TXX-4668, Interim Deficiency Rept CP-85-54 Re Discrepancies in supplier-provided HVAC Support Documents Which Could Invalidate Seismic Qualification of Supports.Initially Reported on 851220.Completion Anticipated by 860305: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
* 400 NORTH OEJVE prI1tEET. L.B. M S
* 400 NORTH OEJVE prI1tEET. L.B. M S
* DAIAAN. TEXAR 75201 January 20, 1986
* DAIAAN. TEXAR 75201 January 20, 1986
#EYJA.*r fEih J
#EYJA.*r fEih
                                                                                            $@$]N33 JAN 2 21986 Mr. Eric H. Johnson, Acting Director Division of Reactor Safety and Projects                                       -
$@$]N33 J
Y U.S. Nuclear Regulatory Commission                                                                   ~
JAN 2 21986 Mr. Eric H. Johnson, Acting Director Y
Division of Reactor Safety and Projects U.S. Nuclear Regulatory Commission
~
611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 SEISMIC QUALIFICATION OF HVAC SUPPORTS SDAR-     CP-85-54
DOCKET NOS. 50-445 AND 50-446 SEISMIC QUALIFICATION OF HVAC SUPPORTS SDAR-CP-85-54


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
On December 20, 1985 we verbally notified your Mr. Raymond Hall of a defi-ciency involving discrepancies in supplier provided HVAC support documents which could invalidate the seismic qualification of the supports. This is an interim report of a potentially reportable ite;n under the provisions of 10CFR50.55(e).
On December 20, 1985 we verbally notified your Mr. Raymond Hall of a defi-ciency involving discrepancies in supplier provided HVAC support documents which could invalidate the seismic qualification of the supports. This is an interim report of a potentially reportable ite;n under the provisions of 10CFR50.55(e).
We are continuing our evaluatien and anticipate completion by March 5, 1986.
We are continuing our evaluatien and anticipate completion by March 5, 1986.
Very truly yours,
Very truly yours,
                                                                    /             M'7[A W. G. Counsil JCH/ arm c - NRC Region IV (0 + 1 copy)
/
M'7[A W. G. Counsil JCH/ arm c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
Director, Inspection & Enforcement (15 copies)
U.S. Nuclear Regulatory Commission Washington, D r,. 20555 0216 B60120
U.S. Nuclear Regulatory Commission Washington, D r,.
                                &I2l Dock 0500o445 S
20555
&I2l Dock 0500o445 0216 B60120 S
PDR
PDR
% -O 6g A URVISl0N OF TEXAN UTIEJTIEN EIECTitic CintPANY l'h~92
% -O 6g l'h~92 A URVISl0N OF TEXAN UTIEJTIEN EIECTitic CintPANY
                                                                                                                'f0}}
'f0}}

Latest revision as of 17:57, 11 December 2024

Interim Deficiency Rept CP-85-54 Re Discrepancies in supplier-provided HVAC Support Documents Which Could Invalidate Seismic Qualification of Supports.Initially Reported on 851220.Completion Anticipated by 860305
ML20140D214
Person / Time
Site: Comanche Peak  
Issue date: 01/20/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
.., CP-85-54, TXX-4668, NUDOCS 8601290216
Download: ML20140D214 (1)


Text

Log # TXX-4668 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWEk

  • 400 NORTH OEJVE prI1tEET. L.B. M S
  • DAIAAN. TEXAR 75201 January 20, 1986
  1. EYJA.*r fEih

$@$]N33 J

JAN 2 21986 Mr. Eric H. Johnson, Acting Director Y

Division of Reactor Safety and Projects U.S. Nuclear Regulatory Commission

~

611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 SEISMIC QUALIFICATION OF HVAC SUPPORTS SDAR-CP-85-54

Dear Mr. Johnson:

On December 20, 1985 we verbally notified your Mr. Raymond Hall of a defi-ciency involving discrepancies in supplier provided HVAC support documents which could invalidate the seismic qualification of the supports. This is an interim report of a potentially reportable ite;n under the provisions of 10CFR50.55(e).

We are continuing our evaluatien and anticipate completion by March 5, 1986.

Very truly yours,

/

M'7[A W. G. Counsil JCH/ arm c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U.S. Nuclear Regulatory Commission Washington, D r,.

20555

&I2l Dock 0500o445 0216 B60120 S

PDR

% -O 6g l'h~92 A URVISl0N OF TEXAN UTIEJTIEN EIECTitic CintPANY

'f0