                                                                                        'g.
'g..
SBLOCA REM                                                   NRC/ABB/EOI Meeting 1/23/96 Documentation Mapping CSAU Required Documents                           SBLOCA REM CEN 420-P Annotated Codes               <-> CEFLASH-4AS/ REM
SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Documentation Mapping CSAU Required Documents SBLOCA REM CEN 420-P Annotated Codes
    ..                                                                  PARCH / REM                                         ,
<-> CEFLASH-4AS/ REM PARCH / REM
  ,i                               Theory Manual                 <-> Volume i Users' Manual                 <-> Volume ill Programmers' Manual           <-> Volume 1 Code Assessment               <-> Volume 11 (Sect. 2 & 3)
,i Theory Manual
<-> Volume i Users' Manual
<-> Volume ill Programmers' Manual
<-> Volume 1 Code Assessment
<-> Volume 11 (Sect. 2 & 3)
Volume I (SET)
Volume I (SET)
Plant Analysis and             <-> Volume 11 (Sect. 3, 4, 5)
Plant Analysis and
Uncertainty Evaluation               Volume ll, Supplement 1                             !
<-> Volume 11 (Sect. 3, 4, 5)
Volume 11, Supplement 2                             ,
Uncertainty Evaluation Volume ll, Supplement 1 Volume 11, Supplement 2 AElEt Page 16 7%E555
Page 16 AElEt 7%E555


                                                                                  . at
at
                                                                                      't. ,
't.
SBLOCA REM                                 NRC/ABB/EOI Meeting 1/23/96 Summary on Documentation
SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Summary on Documentation 1.
: 1. Submitted topicals (CEN 420-P) have all required elements.
Submitted topicals (CEN 420-P) have all required elements.
: 2. Volume I has been substantially upgraded to address NRC question #63.
2.
: 3. Code assessments (IETs and SETS) are described in Volumes I and II.      .
Volume I has been substantially upgraded to address NRC question #63.
i Page 17 E%EEEE
3.
: 1.
Code assessments (IETs and SETS) are described in Volumes I and II.
SBLOCA REM                                                                                   NRC/ABB/EO Meeting 1/23/96 Evaluation Methodology Mapping
i y
                                                                                                                                                      )
Page 17 E%EEEE
: 1..
SBLOCA REM NRC/ABB/EO Meeting 1/23/96 Evaluation Methodology Mapping
)
e L
e L
4 4
4 4
l e
l e
t Page 18                                                                                                       pggg
t Page 18 pggg


f:
f:
LOCA REM               NRC/ABB/EO Meeting 1/23/96 SAMPLE RESULT FOR 2700 MWt PWR eliuumi 1
LOCA REM NRC/ABB/EO Meeting 1/23/96 SAMPLE RESULT FOR 2700 MWt PWR l
e
eliuumi 1
* I t
e I
Page 19 A EtIt 7%B559
l t
A EtIt Page 19 7%B559


t-SBLOCA REM                                         NRC/ABB/EOI Meeting 1/23/96 Summary on Evaluation Methodology                                                   .
t-SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 t
A i3 f
Summary on Evaluation Methodology A
A It Et Page 20                                                                         7%E559
1 3i f
A It Et Page 20 7%E559 l
t


t SBLOCA REM                           NRC/ABB/EOI Meeting 1/23/96 Conclusions                                                           .
..t SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Conclusions I
I
1.
: 1. CEN 420-P meets CSAU requirements 4
CEN 420-P meets CSAU requirements 4
emumm i
emumm i
t A ED Et Page 21 7%NDED                                 i
t A ED Et Page 21 7%NDED i


