ENS 51635: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 01/05/2016 11:20 EST
| event date = 01/05/2016 11:20 EST
| last update date = 01/05/2016
| last update date = 01/05/2016
| title = Technical Support Center Ventilation Out Of Service
| title = Technical Support Center Ventilation Out of Service
| event text = A condition impacting functionality of the TSC [Technical Support Center] ventilation system was discovered on 1/5/2016 at 1120 [EST]. The issue involves a loss of cooling capability of the TSC ventilation system due to a failed compressor.  Maintenance will begin repairs as soon as parts are made available. Estimated time to repair is unknown at this time.
| event text = A condition impacting functionality of the TSC [Technical Support Center] ventilation system was discovered on 1/5/2016 at 1120 [EST]. The issue involves a loss of cooling capability of the TSC ventilation system due to a failed compressor.  Maintenance will begin repairs as soon as parts are made available. Estimated time to repair is unknown at this time.
If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures unless the TSC becomes uninhabitable. If relocation of the TSC becomes necessary, the Emergency Coordinator will relocate the TSC staff to an alternate location in accordance with applicable site procedures. The Emergency Response Organization team will be notified of the condition and the possible need to relocate during an emergency. This condition does not affect the health and safety of the public or station employees. The NRC Resident Inspector has been notified.
If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures unless the TSC becomes uninhabitable. If relocation of the TSC becomes necessary, the Emergency Coordinator will relocate the TSC staff to an alternate location in accordance with applicable site procedures. The Emergency Response Organization team will be notified of the condition and the possible need to relocate during an emergency. This condition does not affect the health and safety of the public or station employees. The NRC Resident Inspector has been notified.

Latest revision as of 21:46, 1 March 2018

ENS 51635 +/-
Where
Catawba Duke Energy icon.png
South Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-0.22 h-0.00917 days <br />-0.00131 weeks <br />-3.01356e-4 months <br />)
Opened: Scott Milton
16:07 Jan 5, 2016
NRC Officer: Daniel Mills
Last Updated: Jan 5, 2016
51635 - NRC Website