ENS 48807: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 03/05/2013 08:45 EST | | event date = 03/05/2013 08:45 EST | ||
| last update date = 03/05/2013 | | last update date = 03/05/2013 | ||
| title = Sole Irofs Pressure Mat Did Not Function | | title = Sole Irofs Pressure Mat Did Not Function as Designed | ||
| event text = During a post maintenance test of a sole IROFS (Item Relied On For Safety) in the scrap press area, it was discovered that a sole IROFS of a pressure mat did not function as designed. The pressure mat is designed to ensure operator presence. The clutch that would be disengaged when the pressure switch is not active failed to do so. The press was immediately shut down. Similar presses have also been shut down. Double contingency was maintained (Moderation and Mass). The sole IROFS is designed for prevention of a fire scenario. At no time was an unsafe condition present. | | event text = During a post maintenance test of a sole IROFS (Item Relied On For Safety) in the scrap press area, it was discovered that a sole IROFS of a pressure mat did not function as designed. The pressure mat is designed to ensure operator presence. The clutch that would be disengaged when the pressure switch is not active failed to do so. The press was immediately shut down. Similar presses have also been shut down. Double contingency was maintained (Moderation and Mass). The sole IROFS is designed for prevention of a fire scenario. At no time was an unsafe condition present. | ||
There were no radiological or chemical hazards resulting from this event. The licensee is conducting an investigation to determine the cause of the failure. | There were no radiological or chemical hazards resulting from this event. The licensee is conducting an investigation to determine the cause of the failure. |
Revision as of 21:01, 1 March 2018
Where | |
---|---|
Global Nuclear Fuel - Americas Wilmington, North Carolina (NRC Region 2) | |
License number: | Snm-1097 |
Reporting | |
Part 70 App A (A)(4) | |
Time - Person (Reporting Time:+-4.08 h-0.17 days <br />-0.0243 weeks <br />-0.00559 months <br />) | |
Opened: | Scott Murray 09:40 Mar 5, 2013 |
NRC Officer: | John Shoemaker |
Last Updated: | Mar 5, 2013 |
48807 - NRC Website
| |