TXX-4718, Interim Deficiency Rept CP-85-54 Re Discrepancies in Supplier Provided HVAC Support Documents Which Could Invalidate Seismic Qualification of Supports.Initially Reported on 851220.Final Rept Expected by 860619: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 20: | Line 20: | ||
* 400 NORTH OLIVE NTREET. E.B. 5 & | * 400 NORTH OLIVE NTREET. E.B. 5 & | ||
* EDAIAAm. TEXAN 78301 February 28, 1986 | * EDAIAAm. TEXAN 78301 February 28, 1986 | ||
.MU A.*?".".*.i b | |||
'l' t / | |||
o | |||
Mr. Eric H.' Johnson, Director | ^ | ||
~ | |||
J, | Mr. Eric H.' Johnson, Director J, | ||
MU? | |||
3 l986 Division of Reactor Safety and Projects p | |||
U.S. Nuclear Regulatory Commission O | |||
611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 32: | Line 35: | ||
==Dear Mr. Johnson:== | ==Dear Mr. Johnson:== | ||
On December 20, 1985, we verbally notified your Mr. R. Hall of a deficiency involving discrepancies in supplier provided HVAC support documents which could invalidate the seismic qualification of the supports. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4668, dated January 20, 1986. | On December 20, 1985, we verbally notified your Mr. R. Hall of a deficiency involving discrepancies in supplier provided HVAC support documents which could invalidate the seismic qualification of the supports. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4668, dated January 20, 1986. | ||
A program of field inspections and engineering verification has been'ini-tiated to determine the extent of this issue. As-built analyses of the support system in selected plant areas, in addition to the review of speci-fic hardware concerns, will provide information to assess the unresolved support qualification issue. These efforts are currently scheduled for completion in late May, 1986. | A program of field inspections and engineering verification has been'ini-tiated to determine the extent of this issue. As-built analyses of the support system in selected plant areas, in addition to the review of speci-fic hardware concerns, will provide information to assess the unresolved support qualification issue. These efforts are currently scheduled for completion in late May, 1986. | ||
We are continuing our evaluation and anticipate completion of our final report by June 19, 1986. | We are continuing our evaluation and anticipate completion of our final report by June 19, 1986. | ||
Very truly yours, 8603100645 860228 | Very truly yours, 8603100645 860228 g | ||
PDR ADOCK 05000445 S | |||
PDR W. G. Counsil JCH/ arm c - NRC Region IV (0 + 1 copy) | |||
Director, Inspection & Enforcement (15 copies) | Director, Inspection & Enforcement (15 copies) | ||
U. S. Nuclear Regulatory Commission | U. S. Nuclear Regulatory Commission l @ | ||
Washington, D.C. 20555 h- | Washington, D.C. | ||
20555 h-fca7 | |||
. _. _}} | |||
Latest revision as of 01:26, 11 December 2024
| ML20154J530 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/28/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-85-54, TXX-4718, NUDOCS 8603100645 | |
| Download: ML20154J530 (1) | |
Text
__
Log # TXX-4718 File # 10110 903.7 TEXAS UTILITIES GENERATING COMPANY BMYWAY TOWER
- 400 NORTH OLIVE NTREET. E.B. 5 &
- EDAIAAm. TEXAN 78301 February 28, 1986
.MU A.*?".".*.i b
'l' t /
o
^
~
Mr. Eric H.' Johnson, Director J,
MU?
3 l986 Division of Reactor Safety and Projects p
U.S. Nuclear Regulatory Commission O
611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 SEISMIC QUALIFICATION OF HVAC SUPPORTS SDAR: CP-85-54
Dear Mr. Johnson:
On December 20, 1985, we verbally notified your Mr. R. Hall of a deficiency involving discrepancies in supplier provided HVAC support documents which could invalidate the seismic qualification of the supports. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4668, dated January 20, 1986.
A program of field inspections and engineering verification has been'ini-tiated to determine the extent of this issue. As-built analyses of the support system in selected plant areas, in addition to the review of speci-fic hardware concerns, will provide information to assess the unresolved support qualification issue. These efforts are currently scheduled for completion in late May, 1986.
We are continuing our evaluation and anticipate completion of our final report by June 19, 1986.
Very truly yours, 8603100645 860228 g
PDR ADOCK 05000445 S
PDR W. G. Counsil JCH/ arm c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission l @
Washington, D.C.
20555 h-fca7
. _. _