HEMORANDUM FOR:       James H. Taylor                                         ...
HEMORANDUM FOR:
Executive Olrector for Operations                   7,y FROM:                 Robert H. Bernero, Director Ofrice of Nuclear Material Safety and Safeguards
James H. Taylor Executive Olrector for Operations 7,y FROM:
Robert H. Bernero, Director Ofrice of Nuclear Material Safety and Safeguards


==SUBJECT:==
==SUBJECT:==
COMPLETION Of ITEM 3.8 TO GENERAL ELECTRIC (GE) staff ACTION PLAN, RESPONSE 10 INVESTIGATION Of THE MAY 29, 1991, INCIDENT
COMPLETION Of ITEM 3.8 TO GENERAL ELECTRIC (GE) staff ACTION PLAN, RESPONSE 10 INVESTIGATION Of THE MAY 29, 1991, INCIDENT AT THE GE NUCLEAR FUL AND COMPONENT MANUFACTURING FACILITY (NUREG-1450)
* AT THE GE NUCLEAR FUL AND COMPONENT MANUFACTURING FACILITY (NUREG-1450)                                                             .
Item 3.8 of the GE Staff Action Plan required:
Item 3.8 of the GE Staff Action Plan required:               (1) the Office of Nuclear Haterial Safety and Safeguards (NMSS) and Region 11 to reevaluate the adequacy of the GE Radiological Contingency and Emergency Plan (RCEP) rcgarding emergency planning, event classification, and notifications; (2) Region 11 to reevaluate the adequacy of the RCEP implementing procedures; and (3) NMSS and Region 11 to ensure the RCEP and implementing procedures are revised as necessary. As detailed in the enclosure, HMSS and Region 11 have completed this task.
(1) the Office of Nuclear Haterial Safety and Safeguards (NMSS) and Region 11 to reevaluate the adequacy of the GE Radiological Contingency and Emergency Plan (RCEP) rcgarding emergency planning, event classification, and notifications; (2) Region 11 to reevaluate the adequacy of the RCEP implementing procedures; and (3) NMSS and Region 11 to ensure the RCEP and implementing procedures are revised as necessary. As detailed in the enclosure, HMSS and Region 11 have completed this task.
Yhe   contacts for item 3.B. are Ed flagk               2401) and Jim Kreh (404 331-5569).                                 "s U("504,OWUY L
Yhe contacts for item 3.B. are Ed flagk ("504,OWUY 2401) and Jim Kreh (404 331-5569).
                                                  ,      Guy A.Mcdo
"s U L Guy A.Mcdo
                                                  ~
~
VpRobert M. Bernero, Director Office of Nuclear Material Safety                   g 1                                                       and Safeguards                                     \
VpRobert M. Bernero, Director Office of Nuclear Material Safety g
    '                                              \
1 and Safeguards
inclosure: As stated                                                                         p cc:   E. Jorcar., AE00                                                                   #
\\
S. Ebneter, Ril
\\
_0FC       IMUf:       C         IMUFA'       N       lh0f; -   /3     Region 11     E uAME       EFYack:mh               VTh[r'pe:             MIo"kar:         # Y Cki Y M
inclosure: As stated p
            ,21E         II/!!]92               11/[/92               11/2'/792     _
cc:
11/r4/92 EC         lh5[               DD:1W/S:               D:IMNS:     J     DD:fMSS:
E. Jorcar., AE00 S. Ebneter, Ril
NAME        Ifckey:                 Gkeves:           hdun61khhd:           dddht'o:
_0FC IMUf:
DATE         ll/djl92             ll/D/92               If/ty/92             lh1/92 R'         D:NES':
C IMUFA' N
                      ,RB'ekero:
lh0f; - /3 Region 11 E
uAME EFYack:mh VTh[r'pe:
MIo"kar:
# Y Cki Y M
,21E II/!!]92 11/[/92 11/2'/792 11/r4/92 EC lh5[
DD:1W/S:
D:IMNS:
J DD:fMSS:
Ifckey:
Gkeves:
hdun61khhd:
dddht'o:
NAME DATE ll/djl92 ll/D/92 If/ty/92 lh1/92 R'
D:NES':
NAME
NAME
_pME       'ljd/92 G:\NMSS91-5 C = COVER E = COVER & ENCLOSURE N = UL[El b d O f t '[.                                                     h 9212040386 921202
,RB'ekero:
_pME
'ljd/92 G:\\NMSS91-5 C = COVER E = COVER & ENCLOSURE N = UL[El b d O f t '[.
h 9212040386 921202
{DR ADOCK0700g3
{DR ADOCK0700g3