I               -
I
                                                                                                                                                            ' y. l
' y. l
                                                                                                                                                                ~l SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Proposed Action Plan for SBLOCA REM Review and Approval Key Elements                                                                                                                                   -
~l:
NRC and contractor begin review on existing documentation                                                                                                                                       l
SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Proposed Action Plan for SBLOCA REM Review and Approval Key Elements NRC and contractor begin review on existing documentation l
  ,i    -
Intensive detailed technical meeting
Intensive detailed technical meeting Integrate lessons learned - define new documentation needs General Concepts Presentation to ACRS                                                                                                               j Question / Comment resolution with NRC ACRS revicw                                     .
,i Integrate lessons learned - define new documentation needs General Concepts Presentation to ACRS j
Question / Comment resolution with ACRS SER                                                                                                                                                   I Page 22 A ED ED 7%B555                                                 i
Question / Comment resolution with NRC ACRS revicw Question / Comment resolution with ACRS SER I
i A ED ED Page 22 7%B555 i


U.
U.
SBLOCA REM                                 NRC/ABB/EOI Meeting 1/23/96 Proposed Action Plan for SBLOCA REM Review and Approval                                                                       -
SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Proposed Action Plan for SBLOCA REM Review and Approval Next Steps NRC, Contractor, and ABB hold detailed technical i
Next Steps NRC, Contractor, and ABB hold detailed technical review meeting Initiate review of the SBLOCA REM on the PARCH / REM [
review meeting Initiate review of the SBLOCA REM on the PARCH / REM [
1 Page 23 JL ElEt E%EEEE         .
1 l
i JL ElEt I
Page 23 E%EEEE


SBLOCA REM                                               NRC/ABB/EOI Meeting 1/23/96 j
SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 j
ABB SBLOCA EVALUATION MODEL REVISION                                                                               .
ABB SBLOCA EVALUATION MODEL REVISION J.M. Cleary Supervisor - LOCA Analysis Group l
J.M. Cleary Supervisor - LOCA Analysis Group ABB Combustion Engineering Nuclear Operations l
ABB Combustion Engineering Nuclear Operations l
Page 24 7%EREN
Page 24 7%EREN


                                                                            ~.
~.
SBLOCA REM                           NRC/ABB/EO Meeting 1/23/96 ABB SBLOCA EVALUATION MODEL REVISION Objectives of the SBLOCA EM Revision f
SBLOCA REM NRC/ABB/EO Meeting 1/23/96 ABB SBLOCA EVALUATION MODEL REVISION Objectives of the SBLOCA EM Revision f
Support EOI's plan for Waterford 3 power uprate l
l Support EOI's plan for Waterford 3 power uprate
                    -[                 ]
-[
Spring 1997 license submittal Minimize impact on NRC review of SBLOCA REM A BR 59 Page 25                                               pggggg
]
Spring 1997 license submittal Minimize impact on NRC review of SBLOCA REM A BR 59 Page 25 pggggg


                                                                    'I SBLOCA REM                   NRC/ABB/EOI Meeting 1/23/96 ABB SBLOCA EVALUATION MODEL REVISION                   .
'I SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 l
Description of the SBLOCA EM Revision i
1 k
Jk ED ER             :
ABB SBLOCA EVALUATION MODEL REVISION Description of the SBLOCA EM Revision i
Page 26                                         7%EDE5
1 l
Jk ED ER Page 26 7%EDE5 f


c   - .
c SBLOCA REM NRC/ABB/EO Meeting 1/23/96 ABB SBLOCA EVALUATION MODEL REVISION 1
SBLOCA REM                     NRC/ABB/EO Meeting 1/23/96 ABB SBLOCA EVALUATION MODEL REVISION 1
Features of the SBLOCA EM Revision
Features of the SBLOCA EM Revision t
?
                                                                                          )
I t
)
t i
t i
l m
l m
4 i
4 i
Page 27
Page 27
                                                            #%EDED
#%EDED


