TXX-4567, Deficiency Rept SDAR-193 Re Potential Elimination of Control Capability of Feedwater Regulating Valve Due to Location of Power Supply in Cable Spreading Room.Initially Reported on 850827.Completion of Evaluation Anticipated by 851018: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:__ | {{#Wiki_filter:__ | ||
I kkb TEXAS UTILITIES GENERATING COMPANY | I kkb TEXAS UTILITIES GENERATING COMPANY oy.., u,..... | ||
oy.., u,... . . | ,umni ouve r===v, '=. = i naue, t=x^a =" | ||
w;a g o ,cguns;g | w;a g o,cguns;g September 24, 1985 TXX-4567 Mr. D.R. Hunter, Chief Reactor Project Branch 2 U.S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611'Ryan Plaza Drive, Suite 1000 Docket Nos.: 50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION AUXILIARY FEEDWATER SYSTEM QA FILE: CP-85-32, SDAR-193 FILE N0.: | ||
10110 | |||
==Dear Mr. Hunter:== | ==Dear Mr. Hunter:== | ||
On August 27, 1985 we verbally notified your Mr. T. Westerman of a deficiency regarding the potential elimination of control capability of the feedwater regulating valve due to its power supply being located in the cable spread room. | On August 27, 1985 we verbally notified your Mr. T. Westerman of a deficiency regarding the potential elimination of control capability of the feedwater regulating valve due to its power supply being located in the cable spread room. | ||
We are continuing our evaluation and anticipate completion by October 18, 1985. | We are continuing our evaluation and anticipate completion by October 18, 1985. | ||
Very truly yours, | Very truly yours, | ||
/g W.G. Counsil WGC:mlm cc: NRC Region IV - (0 + 1 copy) | |||
Director, Inspection & Enforcement (15 copies) | Director, Inspection & Enforcement (15 copies) | ||
U.S. Nuclear Regulatory Commission Washington, DC 20555 i< | U.S. Nuclear Regulatory Commission Washington, DC 20555 i< | ||
h AD | |||
S | ' i S | ||
gFSU | gFSU L[' | ||
/ | |||
,,,,,. -, -. _.. -..c-- | |||
,~, | |||
n | n | ||
-}} | |||
Latest revision as of 23:01, 11 December 2024
| ML20137S699 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/24/1985 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Hunter D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| SDAR-193, TXX-4567, NUDOCS 8509300481 | |
| Download: ML20137S699 (1) | |
Text
__
I kkb TEXAS UTILITIES GENERATING COMPANY oy.., u,.....
,umni ouve r===v, '=. = i naue, t=x^a ="
w;a g o,cguns;g September 24, 1985 TXX-4567 Mr. D.R. Hunter, Chief Reactor Project Branch 2 U.S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611'Ryan Plaza Drive, Suite 1000 Docket Nos.: 50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION AUXILIARY FEEDWATER SYSTEM QA FILE: CP-85-32, SDAR-193 FILE N0.:
10110
Dear Mr. Hunter:
On August 27, 1985 we verbally notified your Mr. T. Westerman of a deficiency regarding the potential elimination of control capability of the feedwater regulating valve due to its power supply being located in the cable spread room.
We are continuing our evaluation and anticipate completion by October 18, 1985.
Very truly yours,
/g W.G. Counsil WGC:mlm cc: NRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U.S. Nuclear Regulatory Commission Washington, DC 20555 i<
h AD
' i S
gFSU L['
/
,,,,,. -, -. _.. -..c--
,~,
n
-