ML20174A268: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[MN 20-002, June 3, 2020, Seabrook Annual Assessment Summary]]
| number = ML20174A268
| issue date = 06/22/2020
| title = June 3, 2020, Seabrook Annual Assessment Summary
| author name = Bickett B
| author affiliation = NRC/RGN-II/DRP/RPB3
| addressee name =
| addressee affiliation =
| docket = 05000443
| license number = NPF-086
| contact person =
| case reference number = 20200543, MN 20-002
| package number = ML20132A185
| document type = Meeting Summary
| page count = 2
}}
 
=Text=
{{#Wiki_filter:Meeting Summary UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406-2713 June 22, 2020 MEETING
 
==SUMMARY==
 
MN No: 20-002 LICENSEE:      NextEra Energy, Seabrook, LLC FACILITY:      Seabrook Station, Unit No. 1
 
==SUBJECT:==
 
==SUMMARY==
OF PUBLIC MEETING On June 3, 2020, at 5:30 p.m., the U.S. Nuclear Regulatory Commission (NRC) held a two-part public webinar to discuss the NRCs assessment of the safety performance at Seabrook Station for 2019. During the first part of the webinar, the NRC staff presented the agencys safety performance assessment at Seabrook for the period of January 1 through December 31, 2019, the NRCs role in ensuring safe plant operations, and the NRC actions in response to the national health emergency. The second part of the webinar provided members of the public with an opportunity to submit questions verbally or in writing on topics discussed during the first part of the webinar. Members of the public, State and local officials, elected officials or their staff, and members of the media participated in the meeting. Enclosure 1 is a list of those who participated in the webinar. The following NRC staff provided presentations during the webinar:
Dan Collins (Director, Division of Reactor Projects (DRP)), Brice Bickett (Chief, DRP), Paul Cataldo (Senior Resident Inspector, DRP), Brett Klukan (Regional Counsel), and Justin Poole (Project Manager, Nuclear Reactor Regulation).
Copies of the slides used by the NRC staff during the webinar can be accessed through ADAMS, Package Accession Number ML20132A185. A notice of the NRC meeting was issued on May 11, 2020, and was posted on the NRCs external (public) Web page (ADAMS Accession Number ML20132A189). ADAMS is accessible from the NRC Web page at:
http://www.nrc.gov/reading-rm/adams.html.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Seabrook Station can be found on the NRC's web site at:
https://www.nrc.gov/reactors/operating/oversight.html.
X    /RA/
Signed by: NRC-PIV Brice A. Bickett, Chief Projects Branch 3 Division of Reactor Projects
 
ML20174A268 Non-Sensitive                            Publicly Available SUNSI Review Sensitive                                Non-Publicly Available OFFICE        RI/DRP            RI/DRP NAME          PFinney          BBickett DATE          6/16/20          6/22/20}}

Latest revision as of 20:33, 10 December 2024