S f
S f
                                        ..                      Evo DIS 1RIBUT10111 NHSS 9100502 W/ enc 1 & w/ incoming WITS 91000196
Evo DIS 1RIBUT10111 NHSS 9100502 W/ enc 1 & w/ incoming WITS 91000196
          ' Docket 70-1113;u i       \; PDR i
' Docket 70-1113;u i
        \NRC File Center :
\\; PDR i
\\NRC File Center :
IMUF R/F IMSB R/F NMSS R/F lHNS Central File CEstep Viharl)o (I)
IMUF R/F IMSB R/F NMSS R/F lHNS Central File CEstep Viharl)o (I)
EFlacc Region 11 Giroup, Ril WCline, Ril JXreh, Ril WBrown NMSS Off. R/F JGreeves CJenkins f'&n A LJacobs-Baynard MTokar
EFlacc Region 11 Giroup, Ril WCline, Ril JXreh, Ril WBrown NMSS Off. R/F JGreeves CJenkins f'&n A LJacobs-Baynard MTokar


4                                                                                                                                           .
4 l
l ENCLOSURE I                                                       DESCRIPTION OF STAFF ACTIONS PLANNED IN RESPONSE TO THE INVESTIGATION OF THE MAY 29, 1991, INCIDENT AT THE GENERAL ELECTRIC NUCLEAR                                                       ,
ENCLOSURE I
i                                                      FUEL AND COMPONENT FACILITY t
DESCRIPTION OF STAFF ACTIONS PLANNED IN RESPONSE TO THE INVESTIGATION OF THE MAY 29, 1991, INCIDENT AT THE GENERAL ELECTRIC NUCLEAR i
FUEL AND COMPONENT FACILITY
(
(


