C 903.11 ef. I 10G R50.55(e) 1UELECTRIC March 11, 1988 wim. c. co.w, inan vu nuacu U. S. Nuclear Regulatory Commission Attn: | |||
Document Control Desk Washington, D.C. | |||
20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 UNQUALIFIED TERMINAL BLOCKS SDAR: CP-87-139 | COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 UNQUALIFIED TERMINAL BLOCKS SDAR: CP-87-139 (FINALREPORT) | ||
Gentlemen: | Gentlemen: | ||
On December 30, 1987, we verbally notified your Mr. R. F. Warnick of a deficiency involving equipment qualification of terminal blocks inside and | On December 30, 1987, we verbally notified your Mr. R. F. Warnick of a deficiency involving equipment qualification of terminal blocks inside and outside of containment. We determined this deficiency to be reportable in our last report on this issue (TXX-88028 dated January 5, 1988). | ||
This is a final j | |||
report to status corrective actions taken to resolve this deficiency. | |||
Replacement of the Weidmu11er tenninal blocks (as described in TXX-88028) will be completed by October 1,1988 f or Unit 1 and Unit 2 fuel load for Unit 2. | Replacement of the Weidmu11er tenninal blocks (as described in TXX-88028) will be completed by October 1,1988 f or Unit 1 and Unit 2 fuel load for Unit 2. | ||
i Very truly yours, f | i Very truly yours, f | ||
c-Mr. R. D. Martin, Region IV Resident inspectors CPSES (3) i i | W W. G. Counsil VIP /grr c-Mr. R. D. Martin, Region IV 4 | ||
n | Resident inspectors CPSES (3) i i | ||
L | n 4 | ||
i k | i L | ||
I i | |||
k Db$ b5 b4AS m esh oin aurut last mila. Tam im G | |||
DCD$2 l}} | |||
Latest revision as of 08:15, 11 December 2024
| ML20150B147 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/11/1988 |
| From: | Council W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-87-139, TXX-88286, NUDOCS 8803160197 | |
| Download: ML20150B147 (1) | |
Text
.
i MEE Lo
- TXX-88286 Fi e # 10110 r
C 903.11 ef. I 10G R50.55(e) 1UELECTRIC March 11, 1988 wim. c. co.w, inan vu nuacu U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 UNQUALIFIED TERMINAL BLOCKS SDAR: CP-87-139 (FINALREPORT)
Gentlemen:
On December 30, 1987, we verbally notified your Mr. R. F. Warnick of a deficiency involving equipment qualification of terminal blocks inside and outside of containment. We determined this deficiency to be reportable in our last report on this issue (TXX-88028 dated January 5, 1988).
This is a final j
report to status corrective actions taken to resolve this deficiency.
Replacement of the Weidmu11er tenninal blocks (as described in TXX-88028) will be completed by October 1,1988 f or Unit 1 and Unit 2 fuel load for Unit 2.
i Very truly yours, f