SBLOCA REM                              NRC/ABB/EOI Meeting 1/23/96 ABB SBLOCA EVALUATION MODEL REVISION Summary           .
NRC/ABB/EOI Meeting 1/23/96 SBLOCA REM ABB SBLOCA EVALUATION MODEL REVISION Summary The SBLOCA EM revision will [
The SBLOCA EM revision will [                                 ]
]
      <              for Waterford 3. Preliminary calculations indicate a Peak i'
for Waterford 3. Preliminary calculations indicate a Peak Cladding Temperature of approximately 2050oF versus the i'
Cladding Temperature of approximately 2050oF versus the acceptance criterion of 2200oF.
acceptance criterion of 2200oF.
The revision minimizes impact on the NRC review of the SBLOCA REM
The revision minimizes impact on the NRC review of the SBLOCA REM
                            -[                                                     ]
-[
]
Documentation will rely heavily on information already reviewed by the NRC A Et 59 Page 28 7%E559
Documentation will rely heavily on information already reviewed by the NRC A Et 59 Page 28 7%E559


r SBLOCA REM                                                                                                 NRC/ABB/EOI Meeting 1/23/96 Review and Approval Schedule for SBLOCA REM TASK                                                                                                                                                         DATE                             .
r SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Review and Approval Schedule for SBLOCA REM TASK DATE NRC initiate review, technical meeting with ABB NRC provide comments on PARCH / REM review l
NRC initiate review, technical meeting with ABB                                                                                                                                     '
NRC and ABB establish additional documentation General concepts presentation to ACRS ABB submit additional documentation
NRC provide comments on PARCH / REM review l                   NRC and ABB establish additional documentation General concepts presentation to ACRS ABB submit additional documentation
~
                                                                                                                                        ~
NRC issue review questions on SBLOCA REM ABB question / comment resolution with NRC ACRS review I
NRC issue review questions on SBLOCA REM ABB question / comment resolution with NRC ACRS review                                                                                                                                                                                   I ABB question / comment resolution with ACRS/NRC NRC issue SER i
ABB question / comment resolution with ACRS/NRC NRC issue SER i
Page 30 JL ER Et                             i E%EEEE
JL ER Et i
Page 30 E%EEEE


SBLOCA REM                     NRC/ABB/EOI Meeting 1/23/96 Review and Approval Schedule for 1996 SBLOCA EM TASK                                                 DATE NRC initiate review, technical meeting with ABB               .
SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Review and Approval Schedule for 1996 SBLOCA EM TASK DATE NRC initiate review, technical meeting with ABB NRC provide comments [
  .- NRC provide comments [
]
                                                        ]
ABB submit documentation for revised EM NRC issue review questions on EM submittal ABB respond to review questions NRC issue SER for revised EM A ED ED Page 31 E%EEEE
ABB submit documentation for revised EM NRC issue review questions on EM submittal ABB respond to review questions             -
NRC issue SER for revised EM A ED ED Page 31 E%EEEE


5.
5.
SBLOCA REM                   NRC/ABB/EOI Meeting 1/23/96
SBLOCA REM NRC/ABB/EOI Meeting 1/23/96
)


==SUMMARY==
==SUMMARY==
1 Firm scaeduLe for XRC and ABB on SBLOCA REM review XRC-approved EM revision plan required before committing furtaer resources to (prate ABB action items EOI action items A ED ED Page 32 E%EEEE


Firm scaeduLe for XRC and ABB on SBLOCA REM review XRC-approved EM revision plan required before committing furtaer resources to (prate ABB action items            .
h
EOI action items A ED ED Page 32 E%EEEE
$l' ABB-Combustion Engineering, Inc.
 
cc:
h   .
Mr. Charles B. Brinkman, Director Nuclear Systems Licensing ABB-Combustion Engineering, Inc.
$l''
Post Office Box 500 1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. Ian C. Rickard, Director t
ABB-Combustion Engineering, Inc.
Operations Licensing ABB-Combustion Engineering Nuclear Operations Post Office Box 500 1000 Prospect Hill Road
cc: Mr. Charles B. Brinkman, Director Nuclear Systems Licensing ABB-Combustion Engineering, Inc.
}
Post Office Box 500 1000 Prospect Hill Road Windsor, Connecticut 06095-0500 t            Mr. Ian C. Rickard, Director Operations Licensing ABB-Combustion Engineering Nuclear Operations Post Office Box 500 1000 Prospect Hill Road
Windsor, Connecticut 06095-0500 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.
}             Windsor, Connecticut 06095-0500 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 L
12300 Twinbrook Parkway, Suite 330
_ _.,,,}}
..          Rockville, Maryland 20852 L
_ _ . , , ,}}

