Log # TXX-4683 TEXAS UTILITIES GENERATING COMPANY                     File # 10110
y Log # TXX-4683 TEXAS UTILITIES GENERATING COMPANY File # 10110 909.5
                                  .... .... _ ,, . .            . . ......, _ ..    ......          909.5
- WILLIAM. G. C.OU.N.S.I.L
  -.WILLIAM.
. January 31, 1986
    . . -  G.
^
            . C.OU.N.S.I.L
;; 1 JAN 311986 lly.
                                                                                            ^
Mr. Eric H. Johnson, Acting Director h
                                                        . January 31, 1986                             ;; 1 JAN 311986       lly .
Division of. Reactor Safety and Projects U.S. Nuclear Regulatory Commission 4
Mr. Eric H. Johnson, Acting Director Division of. Reactor Safety and Projects
611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
                                                                                  "                  h U.S. Nuclear Regulatory Commission                                                           4 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012


==SUBJECT:==
==SUBJECT:==
Line 31: Line 30:


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
On December 5,1985, we verbally notified your Mr. S. Phillips of a defic _iency regarding the diesel generator intake silencer internals.
On December 5,1985, we verbally notified your Mr. S. Phillips of a defic _iency regarding the diesel generator intake silencer internals.
We have submitted an interim report logged TXX-4662, dated January 6, 1986.
We have submitted an interim report logged TXX-4662, dated January 6, 1986.
Evaluation of this concern included disassembly and inspection of the
Evaluation of this concern included disassembly and inspection of the
                  'DG intake silencers to ensure that the internals had been properly welded. These activities have documented the actual weldment for each of the affected parts. .The welding is not as specified in the design, however, adequate weldment exists to preclude dislodgement of the part. The adequacy of existing weldment is based upon recent correspondence pro'vided by American Air Filter.
'DG intake silencers to ensure that the internals had been properly welded. These activities have documented the actual weldment for each of the affected parts..The welding is not as specified in the design, however, adequate weldment exists to preclude dislodgement of the part. The adequacy of existing weldment is based upon recent correspondence pro'vided by American Air Filter.
We have determined that no condition adverse to safety would exist in the event the concern had remained undetected. The issue is not reportable under the provisions of 10CFR50.55(e). Records supporting this determination are available for your inspectors review at the CPSES site.
We have determined that no condition adverse to safety would exist in the event the concern had remained undetected. The issue is not reportable under the provisions of 10CFR50.55(e). Records supporting this determination are available for your inspectors review at the CPSES site.
1
Very truly yours
                                                ~
~
Very truly yours f)[               s
1 f)[
[                                   -
[
W.G. Counsil JCH/gj c - NRC~ Region IV (0 + 1 copy)
s W.G. Counsil JCH/gj c - NRC~ Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies) gQ Q-              U.S. Nuclear Regulatory Commission                                                     a f
Q-Director, Inspection & Enforcement (15 copies) gQ U.S. Nuclear Regulatory Commission a
gt                     Washington, D.C. 20555 a omssou or rexas umuries stecraic coursur                         pW    J[}}
p J[
W gt Washington, D.C.
20555 f
a omssou or rexas umuries stecraic coursur
-}}

Latest revision as of 23:15, 11 December 2024

Deficiency Rept CP-85-48 Re Diesel Generator Intake Silencer Internals.Initially Reported on 851205.Evaluation Included Disassembly & Insp to Insure Internals Properly Welded. Issue Not Reportable Per 10CFR50.55(e)
ML20137R689
Person / Time
Site: Comanche Peak  
Issue date: 01/31/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-85-48, TXX-4683, NUDOCS 8602130375
Download: ML20137R689 (1)


Text

-

y Log # TXX-4683 TEXAS UTILITIES GENERATING COMPANY File # 10110 909.5

- WILLIAM. G. C.OU.N.S.I.L

. January 31, 1986

^

1 JAN 311986 lly.

Mr. Eric H. Johnson, Acting Director h

Division of. Reactor Safety and Projects U.S. Nuclear Regulatory Commission 4

611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 DG INTAKE SILENCER INTERNALS SDAR: CP-85-48

Dear Mr. Johnson:

On December 5,1985, we verbally notified your Mr. S. Phillips of a defic _iency regarding the diesel generator intake silencer internals.

We have submitted an interim report logged TXX-4662, dated January 6, 1986.

Evaluation of this concern included disassembly and inspection of the

'DG intake silencers to ensure that the internals had been properly welded. These activities have documented the actual weldment for each of the affected parts..The welding is not as specified in the design, however, adequate weldment exists to preclude dislodgement of the part. The adequacy of existing weldment is based upon recent correspondence pro'vided by American Air Filter.

We have determined that no condition adverse to safety would exist in the event the concern had remained undetected. The issue is not reportable under the provisions of 10CFR50.55(e). Records supporting this determination are available for your inspectors review at the CPSES site.

Very truly yours

~

1 f)[

[

s W.G. Counsil JCH/gj c - NRC~ Region IV (0 + 1 copy)

Q-Director, Inspection & Enforcement (15 copies) gQ U.S. Nuclear Regulatory Commission a

p J[

W gt Washington, D.C.

20555 f

a omssou or rexas umuries stecraic coursur

-