{{#Wiki_filter:**
{{#Wiki_filter:**
        ?
?
pTg     aver Va Pew Staten Shmngport PA150774004 70% ,%                                                                       mmms November 1, 1988 U. S.     Nuclear Regulatory Commission Attn:       Document Control Desk Washington, DC       20555
pTg aver Va Pew Staten Shmngport PA150774004 70%,%
mmms November 1, 1988 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555


==Reference:==
==Reference:==
Beaver Valley Power Station, Unit No. 1                                 ;
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Generic Letter 88-12 Response Gentlemen:
Docket No. 50-334, License No. DPR-66 Generic Letter 88-12 Response Gentlemen:
Operating License Chango Roquest No. 138 proposed removal of the fire protection requirements from the technical specifications in accordance with Generic Letter 86-10.
Operating License Chango Roquest No. 138 proposed removal of the fire     protection requirements from the technical specifications in accordance with Generic Letter 86-10. NRC review of this proposed change has boon on hold pending issuance of additional gonoric guidance.           Generic     Letter 88-12           (Removal of Fire Protection Requirements       from Technical Specifications)               has boon issued to provide that additional guidance.
NRC review of this proposed change has boon on hold pending issuance of additional gonoric guidance.
The   following provides our response to the issues addressed in                   !
Generic Letter 88-12 (Removal of Fire Protection Requirements from Technical Specifications) has boon issued to provide that additional guidance.
Generic       Letter 88-12 concerning Operating License Change Roquest No.                 I 138.       Attachment A includes revised technical specification pages
The following provides our response to the issues addressed in Generic Letter 88-12 concerning Operating License Change Roquest No.
,      updated       to   incorporate       amendments           issued since the original     ,
I 138.
:      submittal.       The proposed technical specification changes provided are               ,
Attachment A
identical to those provided in the original submittal. Attachmonts t
includes revised technical specification pages updated to incorporate amendments issued since the original submittal.
B,     C,   D and E     (Safety Analysis, No Significant Hazard Evaluation,               -
The proposed technical specification changes provided are identical to those provided in the original submittal.
;      UFSAR pages,       and Site Administrative Procedure (SAP) 9D) have boon
Attachmonts B,
;      revised to roflect the current submittal format and address the guidance       provided     in   Generic         Letter 88-12.       The additional requirements described in Generic Letter 88-12 are addressed in our original submittal,         therefore, no additional technical specification             !
C, D
changes are required. The following discussion providos cach Generic Letter 88-12 requirement along with our response:
and E
: 1. The   NRC     approved       Firo       Protection   Program   must be incorporated     into     the       FSAR     and   submitted with the certification required by 10 CFR 50.71(o) (2) , as requested by Generic Letter 86-10.                                                     ;
(Safety Analysis, No Significant Hazard Evaluation, t
l                     Resoonse:       Attachment D contains             the applicablo UFSAR     i l                     changes that wore incorporated in                 the latest updato in l                     accordance with 10 CPR 50.71(c) (2) .                                       ;
UFSAR
s:41oragCKee ee,,e,                                                             ,\
: pages, and Site Administrative Procedure (SAP) 9D) have boon revised to roflect the current submittal format and address the guidance provided in Generic Letter 88-12.
P           05000334                                                                ;
The additional requirements described in Generic Letter 88-12 are addressed in our original submittal, therefore, no additional technical specification changes are required.
The following discussion providos cach Generic Letter 88-12 requirement along with our response:
1.
The NRC approved Firo Protection Program must be incorporated into the FSAR and submitted with the certification required by 10 CFR 50.71(o) (2), as requested by Generic Letter 86-10.
l Resoonse:
Attachment D
contains the applicablo UFSAR i
l changes that wore incorporated in the latest updato in l
accordance with 10 CPR 50.71(c) (2).
s:41oragCKee ee,,e,
,\\
05000334 P
PDC
PDC