==Reference:==
==Reference:==
NVREG-1450) i                 ITEM 3.B
NVREG-1450) t i
!                Reevaluate the adequacy of the GE fuels facility RCEP and implementing i                 procedures regarding emergency planning, event classification, and notifications. Ensure the RCEP and implementing procedures are reviced as
ITEM 3.B Reevaluate the adequacy of the GE fuels facility RCEP and implementing i
,                necesssry.
procedures regarding emergency planning, event classification, and notifications.
Ensure the RCEP and implementing procedures are reviced as necesssry.
ACTIOP ILM NMSS and Region 11 will reevaluate the adequacy of the GE fuels facility RCEP regarding emergency planning, event classification, and notifications.
ACTIOP ILM NMSS and Region 11 will reevaluate the adequacy of the GE fuels facility RCEP regarding emergency planning, event classification, and notifications.
,                Region 11 will reevaluate the adequacy of the GE fuel facility implementing
Region 11 will reevaluate the adequacy of the GE fuel facility implementing procedures. NMSS and Re'jion 11 will ensure the RCEP and implementing procedures are revised as necessary.
;                procedures. NMSS and Re'jion 11 will ensure the RCEP and implementing
4 STATUS By letter datea January 17, 1992, GE submitted an amendment application dated December 28, 1991, to update its Radiological Contingency and Emergency Plan (RCEP).
;                procedures are revised as necessary.
From January to September 1992, several draft applications were 4
4 STATUS By letter datea January 17, 1992, GE submitted an amendment application dated
i submitted, and several meetings an-i ielephone conference calls were held j
.                December 28, 1991, to update its Radiological Contingency and Emergency Plan 4
between GE, Region 11, and the Office of Nuclear Material Safety and 1
(RCEP). From January to September 1992, several draft applications were i                 submitted, and several meetings an-i ielephone conference calls were held j                 between GE, Region 11, and the Office of Nuclear Material Safety and 1
Safeguards (NMSS) staff. On October 2, 1992, GE resubmitted the' amendment application to incorporate all changes agreed to by GE, Region 11, and NMSS staff..The October 2,1992, submittal replaced the January 17, 1992, submittal in its entirety, and an October 26, 1992, submittal supplemented the j
Safeguards (NMSS) staff. On October 2, 1992, GE resubmitted the' amendment application to incorporate all changes agreed to by GE, Region 11, and NMSS staff. .The October 2,1992, submittal replaced the January 17, 1992, submittal in its entirety, and an October 26, 1992, submittal supplemented the j                 October 2, 1992, submittal.
October 2, 1992, submittal.
i Sections of the RCEP where significant revisions were made as a result of the October 2 and October 26 submittals include:
Sections of the RCEP where significant revisions were made as a result of the i
Chapter 3, " Classes. of Radiological / Emergency Conditions." The classification system was revised to conform with Regulatory Guide 3.67,
October 2 and October 26 submittals include:
: 3.                      Standard format and Content for Emergency Plans for fuel Cycle and                                                     ;
Chapter 3, " Classes. of Radiological / Emergency Conditions." The classification system was revised to conform with Regulatory Guide 3.67, Standard format and Content for Emergency Plans for fuel Cycle and 3.
Materials facilities. Changes included adding several tables with-
Materials facilities.
                      . flowcharts for classifying emergencies and adding _ a chart to facilitate classifying incidents in a timely manner.
Changes included adding several tables with-
..                                                                                                                                            l l
. flowcharts for classifying emergencies and adding _ a chart to facilitate classifying incidents in a timely manner.
i
l i


i e
i e
    *    =
=
~
~
1 3
1 3
J i
J i
i                   Chapter 4, "Organtzational Control of Emergencies and/or _ Radiological
i Chapter 4, "Organtzational Control of Emergencies and/or _ Radiological Contingencies." Notification requirements to NRC and local agencies were updated.
;                    Contingencies." Notification requirements to NRC and local agencies were
4 Chapter 7, " Radiological & Emergency Preparedness Capability." Training requirements of HAZCOM and radiation protection were added.
;                    updated.
Initial and periodic traintng requirteents for the emergency organization members were more clearly described. Training with offsite support agencies and local and state goverinnent agencies was added.-
4
On October 29, 1992, License Amendment No.-27 was issued to GE authorizing the changes to the RCEP in the October 2 and October 26, 1992, submittals.
:                    Chapter 7, " Radiological & Emergency Preparedness Capability." Training
A routine inspection in October 1992 included evaluation of the annual emergency response exercfsa and detailed review of the RCEP implementing procedures..No exercise weaknesses or program deficiencies were-identified.
.                    requirements of HAZCOM and radiation protection were added. Initial and
An aren for improvement with. respect to the RCEP implementing procedures was the prioritization of procedural steps and the elimination of numerous redundancies.
,                    periodic traintng requirteents for the emergency organization members were more clearly described. Training with offsite support agencies and local and state goverinnent agencies was added.-                                     l On October 29, 1992, License Amendment No.-27 was issued to GE authorizing the changes to the RCEP in the October 2 and October 26, 1992, submittals.
Licensee management agreed to appropriately address this improvement item, which will be tracked by Region 11 to ensure resolution.
A routine inspection in October 1992 included evaluation of the annual emergency response exercfsa and detailed review of the RCEP implementing procedures. .No exercise weaknesses or program deficiencies were-identified.
An aren for improvement with. respect to the RCEP implementing procedures was the prioritization of procedural steps and the elimination of numerous redundancies.                       Licensee management agreed to appropriately address this improvement item, which will be tracked by Region 11 to ensure resolution.
i i
i i
PRIORITY:                                     1 RESOURCES;                                   0.2 FTE (NMSS)
PRIORITY:
;          STATUS:                                     Closed COMPLETION DATE:. 10/29/92 l
1 RESOURCES; 0.2 FTE (NMSS)
CONTACTS:                                   NMSS-Hickey l                                                       RII-Collins l-t i
STATUS:
Closed COMPLETION DATE:. 10/29/92 l
CONTACTS:
NMSS-Hickey l
RII-Collins l-t i