Latest revision as of 08:47, 12 December 2024

Summary of 960123 Meeting W/Listed Attendees in Rockville,Md to Discuss Process for Reivew of Proposed Rev to ABB-CE SBLOCA Emergency Core Cooling Sys Safety Analysis Methods
ML20133K844
Person / Time
Issue date: 01/15/1997
From: Stewart Magruder
NRC (Affiliation Not Assigned)
To: Matthews D
NRC (Affiliation Not Assigned)
References
NUDOCS 9701210368
Download: ML20133K844 (37)


Text

.

[g>.R MCy k UNITED STATES NUCLEAR REGULATORY COMMISSION o

WASHINGTON, D.C. 20555-0001

.....,o January 15, 1997 MEMORANDUM T0:

David B. Matthews, Chief Generic Issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:

Stewart L. Magruder, Project Manager Generic Issues and Environmental MN Projects Branch Division of Reactor Program Management

)

Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF JANUARY 23, 1996, MEETING WITH ABB COMBUSTION ENGINEERING REGARDING REVISION TO SMALL BREAK LOSS-0F-COOLANT ACCIDENT EVALUATION MODEL On January 23, 1996, representatives of ABB Combustion Engineering (ABB-CE) and Entergy Operations, Incorporated met with representatives of the Nuclear Regulatory Commission (NRC) at the NRC's offices in Rockville, Maryland.

' provides a list of meeting attendees.

The purpose of the meeting was to discuss the process for review of a proposed revision to the ABB-CE Small Break Loss of Coolant Accident (SBLOCA) Emergency Core Cooling System safety analysis methods.

In a letter dated February 13, 1996, ABB-CE stated that they considered parts of the meeting presentation material to be proprietary information.

In a letter dated June 7, 1996, ABB-CE submitted a non-proprietary version of the presentation material.

In a letter dated December 12, 1996, the NRC agreed with ABB-CE's proprietary determination and agreed to withhold portions of the presentation material from public disclosure. Attachment 2 contains the non-proprietary presentation material.

The ABB-CE representatives opened the meeting with a short discussion of the background of the ABB-CE SBLOCA code submittals. The Entergy representative discussed the potential application of the revised SBLOCA evaluation model (EM) and the realistic evaluation model (REM) to the Waterford plant.

The ABB-CE representatives then discussed the technical background and status of the SBLOCA REM including a discussion of its compliance with the code scaling, applicability, and uncertainty (CSAU) evaluation methodology. The staff noted @h/A that it would be helpful for ABB-CE to include a discussion of the REM process N

and how it complies with CSAU in the first volume of the topical report. The i

I j( g '

staff also stated that the uncertainty analysis and two-phase flow models will T

be looked at closely.

210005 NBC ?UJE BEEER COPY m M. n.e #

y mM *h C

PDR

i i

D. Matthews

-2_

January 15, 1997 The ABB-CE representatives next discussed the proposed revision to the SBLOCA EM. They stated that the objectives of the EM revision were to support i

Entergy's plan for a power uprate at Waterford and to minimize the impact on i

the NRC's review of the SBLOCA REM.

The staff stated that they would probably begin the review of the EM revision in the Spring and, therefore, have a better chance to support ABB-CE's proposed schedule for that model than a schedule for the SBLOCA REM because they could not predict when they could begin the review of the SBLOCA REM.

The group agreed that the next step in the process should be a letter from Entergy spelling out the need for the topical report approvals. A consensus was also reached that a kick-off meeting for the EM revision should be held after the revision is submitted and a contractor has been chosen by the staff for the review.

