ML20199B349: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:,-
{{#Wiki_filter:,-
      - Entergy Entergy Operations. inc.
- Entergy
.-                                                                                            :a,_
:a,_
                  .                                                                         Tel 504 739 6242 Early C. Ewing. lit b   afety & Regulawy Man W3F197-0257 A4.05 PR November 14,1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Entergy Operations. inc.
Tel 504 739 6242 Early C. Ewing. lit b
afety & Regulawy Man W3F197-0257 A4.05 PR November 14,1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555


==Subject:==
==Subject:==
Line 26: Line 28:
Should you have any questions regarding the above, please contact me at (504) 739-6242 or Tim Gaudet at (504) 739 6666.
Should you have any questions regarding the above, please contact me at (504) 739-6242 or Tim Gaudet at (504) 739 6666.
Very truly yours, e
Very truly yours, e
                    ~'
{ll
{ll E.C. Ewing                                                                                   ,
~'
Director                                                                                                 '
E.C. Ewing Director Nuclear Safety & Regulatory Affairs j
Nuclear Safety & Regulatory Affairs                                                       j   f ECE/ PRS /ssf Attachment 1
f ECE/ PRS /ssf Attachment cc.
cc.                 E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),
E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),
J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
J.T. Wheelock (INPO Reconis Center), NRC Resident inspectors
J.T. Wheelock (INPO Reconis Center), NRC Resident inspectors
    .  ~            , ,. . n c f, p, Office fdi1       @ $7PDR&                                         !!!,5k!k!]Ni!i R                             u
,,.. n c f, p, Office
~
fdi1 @ $7 &
!!!,5k!k!]Ni!i R
PDR u


          'a NRC MONTHLY OPERATING REPORT
'a NRC MONTHLY OPERATING REPORT


==SUMMARY==
==SUMMARY==
OF OPERATIONS WATERFORD 3 for October,1997 The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period, uw                                                                                     ,,,,-,,,.
OF OPERATIONS WATERFORD 3 for October,1997 The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period, uw


                              --              _ =.    .  - . _ .            ._ _. .- - ____ .- .
_ =.
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for October,1997 There were no pressurizer safety valve failures or challenges experienced during the month.
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for October,1997 There were no pressurizer safety valve failures or challenges experienced during the month.
nw                                                                                                 r.:               .r . !
nw r. :
.r.


OPERATING DATA REPORT DOCKET NUMBER :           50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : November 5,1997 COMPLETED BY : D. S. Freeman TELEPHONE: (504)739-6575 OPERATING STATUS
OPERATING DATA REPORT DOCKET NUMBER :
: 1. Reporting Period                             :        October,1997 Gross Hours in Reporting Period             :      745
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
: 2. Currently Authorized Power Level (MWt)       :    3,390 Maximum Dependable Capacity (Net MWe) :           1,07s Design Electrical Rating (Net MWe)         :    1,104
November 5,1997 COMPLETED BY :
: 3. Power Level to which Restricted (if any)(Net MWe)           :    N/A
D. S. Freeman TELEPHONE:
: 4. Reason for Restriction (if any)               :      N/A THIS       YEAR TO MONTH           DATE           CUMULATIVE
(504)739-6575 OPERATING STATUS
: 5. Number of Hours Reactor was Critical               745.0       4,774.s               89,07s.7
: 1. Reporting Period October,1997 Gross Hours in Reporting Period 745
: 6. Reactor Reserve Shutdown Hours                       0.0           0.0                   0.0
: 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :
: 7. Hours Generator was On-line                         745.0       4,697.4               88,021.7
1,07s Design Electrical Rating (Net MWe) 1,104
: 8. Unit Reserve Shutdown Hours                         0.0           0.0       ,
: 3. Power Level to which Restricted (if any)(Net MWe)
o.o 9, Gross Thermal Energy Generated (MWh,             2,523,657     15,769,777           292,027,142
N/A
: 10. Gross Electrical Energy Generated (MWH)         _
: 4. Reason for Restriction (if any)
856,440     s,347,400             97,533,sso
N/A THIS YEAR TO MONTH DATE CUMULATIVE
: 11. Net Electrical Energy Generated (MWH)             s21,520     s.101,420             93,034,081
: 5. Number of Hours Reactor was Critical 745.0 4,774.s 89,07s.7
: 12. Reactor Service Factor                             100.0         65.4                 84.0
: 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
: 13. Reactor Availability Factor                         100.0         65.4                 84.0
: 7. Hours Generator was On-line 745.0 4,697.4 88,021.7
: 14. Unit Service Factor                                 100.0         64.4                 83.0
: 8. Unit Reserve Shutdown Hours 0.0 0.0 o.o 9, Gross Thermal Energy Generated (MWh, 2,523,657 15,769,777 292,027,142
: 15. Unit Availability Factor                           100.0         s4.4                 83.0
: 10. Gross Electrical Energy Generated (MWH) 856,440 s,347,400 97,533,sso
: 16. Unit Capacity Factor (using MDC)                   102.s         65.0                 81.s
: 11. Net Electrical Energy Generated (MWH) s21,520 s.101,420 93,034,081
: 17. Unit Capacity Factor (using DER)                     99.9         63.3 79.4
: 12. Reactor Service Factor 100.0 65.4 84.0
: 18. Unit Forced Outage Rate                               0.0           0.0                   3.s
: 13. Reactor Availability Factor 100.0 65.4 84.0
          ""'                                                                                          ,,,, . m .
: 14. Unit Service Factor 100.0 64.4 83.0
: 15. Unit Availability Factor 100.0 s4.4 83.0
: 16. Unit Capacity Factor (using MDC) 102.s 65.0 81.s
: 17. Unit Capacity Factor (using DER) 99.9 63.3 79.4
: 18. Unit Forced Outage Rate 0.0 0.0 3.s
,,,,. m.


