ENS 49748: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 01/21/2014 06:40 CST | | event date = 01/21/2014 06:40 CST | ||
| last update date = 01/21/2014 | | last update date = 01/21/2014 | ||
| title = Technical Support Center Out | | title = Technical Support Center Out of Service for Planned Maintenance | ||
| event text = On Tuesday, January 21 at 0640 CST, the Kewaunee Power Station Technical Support Center (TSC) ventilation system was removed from service for planned maintenance. The removal of the ventilation system potentially affects the TSC habitability during a declared emergency requiring activation. The Emergency Response Organization (ERO) team has been notified of the maintenance and the possible need to relocate during an emergency. If an emergency is declared and the TSC ERO activation required, the TSC will be staffed and activated unless the TSC becomes uninhabitable due to ambient temperatures, radiological, or other conditions. If relocation of the TSC staff becomes necessary, the Station Emergency Director will relocate the staff to an alternate TSC location. | | event text = On Tuesday, January 21 at 0640 CST, the Kewaunee Power Station Technical Support Center (TSC) ventilation system was removed from service for planned maintenance. The removal of the ventilation system potentially affects the TSC habitability during a declared emergency requiring activation. The Emergency Response Organization (ERO) team has been notified of the maintenance and the possible need to relocate during an emergency. If an emergency is declared and the TSC ERO activation required, the TSC will be staffed and activated unless the TSC becomes uninhabitable due to ambient temperatures, radiological, or other conditions. If relocation of the TSC staff becomes necessary, the Station Emergency Director will relocate the staff to an alternate TSC location. | ||
The ventilation system is expected to be out of service approximately 8 hrs. | The ventilation system is expected to be out of service approximately 8 hrs. |
Latest revision as of 20:51, 1 March 2018
Where | |
---|---|
Kewaunee Wisconsin (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-3.98 h-0.166 days <br />-0.0237 weeks <br />-0.00545 months <br />) | |
Opened: | Sam Goldsmith 08:41 Jan 21, 2014 |
NRC Officer: | Howie Crouch |
Last Updated: | Jan 21, 2014 |
49748 - NRC Website
| |