ENS 49776: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 01/29/2014 09:53 CST | | event date = 01/29/2014 09:53 CST | ||
| last update date = 01/31/2014 | | last update date = 01/31/2014 | ||
| title = Loss | | title = Loss of Technical Support Center Ventilation Fan | ||
| event text = This telephone notification is provided in accordance with Exelon Reportability manual SAF 1.10, 'Major Loss of Emergency Preparedness Capabilities', and 10 CFR 50.72(b)(3)(xiii). | | event text = This telephone notification is provided in accordance with Exelon Reportability manual SAF 1.10, 'Major Loss of Emergency Preparedness Capabilities', and 10 CFR 50.72(b)(3)(xiii). | ||
On January 29th at 09:53 CST, it was determined that the onsite Technical Support Center (TSC) Ventilation System Supply Fan had failed (due to failed fan belts as a result of degraded alignment), resulting in loss of ventilation for the TSC. Repairs have been initiated, however repairs will not have been completed within the time required to staff the TSC. There is currently no emergency event in progress requiring TSC staffing. The Main Control Room remains available as an Emergency Response Facility (ERF), should an event occur requiring Emergency Response Facilities to be staffed. | On January 29th at 09:53 CST, it was determined that the onsite Technical Support Center (TSC) Ventilation System Supply Fan had failed (due to failed fan belts as a result of degraded alignment), resulting in loss of ventilation for the TSC. Repairs have been initiated, however repairs will not have been completed within the time required to staff the TSC. There is currently no emergency event in progress requiring TSC staffing. The Main Control Room remains available as an Emergency Response Facility (ERF), should an event occur requiring Emergency Response Facilities to be staffed. |
Latest revision as of 20:51, 1 March 2018
Where | |
---|---|
Lasalle Illinois (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+2.67 h0.111 days <br />0.0159 weeks <br />0.00366 months <br />) | |
Opened: | Jason Depriest 18:33 Jan 29, 2014 |
NRC Officer: | Daniel Mills |
Last Updated: | Jan 31, 2014 |
49776 - NRC Website
| |