                                                                                                                    \
\\
  .        Benvor VallGy Pow 0r Station, Unit No. 1                                                               )
Benvor VallGy Pow 0r Station, Unit No. 1
Docket No. 50-334, License No. DPR-66                                                                   ,
)
Page 2                                                                                                 1
Docket No. 50-334, License No. DPR-66 Page 2 1
: 2. The   Limiting   Conditions   for   operation and   Surveillance Requirements associated with fire detection systems, fire suppression systems, fire barriers, and the administrative controls   that     address fire brigade staffing would be relocated from the TS. The existing administrative controls related to fire protection audits are to be retained in TS.
2.
Response:      The requirements for the abovo items have been incorporated into SAP-9D.           Fire Protection audits will continue to be required in accordance with Administrative Control 6.5.2.8. No change to this section is required.                                       i i
The Limiting Conditions for operation and Surveillance Requirements associated with fire detection systems, fire suppression
: 3. All   operational conditions,       remedial actions, and test requirements presently included in the TS for these systems, as well as the fire brigade staffing requirements, shall be incorporated into the Fire Protection Program. The remedial actions include shutdowns currently required by TS 3.0.3 when a LCo and its associated action requirements cannot be mot.
: systems, fire barriers, and the administrative controls that address fire brigade staffing would be relocated from the TS.
ResDongs:       The     requirement of specification 3.7.14.1 Action   b   for     applicability     to   the   provisions                       of specification     3.0.3   will     be   incorporated         into               the administrativo proceduros (SAP 9D) at the time of approval and issuance of this T.S. amendment. Attachment E contains the proposed marked-up change to SAP 9D Tablo 1 (page 21) as noted above.       All other operational conditions, remedial actions and test requirements presently included in the TS                                   '
The existing administrative controls related to fire protection audits are to be retained in TS.
for those systems have boon incorporated into SAP 9D.
 
: 4. The standard fire protection licenso condition in Generic Letter 86-10 must be included in the licenso. Any other i
===Response===
The requirements for the abovo items have been incorporated into SAP-9D.
Fire Protection audits will continue to be required in accordance with Administrative Control 6.5.2.8.
No change to this section is required.
i i
3.
All operational conditions, remedial
: actions, and test requirements presently included in the TS for these systems, as well as the fire brigade staffing requirements, shall be incorporated into the Fire Protection Program.
The remedial actions include shutdowns currently required by TS 3.0.3 when a
LCo and its associated action requirements cannot be mot.
ResDongs:
The requirement of specification 3.7.14.1 Action b
for applicability to the provisions of specification 3.0.3 will be incorporated into the administrativo proceduros (SAP 9D) at the time of approval and issuance of this T.S. amendment.
Attachment E contains the proposed marked-up change to SAP 9D Tablo 1 (page 21) as noted above.
All other operational conditions, remedial actions and test requirements presently included in the TS for those systems have boon incorporated into SAP 9D.
4.
The standard fire protection licenso condition in Generic Letter 86-10 must be included in the licenso.
Any other i
current fire protection license conditions shall be removed.
current fire protection license conditions shall be removed.
Rosconso:   The standard fire protection licenso condition is included in Attachment A and replaces the curront firo protection licenso condition 2.C. (5) . This licenso chango                                 l is   described in Attachmonts B and C. This is consistant                                   l with the original submittal.
Rosconso:
I S. The Administrativo Controls section of the TS shall bo augmented to support the Fire Protection Program. This                                       I shall be accomplished by additions to two specifications.                                   I First,   the Onsite Safety Committee           (OSC)   shall be given                       L responsibility for the review of the Fire Protection Program and implementing proceduros and the submittal of recommended changes to the offsite Review Committee (ORC). Second, Firo                                 l Protection Program implomontation shall be added to the list                                 j of   elements     for   which   written     proceduros shall bo                           ;
The standard fire protection licenso condition is included in Attachment A
established, implomonted, and maintained.                                                   !
and replaces the curront firo protection licenso condition 2.C. (5).
This licenso chango l
is described in Attachmonts B
and C.
This is consistant l
with the original submittal.
S.
The Administrativo Controls section of the TS shall bo I
augmented to support the Fire Protection Program.
This I
shall be accomplished by additions to two specifications.
I
: First, the Onsite Safety Committee (OSC) shall be given L
responsibility for the review of the Fire Protection Program and implementing proceduros and the submittal of recommended changes to the offsite Review Committee (ORC).
Second, Firo l
Protection Program implomontation shall be added to the list j
of elements for which written proceduros shall bo established, implomonted, and maintained.
[
[
t                                                                                                             _a
t a