Attachments: As stated cc w/atts:

See next page

D. Matthews January 15, 1997 The ABB-CE representatives next discussed the proposed revision to the SBLOCA' EM. They stated that the objectives of the EM revision were to support Entergy's plan for a power uprate at Waterford and to minimize the impact on the NRC's review of the SBLOCA REM. The staff stated that they would probably begin the review of the EM revision in the Spring and, therefore, have a better chance to support ABB-CE's proposed schedule for that model than a schedule for the SBLOCA REM because they could not predict when they could begin the review of the SBLOCA REM.

The group agreed that the next step in the process should be a letter from Entergy spelling out the need for the topical report approvals.

A consensus was also reached that a kick-off meeting for the EM revision should be held after the revision is submitted and a contractor has been chosen by the staff for the review.

Attachments: As stated cc w/atts:

See next page Distribution:

Hard Cooy Central Files PUBLIC PGEB R/F OGC ACRS EMail FMiraglia AThadani RZimmerman TMartin FAkstuleweiz SMagruder EJordan F0rr RJones JLyons EWeiss Document Name: G:\\SLM1\\MSUM123.96 Toreceiveacopyofthisdocument,ipicateinthebox:

"C" - Copy t(out attachment / enclosure "E" - Copy witp attachment / enclosure "N" - N c@y 0FFICE PM:PEGB E.

SC:PGESjfy/iV SPLBv>(/

BC:PEGSf(t)

NAME SMagruder:sw eirs FAkstulewciz JLyohs>

DMatthedsst/

DATE 1/so/97 1/f(/97 1 1/ h/97 1/l(/97 V

/

0FFICIAL RECORD COPY

. - - _ -. -.. ~. -

i NRC/ABB-CE MEETING ON SBLOCA REM LIST OF ATTENDEES January 23, 1996 1

58ME ORGANIZATION J

Philip Curtis ABB-CE Ernie Jageler ABB-CE Joe Cleary ABB-CE Ed Lee ABB-CE Dick Whipple ABB-CE

't F. Titus Entergy Ray Burski Entergy Bob Jones NRC/NRR Tim Collins NRC/NRR Frank Orr NRC/NRR 1

Stu Magruder NRC/NRR i

i l

l 1

e,e

?,

SBLOCA REM NRC/ABB/EOI Meeting 1/23/96

~

NRC/ABB/EOI MEETING MEETING DATE: TUESDAY, JANUARY 23,1996 MEETINGTIME: 10:00 A.M.

LOCATION: NRC OFFICES, WHITE FLINT, MD h

g SBLOCA REM REVIEW AND i

PLANNING MEETING i

SBLOCA REM PREPARED IN COOPERATION WITH THE C-E OWNERS GROUP t

A Et El Page1 NON-PROPRIETARY VERSION 7%B5Ep

SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 AGENDA NRC/ABB/EOI SBLOCA REM REVIEW AND PLANNING MEETING TUESDAY, JANUARY 23,1996 10:00 A.M.

NRC OFFICES, WHITE FLINT, MD 1.

INTRODUCTION - P. Curtis, V.P. Engineering Operations, ABB CENO - 5 Minutes 2.

ENTERGY's PERSPECTIVE AND ACTION PLAN - F. Titus, V.P. Engineering, Entergy Operations, Inc. - 5 Min

,3.

MEETING PURPOSE - P. Curtis, V.P. Engineering Operations, ABB CENO - 5 Minutes

. 4.

IIISTORY AND STATUS OF SCLOCA REM i'

- R. Burski, Director Nuclear Safety, Waterford 3, Member of CEOG Steering Committee - 5 Minutes 5.

TECIINICAL BACKGROUND AND STATUS OF TIIE SBLOCA REM - E. Jageler, ABB CENO - 20 Minutes 6.

RECONCILIATION / ROAD MAP OF SBLOCA REM TO CSAU - N. E. Lee, ABB CENO - 20 Minutes 7.