e
e
      .,y,;vf M
.,y,;vf M
* y{, .             ...~. v.,
* y{,.
      *TyQ'5k'$,.,
... ~.
t' *t .         g     *W* ya ;;; .
v.,
*TyQ'5k'$,.,
t' *t.
g
*W* ya ;;;.
T;ctet
T;ctet
                              ., ya. <
., ya. <
DATE RECEIVEDc ~,                  /,91..OR I G I N AL DUE D1: 4 % 2''     /2 COtJTh0L NO: v i vv y..
DATE RECEIVED
                      ,s                 .c:~ i" . D I V I S I ON   CATE: OY/23/92       DOC DT   v//OS/91 FROM:       M '*l , ,, , 7 Z#'
/,91..OR I G I N AL DUE D1:
* TIME:               COMP DT Berneco NMSS TO:
4 % 2''
Taylor FOR SIGNATURE OF                               $t SFEC     4*.               SECY NO:
/2 COtJTh0L NO: v i vv y..
ASSIGNED TO:                       CONTACT:
c ~,
1MNS                               Hauqhney DESC:                                                                         ROUTING:
,s
STAFF ACTION PLAN RESPONDING TO INVESTIGATION OF                               Bernero THE 5/29/91 INCIDENT AT GE WILMINGTON - ADEOUACY                               Arlotto OF EMERGENCY PREPAREDNESS - F EEVAl.UATE ACEDUACY OF                           Brown GE'S RADIOLOGICAL CONTINCEfL/ *11D EMoiRtiENC/ FLAN                           Jacobs-Baynard
.c:~ i". D I V I S I ON CATE: OY/23/92 DOC DT v//OS/91 FROM:
          'FCEP).                                                                       Jent ins SPECIAL INSTRUCTIONS OR RE_t%s 5:
M '*l,,,, 7 Z#'
:e!1E AS EDO WI TS NUMDER 91 - 1 's L.m to NMSS - 9/2?./72 Due to E00 - 9/20/92 sf4 2 .'   s.
* TIME:
                              .P, s.
COMP DT Berneco NMSS TO:
Taylor FOR SIGNATURE OF
$t SFEC 4*.
SECY NO:
ASSIGNED TO:
CONTACT:
1MNS Hauqhney DESC:
ROUTING:
STAFF ACTION PLAN RESPONDING TO INVESTIGATION OF Bernero THE 5/29/91 INCIDENT AT GE WILMINGTON - ADEOUACY Arlotto OF EMERGENCY PREPAREDNESS - F EEVAl.UATE ACEDUACY OF Brown GE'S RADIOLOGICAL CONTINCEfL/ *11D EMoiRtiENC/ FLAN Jacobs-Baynard
'FCEP).
Jent ins SPECIAL INSTRUCTIONS OR RE_t%s 5:
:e!1E AS EDO WI TS NUMDER 91 - 1 's L.m to NMSS - 9/2?./72 Due to E00
- 9/20/92 sf4 2.'
s.
.P, s.
_}}
_}}