,      Betver Vallcy Powar Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Page 3 Responsg:           Generic Letter 88-12 provides marked pages of the Westinghouse           Standard Technical Specifications (STS)                       to serve as a model for the changes to the administrative controls.           However,     it also allows                   for plants technical specifications that differ from the STS by stating that additions           to the administrative controls for the Fire Protection Program should be proposed that are consistent with the administrative controls for the Emergency and Security Plans. The current administrative controls for our Fire Protection Program, Emergency, and Security Plans are:
Betver Vallcy Powar Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Page 3 Responsg:
: 1)   Specification 6.5.1.6, the OSC is responsible for the review of all procedures required by specification 6.8 and changes of intent thereto.
Generic Letter 88-12 provides marked pages of the Westinghouse Standard Technical Specifications (STS) to serve as a
: 2)   Specification             6.8.1,   written                 procedures shall be established,             implemented           and         maintained covoring:
model for the changes to the administrative controls.
item d.             Security Plan, item e.                   Emergency Plans, and item f.         Fire Protection Program.
: However, it also allows for plants technical specifications that differ from the STS by stating that additions to the administrative controls for the Fire Protection Program should be proposed that are consistent with the administrative controls for the Emergency and Security Plans.
: 3)   Specification             6.5.2.8,     audits               of   the   following activities shall be performed under the cognizance of the         ORC:     item o.       Facility Emergency Plar and implementing procedures,               item f.                 Facility Security Plan and implomonting procedures,                               item h. Facility Fire Protection Program and implementing proceduros.
The current administrative controls for our Fire Protection Program, Emergency, and Security Plans are:
The administrativo controls for the Fire Protection Program are consistent with the administrative controls for the Security Plan and Emergency Plan,                                 and are thorofore consistent with the requirements of Generic Letter 88-12.
1)
In ad31 tion     to the above,             for License Condition 2.C.5 (Firo Protectio:.     Program),         DLC   understands the phrano "implomont and maintain in offect               all   provisions   of the approved firo protection program" to mean that all provisions of the approved fire protection program which (1) portain to NRC requirements, or (2) affect plant safoty or the ability to achiovo and maintain safe shutdown in the ovant of a firo, are required to bo implomonted and maintained.
Specification 6.5.1.6, the OSC is responsible for the review of all procedures required by specification 6.8 and changes of intent thereto.
The reasons for which DLC has                     established                 a fire protection program for BVPS-1 are as follows:
2)
Specification 6.8.1, written procedures shall be established, implemented and maintained covoring:
item d.
Security Plan, item e.
Emergency Plans, and item f.
Fire Protection Program.
3)
Specification 6.5.2.8, audits of the following activities shall be performed under the cognizance of the ORC:
item o.
Facility Emergency Plar and implementing procedures, item f.
Facility Security Plan and implomonting procedures, item h.
Facility Fire Protection Program and implementing proceduros.
The administrativo controls for the Fire Protection Program are consistent with the administrative controls for the Security Plan and Emergency
: Plan, and are thorofore consistent with the requirements of Generic Letter 88-12.
In ad31 tion to the
: above, for License Condition 2.C.5 (Firo Protectio:.
Program),
DLC understands the phrano "implomont and maintain in offect all provisions of the approved firo protection program" to mean that all provisions of the approved fire protection program which (1) portain to NRC requirements, or (2) affect plant safoty or the ability to achiovo and maintain safe shutdown in the ovant of a firo, are required to bo implomonted and maintained.
The reasons for which DLC has established a fire protection program for BVPS-1 are as follows:
NRC regulations Insuranco company guidolinos Industry codes and standards DLC standard practicos Protection of DLC's capital investment
NRC regulations Insuranco company guidolinos Industry codes and standards DLC standard practicos Protection of DLC's capital investment


