ENS 51206: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 07/07/2015 CDT
| event date = 07/07/2015 CDT
| last update date = 08/10/2015
| last update date = 08/10/2015
| title = Part 21 Interim Report - Notification Of Pressure Seal Valve Yoke Material Compliance
| title = Part 21 Interim Report - Notification of Pressure Seal Valve Yoke Material Compliance
| event text = The following information was received via fax:
| event text = The following information was received via fax:
This letter provides interim notification of Crane Nuclear's investigation into ASME Boiler and Pressure Vessel [B&PV] Section Ill Code design Pressure Seal Valve orders for yokes with integral hubs acting as retaining rings. The information required for this notification is provided below:
This letter provides interim notification of Crane Nuclear's investigation into ASME Boiler and Pressure Vessel [B&PV] Section Ill Code design Pressure Seal Valve orders for yokes with integral hubs acting as retaining rings. The information required for this notification is provided below:

Latest revision as of 21:47, 1 March 2018

ENS 51206 +/-
Where
Crane Nuclear, Inc.
Bolingbrook, Illinois (NRC Region 3)
Organization: Crane Nuclear, Inc.
Reporting
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component
Time - Person (Reporting Time:+26.82 h1.118 days <br />0.16 weeks <br />0.0367 months <br />)
Opened: Jason Klein
07:49 Jul 8, 2015
NRC Officer: Steve Sandin
Last Updated: Aug 10, 2015
51206 - NRC Website