TXX-6045, Interim Deficiency Rept CP-84-12 Re Impact of High Energy Line Break Temp on Qualified Equipment Outside Containment. Initially Reported on 840604.Comparison of Cable Temp to Existing Qualified Temps Unresolved.Next Rept by 861219: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- - _ _ _ _ | {{#Wiki_filter:- - _ _ _ _ | ||
DALLAS-SLIC | DALLAS-SLIC TEL No. | ||
Log # TXX-6045 File # 10110 | 214 979 8700 Oct 21.86 17:22 P.02 Log # TXX-6045 5 | ||
File # 10110 903.11 TEXAS UTILITIES GENERATING COMPANY | |||
.. Av =-.... wo m ouv= ===....I | |||
* DAh.AS. HMAS MS.1 October 21, 1986 WILLIAM G COUN$1b titewtivt vict ref eiet=7 Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects | * DAh.AS. HMAS MS.1 October 21, 1986 WILLIAM G COUN$1b titewtivt vict ref eiet=7 Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects LU iL-M U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 28: | Line 28: | ||
==Dear Mr. Johnson:== | ==Dear Mr. Johnson:== | ||
On June 4,1984, we verbally notified your Mr. D. Hunnicutt of a deficiency involving the environmental qualification of equipment outside containment for high energy line breaks (HELB). This is an interim report of a potentially reportable item under provisions of 10CFR50.55(e). Our most recent interim rsport was logged TXX-5029, dated September 19, 1986. | On June 4,1984, we verbally notified your Mr. D. Hunnicutt of a deficiency involving the environmental qualification of equipment outside containment for high energy line breaks (HELB). This is an interim report of a potentially reportable item under provisions of 10CFR50.55(e). Our most recent interim rsport was logged TXX-5029, dated September 19, 1986. | ||
The remaining qualification issue yet to be resolved is a comparison of the cable temperatures in the area of concern to the existing established qualified temperatures. After identifying cable types and locations, a thermal transient analysis will be performed to determine the temperatures to which the outer cable layer is exposed. These temperatures will be used to i | The remaining qualification issue yet to be resolved is a comparison of the cable temperatures in the area of concern to the existing established qualified temperatures. After identifying cable types and locations, a thermal transient analysis will be performed to determine the temperatures to which the outer cable layer is exposed. These temperatures will be used to i | ||
determine if the ambient temperature will exceed the cables' qualified environmental temperature. | |||
Current project scheduling indicates our evaluation will be completed %y i | |||
December 1, 1986. | |||
l l | l l | ||
l i | l i | ||
e 8610280365 861021 | e 8610280365 861021 | ||
{DR ADOCK 05000445 PDR | |||
~( | |||
A orvssson or sxxas ununsa vs ncsnic couraus | |||
DALLAS-SLIC | DALLAS-SLIC TEL No. | ||
214 979 8700 Oct 21,86 17:22 P.03 TXX-6045 October 21, 1986 Page 2 We are continuing our evaluation of this issue and anticipate submitting our next report by December 19, 1986. | |||
Very ruly yours, isd[ | Very ruly yours, isd[ | ||
W. G. Cou sil By: | W. G. Cou sil By: | ||
G. 3. Keeley | Gj) | ||
Manager, NucleaT T.K. s ng i | G. 3. Keeley Manager, NucleaT T.K. s ng i | ||
JCH/gj c - NRC Region IV (0 + 1 copy) | JCH/gj c - NRC Region IV (0 + 1 copy) | ||
Director, Inspection & Enforcement (15 copies) | Director, Inspection & Enforcement (15 copies) | ||
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 I | U. S. Nuclear Regulatory Commission Washington, D.C. | ||
20555 I | |||
l 6 | l 6 | ||
,---..v--- | |||
r-------------- | |||
= - - - - - - ' - - - * ~ ' ~ - ' - ' * * | |||
* - ~ - - ~ - ' - - - " | |||
' - '}} | |||
Latest revision as of 16:13, 10 December 2024
| ML20197B333 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/21/1986 |
| From: | Counsil W, Keeley G, Kelley G TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-84-12, TXX-6045, NUDOCS 8610280365 | |
| Download: ML20197B333 (2) | |
Text
- - _ _ _ _
DALLAS-SLIC TEL No.
214 979 8700 Oct 21.86 17:22 P.02 Log # TXX-6045 5
File # 10110 903.11 TEXAS UTILITIES GENERATING COMPANY
.. Av =-.... wo m ouv= ===....I
- DAh.AS. HMAS MS.1 October 21, 1986 WILLIAM G COUN$1b titewtivt vict ref eiet=7 Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects LU iL-M U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 IMPACT OF HELB TEMPERATURES ON QUALIFIED EQUIPMENT OUTSIDE CONTAINMENT SDAR: CP-84-12 (INTERIM REPORT)
Dear Mr. Johnson:
On June 4,1984, we verbally notified your Mr. D. Hunnicutt of a deficiency involving the environmental qualification of equipment outside containment for high energy line breaks (HELB). This is an interim report of a potentially reportable item under provisions of 10CFR50.55(e). Our most recent interim rsport was logged TXX-5029, dated September 19, 1986.
The remaining qualification issue yet to be resolved is a comparison of the cable temperatures in the area of concern to the existing established qualified temperatures. After identifying cable types and locations, a thermal transient analysis will be performed to determine the temperatures to which the outer cable layer is exposed. These temperatures will be used to i
determine if the ambient temperature will exceed the cables' qualified environmental temperature.
Current project scheduling indicates our evaluation will be completed %y i
December 1, 1986.
l l
l i
e 8610280365 861021
{DR ADOCK 05000445 PDR
~(
A orvssson or sxxas ununsa vs ncsnic couraus
DALLAS-SLIC TEL No.
214 979 8700 Oct 21,86 17:22 P.03 TXX-6045 October 21, 1986 Page 2 We are continuing our evaluation of this issue and anticipate submitting our next report by December 19, 1986.
Very ruly yours, isd[
W. G. Cou sil By:
Gj)
G. 3. Keeley Manager, NucleaT T.K. s ng i
JCH/gj c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 I
l 6
,---..v---
r--------------
= - - - - - - ' - - - * ~ ' ~ - ' - ' * *
- - ~ - - ~ - ' - - - "
' - '