                                              . .                                                                                                    i Beaver VallCy Pow 3r Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Page 4 As a result, many of the provisions of the fire protection program may not coincide with areas which affect the NRC's review or plant
i Beaver VallCy Pow 3r Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Page 4 As a
    <                                                  safety.                         However, DLC believes that it is beneficial       from the standpoints of consistency, efficiency, and effectiveness to include all provisions related to fire protection into one integrated program vs. separate programs,                                                                       j The                     proposed amendment would remove the fire protection requirements from the BV-1 technical specifications based on the guidance' provided in Generic Letters 88-12 and 86-10, and would be consistent with our present program at Unit 2.                           If there are any questions, please contact m'f staff.
: result, many of the provisions of the fire protection program may not coincide with areas which affect the NRC's review or plant safety.
Very truly yours,             j L
: However, DLC believes that it is beneficial from the standpoints of consistency, efficiency, and effectiveness to include all provisions related to fire protection into one integrated program vs. separate programs, j
h17
The proposed amendment would remove the fire protection requirements from the BV-1 technical specifications based on the guidance' provided in Generic Letters 88-12 and 86-10, and would be consistent with our present program at Unit 2.
                                                                                                                        . D. Sieber _ _ _           >
If there are any questions, please contact m'f staff.
Vice President Nuclear Group Attachment cc:     Mr. J. Beall, Sr. Reuident Inspector
Very truly yours, j
+                                                             Mr. W. T. Russell, NRC Region I Administrator
L h17 D.
:                                                              Mr. P. Tam, Project Manager
Sieber _ _ _
:                                                              Director, Safety Evaluation & Control (VEPCO)
Vice President Nuclear Group Attachment cc:
;                                                                                                                                                    L 1                                                                                                                                                   i e
Mr. J.
l 4                                                                                                                                                   l i
Beall, Sr. Reuident Inspector
+
Mr. W. T. Russell, NRC Region I Administrator Mr.
P. Tam, Project Manager Director, Safety Evaluation & Control (VEPCO)
L 1
i e
l 4
l i
i f
i f
                                            . mr,-w,-w     -  ny.~w                 -
.w mr,-w,-w ny.~w nn~----~--s y}}
y}}

Latest revision as of 18:57, 10 December 2024

Forwards Response to Issues Addressed in Generic Ltr 88-12 Re OL Change Request 138.Attachment a Includes Revised Tech Spec Pages Updated to Incorporate Amends Issued Since Original Submittal
ML20195E189
Person / Time
Site: Beaver Valley
Issue date: 11/01/1988
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20195E194 List:
References
GL-88-12, NUDOCS 8811070288
Download: ML20195E189 (4)


Text

?

pTg aver Va Pew Staten Shmngport PA150774004 70%,%

mmms November 1, 1988 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Generic Letter 88-12 Response Gentlemen:

Operating License Chango Roquest No. 138 proposed removal of the fire protection requirements from the technical specifications in accordance with Generic Letter 86-10.

NRC review of this proposed change has boon on hold pending issuance of additional gonoric guidance.

Generic Letter 88-12 (Removal of Fire Protection Requirements from Technical Specifications) has boon issued to provide that additional guidance.

The following provides our response to the issues addressed in Generic Letter 88-12 concerning Operating License Change Roquest No.

I 138.

Attachment A

includes revised technical specification pages updated to incorporate amendments issued since the original submittal.

The proposed technical specification changes provided are identical to those provided in the original submittal.

Attachmonts B,

C, D

and E

(Safety Analysis, No Significant Hazard Evaluation, t

UFSAR

pages, and Site Administrative Procedure (SAP) 9D) have boon revised to roflect the current submittal format and address the guidance provided in Generic Letter 88-12.

The additional requirements described in Generic Letter 88-12 are addressed in our original submittal, therefore, no additional technical specification changes are required.

The following discussion providos cach Generic Letter 88-12 requirement along with our response:

1.

The NRC approved Firo Protection Program must be incorporated into the FSAR and submitted with the certification required by 10 CFR 50.71(o) (2), as requested by Generic Letter 86-10.

l Resoonse:

Attachment D

contains the applicablo UFSAR i

l changes that wore incorporated in the latest updato in l

accordance with 10 CPR 50.71(c) (2).

s:41oragCKee ee,,e,

,\\

05000334 P

PDC

\\

Benvor VallGy Pow 0r Station, Unit No. 1

)

Docket No. 50-334, License No. DPR-66 Page 2 1

2.

The Limiting Conditions for operation and Surveillance Requirements associated with fire detection systems, fire suppression

systems, fire barriers, and the administrative controls that address fire brigade staffing would be relocated from the TS.

The existing administrative controls related to fire protection audits are to be retained in TS.

Response

The requirements for the abovo items have been incorporated into SAP-9D.

Fire Protection audits will continue to be required in accordance with Administrative Control 6.5.2.8.

No change to this section is required.

i i

3.

All operational conditions, remedial

actions, and test requirements presently included in the TS for these systems, as well as the fire brigade staffing requirements, shall be incorporated into the Fire Protection Program.

