ML20155C342: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
{{#Wiki_filter:.
{{#Wiki_filter:.
9
9
                                                            ==
-==
                                                            ..      9   -"
9 log # TXX-88486 1
log # TXX-88486 1
File # 10110
                                                            ~
~
                                                                      -          File # 10110
~~
                                                                        ~~
908.3 7UELECTR/C Ref. # 10CFR50.55(e)
908.3 7UELECTR/C               Ref. # 10CFR50.55(e)
Wmism G. Counsil Executow Y,cr Presder,a U. S. Nuclear Regulatory Commission Attn:
Wmism G. Counsil Executow Y,cr Presder,a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Document Control Desk Washington, D.C.
20555


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS, 50-445 Ak0 50-446 480 V. CONTAINMENT ELECTRICAL PENETRATION BACKUP PROTECTION SDAR:     CP-87-51 (SUPPLEMENTAL REPORT)
DOCKET NOS, 50-445 Ak0 50-446 480 V. CONTAINMENT ELECTRICAL PENETRATION BACKUP PROTECTION SDAR:
CP-87-51 (SUPPLEMENTAL REPORT)
Gentlemen:
Gentlemen:
On July 29, 1987, we verbally notified your Mr. H. S. Phillips of a deficiency involving backup protection for the 480V containment electrical penetrations, which we deemed to be reportable in our letter logged TXX-6710 dated September 2, 1987. Our final report was logged TXX-88278 dated March 10, 1988.             This is a supplemental report to revise the schedule for completion of corrective actions to resolve the deficiency.
On July 29, 1987, we verbally notified your Mr. H. S. Phillips of a deficiency involving backup protection for the 480V containment electrical penetrations, which we deemed to be reportable in our letter logged TXX-6710 dated September 2, 1987. Our final report was logged TXX-88278 dated March 10, 1988.
This is a supplemental report to revise the schedule for completion of corrective actions to resolve the deficiency.
The estimated corrpletion date for Unit I corrective actions (described in TXX-88072) has been revised to July 15, 1988, in support of hot functional testing. The Unit 2 corrective action completion schedule date has not changed.
The estimated corrpletion date for Unit I corrective actions (described in TXX-88072) has been revised to July 15, 1988, in support of hot functional testing. The Unit 2 corrective action completion schedule date has not changed.
Very truly yours, W. G. Counsil By:        %4' 4               4 R.' Dvhalker Manager, Nuclear Licensing WJH/amb c-Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3)
Very truly yours, W. G. Counsil
I p 8806140166 880601 DR                                     > neth ouve streer iaai cartas. reus mot ADOCK0500QS L-}}
%4' 4
4 By:
R.' Dvhalker Manager, Nuclear Licensing WJH/amb c-Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3)
I p
8806140166 880601 ADOCK0500QS DR
> neth ouve streer iaai cartas. reus mot L-}}

Latest revision as of 22:10, 10 December 2024

Supplemental Deficiency Rept CP-87-51 Re 480 Volt Containment Electrical Penetration Backup Protection. Initially Reported on 870729.Completion Date for Unit 1 Revised to 880715 & Unit 2 Completion Date Unchanged
ML20155C342
Person / Time
Site: Comanche Peak  
Issue date: 06/01/1988
From: Counsil W, Walker R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-87-51, TXX-88486, NUDOCS 8806140166
Download: ML20155C342 (1)


Text

.

9

-==

9 log # TXX-88486 1

File # 10110

~

~~

908.3 7UELECTR/C Ref. # 10CFR50.55(e)

Wmism G. Counsil Executow Y,cr Presder,a U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS, 50-445 Ak0 50-446 480 V. CONTAINMENT ELECTRICAL PENETRATION BACKUP PROTECTION SDAR:

CP-87-51 (SUPPLEMENTAL REPORT)

Gentlemen:

On July 29, 1987, we verbally notified your Mr. H. S. Phillips of a deficiency involving backup protection for the 480V containment electrical penetrations, which we deemed to be reportable in our letter logged TXX-6710 dated September 2, 1987. Our final report was logged TXX-88278 dated March 10, 1988.

This is a supplemental report to revise the schedule for completion of corrective actions to resolve the deficiency.

The estimated corrpletion date for Unit I corrective actions (described in TXX-88072) has been revised to July 15, 1988, in support of hot functional testing. The Unit 2 corrective action completion schedule date has not changed.

Very truly yours, W. G. Counsil

%4' 4

4 By:

R.' Dvhalker Manager, Nuclear Licensing WJH/amb c-Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3)

I p

8806140166 880601 ADOCK0500QS DR

> neth ouve streer iaai cartas. reus mot L-