BECO-85-163, Forwards Rev 1 to Procedure 5.7.5, Estimating Core Damage, Per Request in 850701 SER Re post-accident Sampling Sys: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:(-                  . _ _ _ _ - - - - _ _ - _ _ - _ _ _ -
{{#Wiki_filter:(-
4 EOSTON EDISON COMPANY
4 EOSTON EDISON COMPANY
  *f                                                                   800 BOYLETON STREET BOSTON, MAGEACHUBETT5 02199 WILLIAM D. HARRINGTON
*f 800 BOYLETON STREET BOSTON, MAGEACHUBETT5 02199 WILLIAM D. HARRINGTON
          .. C'" ~" '" "                                                                                     September 9, 1985 BECo 85-163 Mr. Domenic B. Vassallo.. Chief Operating Reactors Branch #2 Division of Licensing                                                                                         )
"'," C'" ~" '" "
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
September 9, 1985 BECo 85-163 Mr. Domenic B. Vassallo.. Chief Operating Reactors Branch #2 Division of Licensing
      ,          Washington, D. C.                           20555 License DPR-35 Docket 50-293
)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.
20555 License DPR-35 Docket 50-293


==Dear Str:==
==Dear Str:==
By {{letter dated|date=July 1, 1985|text=letter dated July 1, 1985}}, the NRC provided a Safety Evaluation Report (SER) on the post-accident sampling system (PASS) installed at Pilgrim Nuclear Power Station (PNPS).
By {{letter dated|date=July 1, 1985|text=letter dated July 1, 1985}}, the NRC provided a Safety Evaluation Report (SER) on the post-accident sampling system (PASS) installed at Pilgrim Nuclear Power Station (PNPS).
That SER requested that Boston Edison submit a revised procedure for estimating reactor core damage for NRC review. To expedite NRC review, BECo provided a copy of PNPS Procedure No. 5.7.5, " Estimating Core Damage, Rev. 1",
That SER requested that Boston Edison submit a revised procedure for estimating reactor core damage for NRC review.
To expedite NRC review, BECo provided a copy of PNPS Procedure No. 5.7.5, " Estimating Core Damage, Rev.
1",
to Mr. Paul Leech of your office.
to Mr. Paul Leech of your office.
We hereby formally submit Procedure 5.7.5, Rev. 1 as an attachment to this letter. Should you wish further information on this issue, please contact us.
We hereby formally submit Procedure 5.7.5, Rev. 1 as an attachment to this letter. Should you wish further information on this issue, please contact us.
Very trul) yours, for W. D. Harrington Of          l
Very trul) yours, Of l
for W. D. Harrington


==Attachment:==
==Attachment:==
PNPS Procedure No. 5.7.5 a)N grwa m:,, =                               PDR}}
PNPS Procedure No. 5.7.5 a)N grwa m:,, =
PDR}}

Latest revision as of 22:47, 11 December 2024

Forwards Rev 1 to Procedure 5.7.5, Estimating Core Damage, Per Request in 850701 SER Re post-accident Sampling Sys
ML20137M472
Person / Time
Site: Pilgrim
Issue date: 09/09/1985
From: Harrington W
BOSTON EDISON CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20137M477 List:
References
BECO-85-163, NUDOCS 8509130247
Download: ML20137M472 (1)


Text

(-

4 EOSTON EDISON COMPANY

  • f 800 BOYLETON STREET BOSTON, MAGEACHUBETT5 02199 WILLIAM D. HARRINGTON

"'," C'" ~" '" "

September 9, 1985 BECo 85-163 Mr. Domenic B. Vassallo.. Chief Operating Reactors Branch #2 Division of Licensing

)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.

20555 License DPR-35 Docket 50-293

Dear Str:

By letter dated July 1, 1985, the NRC provided a Safety Evaluation Report (SER) on the post-accident sampling system (PASS) installed at Pilgrim Nuclear Power Station (PNPS).

That SER requested that Boston Edison submit a revised procedure for estimating reactor core damage for NRC review.

To expedite NRC review, BECo provided a copy of PNPS Procedure No. 5.7.5, " Estimating Core Damage, Rev.

1",

to Mr. Paul Leech of your office.

We hereby formally submit Procedure 5.7.5, Rev. 1 as an attachment to this letter. Should you wish further information on this issue, please contact us.

Very trul) yours, Of l

for W. D. Harrington

Attachment:

PNPS Procedure No. 5.7.5 a)N grwa m:,, =

PDR