CY-97-052, Forwards Two Copies of Annual Radiological Environ Operating Rept, IAW Requirements of Haddam Neck Radiological Effluent Monitoring Manual: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.         -        -                                                                      -
{{#Wiki_filter:.
YANKEE ATOMIC POWER COMPANY C CONNECTICUT                                                                  HADDAM NECK PLANT 362 INJUN Hollow RoAo e EAST HAMPToN. CT 06424-3099 April 30,1997 Docket No. 50-213 CY-97-052 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Haddam Neck Plant Annual Radiological Environmental Ooerating Reoort in accordance with the requirements of the Haddam Neck Radiological Effluent Monitoring Manual, an implementing document of the Haddam Neck Technical Specifications, two (2) copies of the Annual Radiological Environmental Operating Report are herewith submitted. Copies of this report are being                                   I distributed in accordance with 10CFR50.4 (b) (1).
C CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN Hollow RoAo e EAST HAMPToN. CT 06424-3099 April 30,1997 Docket No. 50-213 CY-97-052 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Haddam Neck Plant Annual Radiological Environmental Ooerating Reoort in accordance with the requirements of the Haddam Neck Radiological Effluent Monitoring Manual, an implementing document of the Haddam Neck Technical Specifications, two (2) copies of the Annual Radiological Environmental Operating Report are herewith submitted. Copies of this report are being distributed in accordance with 10CFR50.4 (b) (1).
1 Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY For:     Ted C. Feigenbaum Executive Vice President and Chief Nuclear fficer 4
Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY For:
l By:     RQ A. Mellor\
Ted C. Feigenbaum Executive Vice President and Chief Nuclear fficer 4
Director of Site Operations and D
By:
Q LD\         l 0C 03cOrSmissioning Attachments i
RQ A. Mellor\\
cc:   H. J. Miller, Region I, Administrator M. B. Fairtile, NRC Project Manager, Haddam Neck Plant W. J. Raymond, Senior Resident inspector, Haddam Neck Plant l
l Director of Site Operations and Q LD\\
  ; n5988 8 Ps8888 m PDR IllIll Illl111111ll R}}
l 0C 03cOrSmissioning D
Attachments cc:
H. J. Miller, Region I, Administrator i
M. B. Fairtile, NRC Project Manager, Haddam Neck Plant l
W. J. Raymond, Senior Resident inspector, Haddam Neck Plant
; n5988 8 Ps8888 m IllIll Illl111111ll PDR R}}

Latest revision as of 12:35, 11 December 2024

Forwards Two Copies of Annual Radiological Environ Operating Rept, IAW Requirements of Haddam Neck Radiological Effluent Monitoring Manual
ML20148A084
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 04/30/1997
From: Mellor R
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20148A011 List:
References
CY-97-052, CY-97-52, NUDOCS 9705080067
Download: ML20148A084 (1)


Text

.

C CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN Hollow RoAo e EAST HAMPToN. CT 06424-3099 April 30,1997 Docket No. 50-213 CY-97-052 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Haddam Neck Plant Annual Radiological Environmental Ooerating Reoort in accordance with the requirements of the Haddam Neck Radiological Effluent Monitoring Manual, an implementing document of the Haddam Neck Technical Specifications, two (2) copies of the Annual Radiological Environmental Operating Report are herewith submitted. Copies of this report are being distributed in accordance with 10CFR50.4 (b) (1).

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY For:

Ted C. Feigenbaum Executive Vice President and Chief Nuclear fficer 4

By:

RQ A. Mellor\\

l Director of Site Operations and Q LD\\

l 0C 03cOrSmissioning D

Attachments cc:

H. J. Miller, Region I, Administrator i

M. B. Fairtile, NRC Project Manager, Haddam Neck Plant l

W. J. Raymond, Senior Resident inspector, Haddam Neck Plant

n5988 8 Ps8888 m IllIll Illl111111ll PDR R