Revision as of 11:30, 10 December 2024

Forwards Description of Staff Actions Planned in Response to Investigation of 910529 Incident at GE Fuel & Component Facility
ML20198E282
Person / Time
Site: 07001113
Issue date: 12/02/1992
From: Bernero R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20198D052 List:
References
RTR-NUREG-1450 NUDOCS 9212040386
Download: ML20198E282 (5)


Text

'

HEMORANDUM FOR:

James H. Taylor Executive Olrector for Operations 7,y FROM:

Robert H. Bernero, Director Ofrice of Nuclear Material Safety and Safeguards

SUBJECT:

COMPLETION Of ITEM 3.8 TO GENERAL ELECTRIC (GE) staff ACTION PLAN, RESPONSE 10 INVESTIGATION Of THE MAY 29, 1991, INCIDENT AT THE GE NUCLEAR FUL AND COMPONENT MANUFACTURING FACILITY (NUREG-1450)

Item 3.8 of the GE Staff Action Plan required:

(1) the Office of Nuclear Haterial Safety and Safeguards (NMSS) and Region 11 to reevaluate the adequacy of the GE Radiological Contingency and Emergency Plan (RCEP) rcgarding emergency planning, event classification, and notifications; (2) Region 11 to reevaluate the adequacy of the RCEP implementing procedures; and (3) NMSS and Region 11 to ensure the RCEP and implementing procedures are revised as necessary. As detailed in the enclosure, HMSS and Region 11 have completed this task.

Yhe contacts for item 3.B. are Ed flagk ("504,OWUY 2401) and Jim Kreh (404 331-5569).

"s U L Guy A.Mcdo

~

VpRobert M. Bernero, Director Office of Nuclear Material Safety g

1 and Safeguards

\\

\\

inclosure: As stated p

cc:

E. Jorcar., AE00 S. Ebneter, Ril

_0FC IMUf:

C IMUFA' N

lh0f; - /3 Region 11 E

uAME EFYack:mh VTh[r'pe:

MIo"kar:

  1. Y Cki Y M

,21E II/!!]92 11/[/92 11/2'/792 11/r4/92 EC lh5[

DD:1W/S:

D:IMNS:

J DD:fMSS:

Ifckey:

Gkeves:

hdun61khhd:

dddht'o:

NAME DATE ll/djl92 ll/D/92 If/ty/92 lh1/92 R'

D:NES':

NAME

,RB'ekero:

_pME

'ljd/92 G:\\NMSS91-5 C = COVER E = COVER & ENCLOSURE N = UL[El b d O f t '[.

h 9212040386 921202

{DR ADOCK0700g3

S f

Evo DIS 1RIBUT10111 NHSS 9100502 W/ enc 1 & w/ incoming WITS 91000196

' Docket 70-1113;u i

\\; PDR i

\\NRC File Center :

IMUF R/F IMSB R/F NMSS R/F lHNS Central File CEstep Viharl)o (I)

EFlacc Region 11 Giroup, Ril WCline, Ril JXreh, Ril WBrown NMSS Off. R/F JGreeves CJenkins f'&n A LJacobs-Baynard MTokar

4 l

ENCLOSURE I

DESCRIPTION OF STAFF ACTIONS PLANNED IN RESPONSE TO THE INVESTIGATION OF THE MAY 29, 1991, INCIDENT AT THE GENERAL ELECTRIC NUCLEAR i

FUEL AND COMPONENT FACILITY

(

Reference:

NVREG-1450) t i

ITEM 3.B Reevaluate the adequacy of the GE fuels facility RCEP and implementing i

procedures regarding emergency planning, event classification, and notifications.

Ensure the RCEP and implementing procedures are reviced as necesssry.

ACTIOP ILM NMSS and Region 11 will reevaluate the adequacy of the GE fuels facility RCEP regarding emergency planning, event classification, and notifications.

Region 11 will reevaluate the adequacy of the GE fuel facility implementing procedures. NMSS and Re'jion 11 will ensure the RCEP and implementing procedures are revised as necessary.