PROPOSED ACTION PLAN FOR SBLOCA REM REVIEW AND APPROVAL - E. Jageler, ABB CENO - 10 Min 8.

PROPOSED ABB SULOCA EM REVISION (1996) - J. Cleary, ABB CENO - 10 Minutes 9.

PROPOSED REVIEW AND APPROVAL SCIIEDULES FOR SBLOCA REM AND 1996 SBLOCA EM

- E. Jageler, ABB CENO - 20 Minutes

10. MEETING

SUMMARY

- P. Curtis, V.P. Engineering Operations, ABB CENO - 5 Minutes A It 59 Page 2 7%B555

SBLOCA REM NRC/ABB/EOl Meeting 1/23/96 ENTERGY'S PERSPECTIVE

+ Improve cost e:?fectiveness l + Eva.uating 2z-Mon ~::a Cycle anc. Power Uprate

+ Need success pat:a for SBLOCA

+ Alternative review approaches suggested in t:

1e XRC etter da':ec 12/13/95 t

e Page 3 kNTERGY

SBLOCA REM NRC/ABB/EdI Meeting 1/23/96 ACTION PLAN FOR WATERFORD 3 UPRATE A n K Eva_uation Moc el revision (PARCH REM)

Wi 1 fi~ e EM revision request unc.er 10CFR50.L6(a)(:.)(ii) l Short term, EM revision anrova. rec uirec. ay Decem aer,1996 Long term, SBLOCA REM wi: provic.e ac citiona.

margin Page 4 I

ENTERGY

l SELOCA REM NRC/ABB/EOI Meeting 1/23/96 l

INTRODUCTION M.EETING PURPOSE

+ ESTABLISH A PLAN FOR REVIEW AND APPROVAL OF e

SBLOCA REM Acceptable to NRC Optimizes the Use of NRC Resources Supports the Needs of Utilitics Depending on SBLOCA REM for Improved Operation

+ ESTABLISH A PLAN FOR REVIEW AND APPROVAL OF AN EM SUPPLEMENT Supports [

j for Waterford 3 Prior to Commitment of Major Capital Fun'ds Utilizes the Early Portions of the SBLOCA REM Review to Reduce the Impact of this EM Supplement A ED El Page 3 7%E9Ep

I SBLOCA REM NRC/ABB/EdI Meeting 1/23/96 SBLOCA REM Background

+ CEOG REM initia. Topica. suamittec in 1988 g

+ Previous NRC review and changes

- INEL pre..iminary review anc. questions i

answerec. in 1990

- 1991 NRC questions resu..tec. in upgradec.

Topica. Report submittec. in : 993

+ CEOG dialog wita XRC managemeig Page 6 ENTERGY

l!

SBLOCA REM NRC/ABB/EO Meeting 1/23/96 l

1 Technical Background and Status of the SBLOCA REM

,i k

E. F. Jageler Sr. Consultant - Systems and Transients Program Manager for REM Methodologies ABB Combustion Engineering Nuclear Operations A BR Et Page 6 pggggy

.. l; SBLOCA REM NRC/ABB/EO Meeting 1/23/96 i

Objectives Review t1e status of the SBLOCA REM Plan and kickoff the approval process s

Determine how we can work together to t

bring closure to t:1e SBLOCA REM

)

review within a schedtte consistent with Our clients needs Establish action items 1

A Et Et Page 7 E%EEEE

h-i SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Elements of SBLOCA REM i

l i

CEFLASH-4AS/ REM j

PARCH / REM Uncertainty Evaluation Methods Ap%ications to C-E XSSSs A ED Et Page 8 7%B555

SBLOCA REM NRC/ABB/EO Meeting 1/23/96 Responses to NRC Questions New documentation addressed official questions Included additionalIETs and SETS 3

Greater detail in model and correlation definitions Clarifications in virtually every section Addressed difficult issues on the uncertainty evaluation by adding [

]

