ML20133M629: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:F | {{#Wiki_filter:F | ||
^[ | |||
f | -f C( | ||
Portland General Electric Company Trojan Nuclear Plant | W$? | ||
Portland General Electric Company Trojan Nuclear Plant | |||
.&Mi0M2y P.O. Box 439 Rainier, Oregon 97048 (503) 556-3713 | |||
'EG10N VlAF July 3, 1985 WSO-440-85 Mr. John B. Martin Regional Administrator, Region V US Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 | |||
==Dear Sir:== | ==Dear Sir:== | ||
Special Report Limiting conditions for operation (LCO) 3.7.8.2 of the Trojan Technical Specifications requires that a special report be provided if a continuous fire watch is not established within 1 hour when one or more of the required spray, sprinkler and/or deluge systems are inoperable. | Special Report Limiting conditions for operation (LCO) 3.7.8.2 of the Trojan Technical Specifications requires that a special report be provided if a continuous fire watch is not established within 1 hour when one or more of the required spray, sprinkler and/or deluge systems are inoperable. | ||
A continuous fire watch was established while modifications involving welding were being performed on deluge systems 18 and 19. | A continuous fire watch was established while modifications involving welding were being performed on deluge systems 18 and 19. | ||
Sincerel W. S. Orser General Manager sd WSO/SAB/RES: pat c: | The continuous fire watch remained on duty 30 minutes after completion of the welding. At that time, with the deluge systems still inoperable, operations personnel incorrectly established a one-hour roving fire patrol rather than a continuous fire watch. | ||
The discrepancy was noticed during a supervisory tour approximately two hours later and a con-tinuous fire watch was immediately established. | |||
Sincerel W. | |||
S. | |||
Orser General Manager sd WSO/SAB/RES: pat c: | |||
Distribution File: | |||
93.24a 8500130109Bhh$44 PDR ADOCK PDR s | |||
I b | |||
/ G-A 8}} | |||
Latest revision as of 07:30, 12 December 2024
| ML20133M629 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 07/03/1985 |
| From: | Orser W PORTLAND GENERAL ELECTRIC CO. |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| WSO-440-85, NUDOCS 8508130189 | |
| Download: ML20133M629 (1) | |
Text
F
^[
-f C(
W$?
Portland General Electric Company Trojan Nuclear Plant
.&Mi0M2y P.O. Box 439 Rainier, Oregon 97048 (503) 556-3713
'EG10N VlAF July 3, 1985 WSO-440-85 Mr. John B. Martin Regional Administrator, Region V US Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368
Dear Sir:
Special Report Limiting conditions for operation (LCO) 3.7.8.2 of the Trojan Technical Specifications requires that a special report be provided if a continuous fire watch is not established within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> when one or more of the required spray, sprinkler and/or deluge systems are inoperable.
A continuous fire watch was established while modifications involving welding were being performed on deluge systems 18 and 19.
The continuous fire watch remained on duty 30 minutes after completion of the welding. At that time, with the deluge systems still inoperable, operations personnel incorrectly established a one-hour roving fire patrol rather than a continuous fire watch.
The discrepancy was noticed during a supervisory tour approximately two hours later and a con-tinuous fire watch was immediately established.
Sincerel W.
S.
Orser General Manager sd WSO/SAB/RES: pat c:
Distribution File:
93.24a 8500130109Bhh$44 PDR ADOCK PDR s
I b
/ G-A 8