4 STATUS By letter datea January 17, 1992, GE submitted an amendment application dated December 28, 1991, to update its Radiological Contingency and Emergency Plan (RCEP).

From January to September 1992, several draft applications were 4

i submitted, and several meetings an-i ielephone conference calls were held j

between GE, Region 11, and the Office of Nuclear Material Safety and 1

Safeguards (NMSS) staff. On October 2, 1992, GE resubmitted the' amendment application to incorporate all changes agreed to by GE, Region 11, and NMSS staff..The October 2,1992, submittal replaced the January 17, 1992, submittal in its entirety, and an October 26, 1992, submittal supplemented the j

October 2, 1992, submittal.

Sections of the RCEP where significant revisions were made as a result of the i

October 2 and October 26 submittals include:

Chapter 3, " Classes. of Radiological / Emergency Conditions." The classification system was revised to conform with Regulatory Guide 3.67, Standard format and Content for Emergency Plans for fuel Cycle and 3.

Materials facilities.

Changes included adding several tables with-

. flowcharts for classifying emergencies and adding _ a chart to facilitate classifying incidents in a timely manner.

l i

i e

=

~

1 3

J i

i Chapter 4, "Organtzational Control of Emergencies and/or _ Radiological Contingencies." Notification requirements to NRC and local agencies were updated.

4 Chapter 7, " Radiological & Emergency Preparedness Capability." Training requirements of HAZCOM and radiation protection were added.

Initial and periodic traintng requirteents for the emergency organization members were more clearly described. Training with offsite support agencies and local and state goverinnent agencies was added.-

On October 29, 1992, License Amendment No.-27 was issued to GE authorizing the changes to the RCEP in the October 2 and October 26, 1992, submittals.

A routine inspection in October 1992 included evaluation of the annual emergency response exercfsa and detailed review of the RCEP implementing procedures..No exercise weaknesses or program deficiencies were-identified.

An aren for improvement with. respect to the RCEP implementing procedures was the prioritization of procedural steps and the elimination of numerous redundancies.

Licensee management agreed to appropriately address this improvement item, which will be tracked by Region 11 to ensure resolution.

i i

PRIORITY:

1 RESOURCES; 0.2 FTE (NMSS)

STATUS:

Closed COMPLETION DATE:. 10/29/92 l

CONTACTS:

NMSS-Hickey l

RII-Collins l-t i

e

.,y,;vf M

  • y{,.

... ~.

v.,

  • TyQ'5k'$,.,

t' *t.

g

  • W* ya ;;;.

T;ctet

., ya. <

DATE RECEIVED

/,91..OR I G I N AL DUE D1:

4 % 2

/2 COtJTh0L NO: v i vv y..

c ~,

,s

.c:~ i". D I V I S I ON CATE: OY/23/92 DOC DT v//OS/91 FROM:

M '*l,,,, 7 Z#'

  • TIME:

COMP DT Berneco NMSS TO:

Taylor FOR SIGNATURE OF

$t SFEC 4*.

SECY NO:

ASSIGNED TO:

CONTACT:

1MNS Hauqhney DESC:

ROUTING:

STAFF ACTION PLAN RESPONDING TO INVESTIGATION OF Bernero THE 5/29/91 INCIDENT AT GE WILMINGTON - ADEOUACY Arlotto OF EMERGENCY PREPAREDNESS - F EEVAl.UATE ACEDUACY OF Brown GE'S RADIOLOGICAL CONTINCEfL/ *11D EMoiRtiENC/ FLAN Jacobs-Baynard

'FCEP).

Jent ins SPECIAL INSTRUCTIONS OR RE_t%s 5:

e!1E AS EDO WI TS NUMDER 91 - 1 's L.m to NMSS - 9/2?./72 Due to E00

- 9/20/92 sf4 2.'

s.

.P, s.

_