Work performed by team of engineers not originally involved in development as independent che'ck A BR BD l

i

SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 1991 Official Question Categories Type 1 - Clarifications and explanations (26)

Type II - Justificationa, assessments, and basis (12)

Type III - Comparisons to data (10)

Type IV - Uncertainty Evaluation (11) i Type V - Question #63 i

I L

Page 10 8%EEEE

c,;

SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Results of SBLOCA REM Documentation Eaca important moc.e. anc. corre..ation was redocumentec. as fo.ows:

Description Assessment (Data Base, Accuracy, and Scaling)

Application to SBLOCA analysis Coding Documentation mac.e consistent wita CSAU Somejustifications incluc.ec. ac.c.itiona. sensitivity stuc.ies [

t A Et 59 Page11 ESEEEE

t. i SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 l

Results of SBLOCA REM Documentation (continuec.,2 of 3)

Increasec.num3er anc coverage ofIETs Strengthened code assessment i

j Code comparison to data continued to [

]

Continued overall excellent agreement on transient pressure and inventory distribution l

Increasec. num aer anc. coverage of SETS Strengthened justification of applicability range l

Page 12 7%B555 i

+.

SBLOCA REM NRC/ABB/EO Meeting 1/23/96 Results of SBLOCA REM Documentation (continued,3 0:?3)

~

Performec. [

]

L 1

Define level of confidence Better ensure "no compensating errors" Furtherjustification for [

] scaling and geometric uncertainties Provide a comparison and evaluation of how the SBLOCA REM addresses each element in CSAU A Et 59 Page 13 7%EEEE

NRC/ABB/EOI Meeting 1/23/96 SBLOCA REM Reconciliation / Road Map of SBLOCA REM to the Code Scaling, Applicability, and Uncertainty (CSAU)

Evaluation s'

January 23,1996 Naugab E. Lee Sr. Consultant - Systems and Transients ABB Combustion Engineering Nuclear Ope' rations A It Et Page 14 7%B555

-=

NRC/ABB/EOI Meeting 1/23/96

~

SBLOCA REM Objectives Comparison Between CSAU and ABB SBLOCA REM Approach

1. Documentation
2. Evaluation Methodology v

CSAU

1. NUREG-1230: Compendium of ECCS Research
2. NUREG/CR-5249: LBLOCA CSAU Report
3. NUREG/CR-5818: SBLOCA CSAU Report ABB CE SBLOCA REM Topicals CEN 420-P: 1,11, lil and Two Supplements JL ED ED Page 15 7%B555

'g..

SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Documentation Mapping CSAU Required Documents SBLOCA REM CEN 420-P Annotated Codes

<-> CEFLASH-4AS/ REM PARCH / REM

,i Theory Manual

<-> Volume i Users' Manual

<-> Volume ill Programmers' Manual

<-> Volume 1 Code Assessment

<-> Volume 11 (Sect. 2 & 3)

Volume I (SET)

Plant Analysis and

<-> Volume 11 (Sect. 3, 4, 5)

Uncertainty Evaluation Volume ll, Supplement 1 Volume 11, Supplement 2 AElEt Page 16 7%E555

at

't.

SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Summary on Documentation 1.

Submitted topicals (CEN 420-P) have all required elements.

2.

Volume I has been substantially upgraded to address NRC question #63.

3.

Code assessments (IETs and SETS) are described in Volumes I and II.

i y

Page 17 E%EEEE

1..

SBLOCA REM NRC/ABB/EO Meeting 1/23/96 Evaluation Methodology Mapping

)

e L

4 4

l e

t Page 18 pggg

f:

LOCA REM NRC/ABB/EO Meeting 1/23/96 SAMPLE RESULT FOR 2700 MWt PWR l

eliuumi 1

e I

l t

A EtIt Page 19 7%B559

t-SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 t

Summary on Evaluation Methodology A

1 3i f

A It Et Page 20 7%E559 l

t

..t SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Conclusions I

1.