The remedial actions include shutdowns currently required by TS 3.0.3 when a

LCo and its associated action requirements cannot be mot.

ResDongs:

The requirement of specification 3.7.14.1 Action b

for applicability to the provisions of specification 3.0.3 will be incorporated into the administrativo proceduros (SAP 9D) at the time of approval and issuance of this T.S. amendment.

Attachment E contains the proposed marked-up change to SAP 9D Tablo 1 (page 21) as noted above.

All other operational conditions, remedial actions and test requirements presently included in the TS for those systems have boon incorporated into SAP 9D.

4.

The standard fire protection licenso condition in Generic Letter 86-10 must be included in the licenso.

Any other i

current fire protection license conditions shall be removed.

Rosconso:

The standard fire protection licenso condition is included in Attachment A

and replaces the curront firo protection licenso condition 2.C. (5).

This licenso chango l

is described in Attachmonts B

and C.

This is consistant l

with the original submittal.

S.

The Administrativo Controls section of the TS shall bo I

augmented to support the Fire Protection Program.

This I

shall be accomplished by additions to two specifications.

I

First, the Onsite Safety Committee (OSC) shall be given L

responsibility for the review of the Fire Protection Program and implementing proceduros and the submittal of recommended changes to the offsite Review Committee (ORC).

Second, Firo l

Protection Program implomontation shall be added to the list j

of elements for which written proceduros shall bo established, implomonted, and maintained.

[

t a

Betver Vallcy Powar Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Page 3 Responsg:

Generic Letter 88-12 provides marked pages of the Westinghouse Standard Technical Specifications (STS) to serve as a

model for the changes to the administrative controls.

However, it also allows for plants technical specifications that differ from the STS by stating that additions to the administrative controls for the Fire Protection Program should be proposed that are consistent with the administrative controls for the Emergency and Security Plans.

The current administrative controls for our Fire Protection Program, Emergency, and Security Plans are:

1)

Specification 6.5.1.6, the OSC is responsible for the review of all procedures required by specification 6.8 and changes of intent thereto.

2)

Specification 6.8.1, written procedures shall be established, implemented and maintained covoring:

item d.

Security Plan, item e.

Emergency Plans, and item f.

Fire Protection Program.

3)

Specification 6.5.2.8, audits of the following activities shall be performed under the cognizance of the ORC:

item o.

Facility Emergency Plar and implementing procedures, item f.

Facility Security Plan and implomonting procedures, item h.

Facility Fire Protection Program and implementing proceduros.

The administrativo controls for the Fire Protection Program are consistent with the administrative controls for the Security Plan and Emergency

Plan, and are thorofore consistent with the requirements of Generic Letter 88-12.

In ad31 tion to the

above, for License Condition 2.C.5 (Firo Protectio:.

Program),

DLC understands the phrano "implomont and maintain in offect all provisions of the approved firo protection program" to mean that all provisions of the approved fire protection program which (1) portain to NRC requirements, or (2) affect plant safoty or the ability to achiovo and maintain safe shutdown in the ovant of a firo, are required to bo implomonted and maintained.

The reasons for which DLC has established a fire protection program for BVPS-1 are as follows:

NRC regulations Insuranco company guidolinos Industry codes and standards DLC standard practicos Protection of DLC's capital investment

i Beaver VallCy Pow 3r Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Page 4 As a

result, many of the provisions of the fire protection program may not coincide with areas which affect the NRC's review or plant safety.
However, DLC believes that it is beneficial from the standpoints of consistency, efficiency, and effectiveness to include all provisions related to fire protection into one integrated program vs. separate programs, j

The proposed amendment would remove the fire protection requirements from the BV-1 technical specifications based on the guidance' provided in Generic Letters 88-12 and 86-10, and would be consistent with our present program at Unit 2.

If there are any questions, please contact m'f staff.

Very truly yours, j

L h17 D.

Sieber _ _ _

Vice President Nuclear Group Attachment cc:

Mr. J.

Beall, Sr. Reuident Inspector

+

Mr. W. T. Russell, NRC Region I Administrator Mr.

P. Tam, Project Manager Director, Safety Evaluation & Control (VEPCO)

L 1

i e

l 4

l i

i f

.w mr,-w,-w ny.~w nn~----~--s y