{{Adams
#REDIRECT [[IR 05000219/1985002]]
| number = ML20138A771
| issue date = 03/07/1986
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-219/85-02. Corrective Actions Examined During Region I Insps on 850514 & 0722-26 Adequate
| author name = Martin T
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee name = Fiedler P
| addressee affiliation = GENERAL PUBLIC UTILITIES CORP.
| docket = 05000219
| license number =
| contact person =
| document report number = NUDOCS 8603200056
| title reference date = 04-24-1985
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000219/1985002]]
 
=Text=
{{#Wiki_filter:r  m
  i 4 ,
                                                                  ::-ti.;a T.1er:ms
                                                                              .
                                                        s
                                                          ~w n'    7 Wth]YiO&th&W
                                                      MAR 0 71986
      Docket No. 50-219
      GPU Nuclear Corporation
      ATTN: Mr. P. B. Fiedler
              Vice President and Director
      0yster Creek Nuclear Generating Station
      P. O. Box 388
      Forked River, NJ 08731
      Gentlemen:
      Subject: Inspection No. 50-219/85-02
      This is in reference to your letter dated April 24, 1985, in response to our
      letter dated March 29, 1985. We apologize for the delay in responding to your
      letter.
      Thank you for informing us of the interim and final corrective actions
      documented in your letter. Those actions were examined during NRC Region I
      inspections conducted on May 14, 1985 and on July 22-26, 1985 and appeared to
      be adequate.
      In your response to Violation A, you contend that it was not technically
      feasible (or practical) to comply with the commitment in your physical security
      plan. However, as demonstrated by your interim and final corrective actions,
      it is our view that it was technically feasible to comply with your commitment.
      In addition, the measure you implemented on your own to compensate for the
      weakness, as described in the first paragraph of your response, did not obviate
      the vulnerability that formed the basis for the violation and, therefore, would
      not have been accepted for that purpose, if it had been submitted to the NRC.
      Further, an obstruction in the same area added to the vulnerability, and the
      existence of that obstruction was also not in compliance with NRC requirements.
      Therefore, we find that the violation is valid and will remain as cited.
      Attachment A to your letter contains information which is exempt from public
      disclosure in accordance with 10 CFR 73.21. Therefore, the attachment will
      not be placed in the NRC's Public Document Room and will receive limited
      distribution.
      Your cooperation with us is appreciated.
                                              Sincerely,
                                                                                        '
                                                Original Signed 3y:
                                                  Thomas T. ta-tin
                                              Thomas T. Martin, Director
          $[2j@8%$$$o0[19                      Division of Radiation Safety and
                                                Safeguards
          G                  PDR
                                    0FFICIAL RECORD COPY        RL GPU - 0001.0.0                '
                                                                                                  '
                                                                03/05/86
                                                                                  'tf.y! a.:d l10
 
r-
'
  I' . ,
        GPU Nuclear Corporation                2
                                                    W 07 M
        cc:
        M. Laggart, BWR Licensing Manager
        Licensing Manager, Oyster Creek
        Public Document Room (PDR)
        Local Public Document Room (LPDR)
        Nuclear Safety Information Center (NSIC)
        NRC Resident Inspector
        State.of New Jersey
        bec w/ encl:
        Region I Docket Room (with concurrences)
        Management Assistant, ORMA (w/o encl)
        Section Chief, DRP
                /
              ,/
        RI: RS                S        R      SS
        Ke',ig/gcb      oy er            rt'i n
        j/[/86              I
                                  0FFICIAL RECORD COPY    RL GPU - 0001.1.0
                                                          03/05/86