CEN 420-P meets CSAU requirements 4

emumm i

t A ED Et Page 21 7%NDED i

I

' y. l

~l:

SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Proposed Action Plan for SBLOCA REM Review and Approval Key Elements NRC and contractor begin review on existing documentation l

Intensive detailed technical meeting

,i Integrate lessons learned - define new documentation needs General Concepts Presentation to ACRS j

Question / Comment resolution with NRC ACRS revicw Question / Comment resolution with ACRS SER I

i A ED ED Page 22 7%B555 i

U.

SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Proposed Action Plan for SBLOCA REM Review and Approval Next Steps NRC, Contractor, and ABB hold detailed technical i

review meeting Initiate review of the SBLOCA REM on the PARCH / REM [

1 l

i JL ElEt I

Page 23 E%EEEE

SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 j

ABB SBLOCA EVALUATION MODEL REVISION J.M. Cleary Supervisor - LOCA Analysis Group l

ABB Combustion Engineering Nuclear Operations l

Page 24 7%EREN

~.

SBLOCA REM NRC/ABB/EO Meeting 1/23/96 ABB SBLOCA EVALUATION MODEL REVISION Objectives of the SBLOCA EM Revision f

l Support EOI's plan for Waterford 3 power uprate

-[

]

Spring 1997 license submittal Minimize impact on NRC review of SBLOCA REM A BR 59 Page 25 pggggg

'I SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 l

1 k

ABB SBLOCA EVALUATION MODEL REVISION Description of the SBLOCA EM Revision i

1 l

Jk ED ER Page 26 7%EDE5 f

c SBLOCA REM NRC/ABB/EO Meeting 1/23/96 ABB SBLOCA EVALUATION MODEL REVISION 1

Features of the SBLOCA EM Revision

?

I t

)

t i

l m

4 i

Page 27

  1. %EDED

NRC/ABB/EOI Meeting 1/23/96 SBLOCA REM ABB SBLOCA EVALUATION MODEL REVISION Summary The SBLOCA EM revision will [

]

for Waterford 3. Preliminary calculations indicate a Peak Cladding Temperature of approximately 2050oF versus the i'

acceptance criterion of 2200oF.

The revision minimizes impact on the NRC review of the SBLOCA REM

-[

]

Documentation will rely heavily on information already reviewed by the NRC A Et 59 Page 28 7%E559

r SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Review and Approval Schedule for SBLOCA REM TASK DATE NRC initiate review, technical meeting with ABB NRC provide comments on PARCH / REM review l

NRC and ABB establish additional documentation General concepts presentation to ACRS ABB submit additional documentation

~

NRC issue review questions on SBLOCA REM ABB question / comment resolution with NRC ACRS review I

ABB question / comment resolution with ACRS/NRC NRC issue SER i

JL ER Et i

Page 30 E%EEEE

SBLOCA REM NRC/ABB/EOI Meeting 1/23/96 Review and Approval Schedule for 1996 SBLOCA EM TASK DATE NRC initiate review, technical meeting with ABB NRC provide comments [

]

ABB submit documentation for revised EM NRC issue review questions on EM submittal ABB respond to review questions NRC issue SER for revised EM A ED ED Page 31 E%EEEE

5.

SBLOCA REM NRC/ABB/EOI Meeting 1/23/96

)

SUMMARY

1 Firm scaeduLe for XRC and ABB on SBLOCA REM review XRC-approved EM revision plan required before committing furtaer resources to (prate ABB action items EOI action items A ED ED Page 32 E%EEEE

h

$l' ABB-Combustion Engineering, Inc.

cc:

Mr. Charles B. Brinkman, Director Nuclear Systems Licensing ABB-Combustion Engineering, Inc.

Post Office Box 500 1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. Ian C. Rickard, Director t

Operations Licensing ABB-Combustion Engineering Nuclear Operations Post Office Box 500 1000 Prospect Hill Road

}

Windsor, Connecticut 06095-0500 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 L

_ _.,,,