{{#Wiki_filter:Ctation Support Department
{{#Wiki_filter:Ctation Support Department d
    ,  d a   V PECO NUCLEAR
a V
                  ^
PECO NUCLEAR nco te. c.-
nco te. c.-
^
965 Chestertwook Boulevard A Unit of PECO Energy                                           Wayne, PA 19087-5691 September 11,1998 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85
965 Chestertwook Boulevard A Unit of PECO Energy Wayne, PA 19087-5691 September 11,1998 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85
: U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
: U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555


==Subject:==
==Subject:==
Limerick Generating Station, Units 1 and 2
Limerick Generating Station, Units 1 and 2
                          ' Withdrawal of Technical Specifications Change Request No. 93-28-0
' Withdrawal of Technical Specifications Change Request No. 93-28-0


==Dear Sir / Madam:==
==Dear Sir / Madam:==
By {{letter dated|date=May 3, 1996|text=letter dated May 3,1996}}, PECO Energy Company submitted Technical Specifications (TS) Change Request No. 93-28-0 requesting changes to the TS
By {{letter dated|date=May 3, 1996|text=letter dated May 3,1996}}, PECO Energy Company submitted Technical Specifications (TS) Change Request No. 93-28-0 requesting changes to the TS
          '(Appendix A) of Operating License Nos. NPF-39 and NPF-85 for Limerick Generating Station (LGS), Units 1 and 2. The proposed changes concern a revision to the frequency of testing the Standby Gas Treatment System and the Reactor Enclosure Recirculation System.
'(Appendix A) of Operating License Nos. NPF-39 and NPF-85 for Limerick Generating Station (LGS), Units 1 and 2. The proposed changes concern a revision to the frequency of testing the Standby Gas Treatment System and the Reactor Enclosure Recirculation System.
After further review, PECO Energy has determined that the proposed TS changes .
After further review, PECO Energy has determined that the proposed TS changes.
should no longer be pursued. Therefore, PECO Energy hereby withdraws TS Change Request No. 93-28-0.
should no longer be pursued. Therefore, PECO Energy hereby withdraws TS Change Request No. 93-28-0.
If you have any questions concerning this matter, please do not hesitate to contact us.-
If you have any questions concerning this matter, please do not hesitate to contact us.-
Very truly yours,
Very truly yours,
                                                                                                            \
\\
o
o
        . Garrett D. Edwards Director- Licensing 0 \
. Garrett D. Edwards Director-Licensing
o cc:       H. J. Miller, Administrator, Region I, USNRC A. L. Burritt, USNRC Senior Resident inspector, LGS l                   R. R. Janati, PA Bureau of Radiological Protection
\\
    ;p                       pDR _}}
0 o
cc:
H. J. Miller, Administrator, Region I, USNRC A. L. Burritt, USNRC Senior Resident inspector, LGS l
R. R. Janati, PA Bureau of Radiological Protection
;p pDR _}}

Latest revision as of 03:20, 11 December 2024

Withdraws TS Change Request 93-28-0,re Revision to Frequency of Testing SGTS & Reactor Enclosure Recirculation Sys
ML20153B069
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/11/1998
From: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9809220309
Download: ML20153B069 (1)


Text

Ctation Support Department d

a V

PECO NUCLEAR nco te. c.-

^

965 Chestertwook Boulevard A Unit of PECO Energy Wayne, PA 19087-5691 September 11,1998 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Limerick Generating Station, Units 1 and 2

' Withdrawal of Technical Specifications Change Request No. 93-28-0

Dear Sir / Madam:

By letter dated May 3,1996, PECO Energy Company submitted Technical Specifications (TS) Change Request No. 93-28-0 requesting changes to the TS

'(Appendix A) of Operating License Nos. NPF-39 and NPF-85 for Limerick Generating Station (LGS), Units 1 and 2. The proposed changes concern a revision to the frequency of testing the Standby Gas Treatment System and the Reactor Enclosure Recirculation System.

After further review, PECO Energy has determined that the proposed TS changes.

should no longer be pursued. Therefore, PECO Energy hereby withdraws TS Change Request No. 93-28-0.

If you have any questions concerning this matter, please do not hesitate to contact us.-

Very truly yours,

\\

o

. Garrett D. Edwards Director-Licensing

\\

0 o

cc:

H. J. Miller, Administrator, Region I, USNRC A. L. Burritt, USNRC Senior Resident inspector, LGS l

R. R. Janati, PA Bureau of Radiological Protection

p pDR _