ULNRC-03570, Forwards Rev 3 to Callaway Cycle 9 COLR, Which Has Been Updated W/Addl W(Z) Surveillance Factors to Cover Wider Range of Measured Axial Offset Values,Per TS 6.9.1.9: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:_ _ _ _ | ||
1901 Chouteav Avenue i | 1901 Chouteav Avenue i | ||
Post Office Box 149 St. Louis Mussoun 63166 318-554 2650 l | Post Office Box 149 St. Louis Mussoun 63166 318-554 2650 l | ||
i NION | i NION Doa8/dF SchneII ELECTRIC April 29, 1997 senior v,ce pres,sent Nuclear | ||
'i,} | |||
U. S. Nuclear Regulatory Commission ATTN: | U. | ||
Mail Station P1-137 Washington, D. C. | S. | ||
Attached please find Revision 3 to the Callaway Plant Cycle 9 Core Operating Limits Report | Nuclear Regulatory Commission ATTN: | ||
(COLR). The COLR has been updated with additional | Document Control Desk Mail Station P1-137 Washington, D. | ||
The COLR is hereby submitted per Technical Specification 6.9.1.9. | C. | ||
20555-0001 Gentlemen: | |||
l Very truly yours, | ULNRC- 0 3 570 CALLAWAY PLANT DOCKET NUMBER 50-483 CORE OPERATING LIMITS REPORT l | ||
Attached please find Revision 3 to the Callaway Plant Cycle 9 Core Operating Limits Report (COLR). | |||
The COLR has been updated with additional W(z) surveillance factors to cover a wider range of I | |||
measured axial offset values. | |||
The COLR is hereby submitted per Technical Specification 6.9.1.9. | |||
If you have any questions i | |||
concerning this report, please contact us. | |||
l Very truly yours, d | |||
Ts7n1 y | |||
WEK/ | |||
i | i | ||
\\'![ | |||
Attachment | Attachment g | ||
EP18MRHgga," | |||
Il.lili.llll.lWh.lM. . .ill.ll | Il.lili.llll.lWh.lM...ill.ll PDR | ||
1 | 1 l | ||
i cc: | |||
i cc: | M. H. | ||
Professional Nuclear Consulting, Inc. | Fletcher-i Professional Nuclear Consulting, Inc. | ||
I Regional Administrator U.S. Nuclear Regulatory Commission | 19041 Raines Drive Derwood, MD 20855-2432 5 | ||
Arlington, TX 76011-8064 | I Regional Administrator U.S. Nuclear Regulatory Commission i | ||
8201 NRC Road | Region IV 3 | ||
Steedman, MO 65077 | 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011-8064 e | ||
Rockville, MD 20852-2738 Manager, Electric Department | Senior' Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Cornission 8201 NRC Road Steedman, MO 65077 l | ||
P.O. Box 360 | Kristine M. Thomas (2) i Office of Nuclear Reactor Regulation i | ||
U.S. Nuclear Regulatory Commission i | |||
1 White Flint, North, Mail Stop 13E16 11555 Rockville Pike Rockville, MD 20852-2738 Manager, Electric Department f | |||
Missouri Public Service Commission P.O. Box 360 t | |||
Jefferson City, MO 65102 l | |||
I i | I i | ||
i | i | ||
bcc: J. Brandt/A160.761 | bcc: | ||
J. Brandt/A160.761 | |||
E210.01 J. V. Laux G. L. Randolph R. J. Irwin P. M. Barrett J. D. Blosser A. C. Passwater D. E. Shafer W. E. Kahl S. Wideman (WCNOC) | /0A Record (CA-758) | ||
A. J. DiPerna, (Bechtel) | E210.01 J. V. | ||
H. D. Bono NSRB (Patty Reynolds) | Laux G. L. Randolph R. | ||
J. | |||
Irwin P. M. Barrett J. | |||
D. Blosser A. C. | |||
Passwater D. E. | |||
Shafer W. | |||
E. Kahl S. Wideman (WCNOC) | |||
A. | |||
J. DiPerna, (Bechtel) | |||
H. | |||
D. Bono NSRB (Patty Reynolds) l}} | |||
Latest revision as of 19:26, 11 December 2024
| ML20138G087 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 04/29/1997 |
| From: | Schnell D UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20138G092 | List: |
| References | |
| ULNRC-03570, ULNRC-3570, NUDOCS 9705060172 | |
| Download: ML20138G087 (3) | |
Text
_ _ _ _
1901 Chouteav Avenue i
Post Office Box 149 St. Louis Mussoun 63166 318-554 2650 l
i NION Doa8/dF SchneII ELECTRIC April 29, 1997 senior v,ce pres,sent Nuclear
'i,}
U.
S.
Nuclear Regulatory Commission ATTN:
Document Control Desk Mail Station P1-137 Washington, D.
C.
20555-0001 Gentlemen:
ULNRC- 0 3 570 CALLAWAY PLANT DOCKET NUMBER 50-483 CORE OPERATING LIMITS REPORT l
Attached please find Revision 3 to the Callaway Plant Cycle 9 Core Operating Limits Report (COLR).
The COLR has been updated with additional W(z) surveillance factors to cover a wider range of I
measured axial offset values.
The COLR is hereby submitted per Technical Specification 6.9.1.9.
If you have any questions i
concerning this report, please contact us.
l Very truly yours, d
Ts7n1 y
WEK/
i
\\'![
Attachment g
EP18MRHgga,"
Il.lili.llll.lWh.lM...ill.ll PDR
1 l
i cc:
M. H.
Fletcher-i Professional Nuclear Consulting, Inc.
19041 Raines Drive Derwood, MD 20855-2432 5
I Regional Administrator U.S. Nuclear Regulatory Commission i
Region IV 3
611 Ryan Plaza Drive Suite 400 Arlington, TX 76011-8064 e
Senior' Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Cornission 8201 NRC Road Steedman, MO 65077 l
Kristine M. Thomas (2) i Office of Nuclear Reactor Regulation i
U.S. Nuclear Regulatory Commission i
1 White Flint, North, Mail Stop 13E16 11555 Rockville Pike Rockville, MD 20852-2738 Manager, Electric Department f
Missouri Public Service Commission P.O. Box 360 t
Jefferson City, MO 65102 l
I i
i
bcc:
J. Brandt/A160.761
/0A Record (CA-758)
E210.01 J. V.
Laux G. L. Randolph R.
J.
Irwin P. M. Barrett J.
D. Blosser A. C.
Passwater D. E.
Shafer W.
E. Kahl S. Wideman (WCNOC)
A.
J. DiPerna, (Bechtel)
H.
D. Bono NSRB (Patty Reynolds) l