OPERATING DATA REPORT DOCKET NUMBER :       50 382 UNIT NAME : WATERFORD 3 DATE OF REPORT : November 5,1997 COMPLETED BY : D. S. Freeman TELEPHONE: (504) 739-6575 OPERATING STATUS (Contj
OPERATING DATA REPORT DOCKET NUMBER :
50 382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
November 5,1997 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 739-6575 OPERATING STATUS (Contj
: 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
: 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
NONE
NONE
: 20. If Shutdown at end of report period, estimated date of startup :             N/A
: 20. If Shutdown at end of report period, estimated date of startup :
N/A
: 21. Unit is in Commercial Operation.
: 21. Unit is in Commercial Operation.
THIS       YEAR TO MONTH           DATE       CUMULATIVE
THIS YEAR TO MONTH DATE CUMULATIVE
: 22. Hours in Reporting Period                           745
: 22. Hours in Reporting Period 745
* 7,296               106,105
* 7,296 106,105
: 23. Unit Forced Outage Hours                             o.0           0.0                 3,21s.9
: 23. Unit Forced Outage Hours o.0 0.0 3,21s.9
: 24. Nameplate Rating         (Gross MWe)           :    1,200 Max. Dependable Capacity (Gross MWe)         :    1,120
: 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
: 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :
: 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :
N/A O NOTE: Hours in October = (31 days in October X 24 hours per day) + 1 hour gained on October 26. 1997 for Daylight Savings Time Shift = 744 hours. + 1 hr.=
N/A O NOTE: Hours in October = (31 days in October X 24 hours per day) + 1 hour gained on October 26. 1997 for Daylight Savings Time Shift = 744 hours. + 1 hr.=
745 hours.
745 hours.
W                                                                                             Page : 4 of t
W Page : 4 of t


AVERAGE DAILY UNIT POWER LEVEL i
AVERAGE DAILY UNIT POWER LEVEL i
DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3               j DATE OF REPORT : November 5,1997 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 739-6575               ,
DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 j
,                  Reporting Period :                 October,1997                                           ( NET MWe )
DATE OF REPORT : November 5,1997 COMPLETED BY :
D. S. Freeman TELEPHONE : (504) 739-6575 Reporting Period :
October,1997
( NET MWe )
DAY Avg. Power Level DAY Avg. Power Level 3
DAY Avg. Power Level DAY Avg. Power Level 3
1               1,100                                 16       1,103 2               1,100                                 17       1,100 3               1,095                                 18       1,105 4               1,094                                 19       1,108 5               1,099                                 20       1,106 6               1,101                                 21       1,100 7               1,102                                 22       1,104 8               1,102                                 23       1,105 9               1,102                                 24       1,105 10               1,103                                 25       1,105 11               1,102                                 26       1,105*
1 1,100 16 1,103 2
12               1,102                                 27       1,106 13               1,102                                 28       1,106 14               1,102                                 29       1,106
1,100 17 1,100 3
                                                                                          ~
1,095 18 1,105 4
15-             1,102                                 30       1,106 31       1,105 INSTRUCTIONS :
1,094 19 1,108 5
1,099 20 1,106 6
1,101 21 1,100 7
1,102 22 1,104 8
1,102 23 1,105 9
1,102 24 1,105 10 1,103 25 1,105 11 1,102 26 1,105*
12 1,102 27 1,106 13 1,102 28 1,106 14 1,102 29 1,106
~
15-1,102 30 1,106 31 1,105 INSTRUCTIONS :
On this form, liet the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
On this form, liet the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
* NOTE: Used 25 hours on October 26 for implementation of Daylight Savings Time.
* NOTE: Used 25 hours on October 26 for implementation of Daylight Savings Time.
        '"                                                                                                                e : , .r .
e :,.r.


UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : November 5,1997 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 739-6575 REPORTING PERIOD :     October,1997
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : November 5,1997 COMPLETED BY :
                                *                  "    Shutdown Cause, Comments and Date            Duration Number (yymmdd) Type       (Hours) Reason Method Corrective Actions NONE TYPE                             REASON F - Forced                           A - Equipment Failure (explain)
D. S. Freeman TELEPHONE : (504) 739-6575 REPORTING PERIOD :
S - Scheduled                         B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD                                           License Examination 1 - Manual                           F - Administrative 2 - Manual Scram                     G - Operational Error (explain) 3 - Automatic Scram                   H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) uw                                                                                 r:.a.
October,1997 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE TYPE REASON F - Forced A - Equipment Failure (explain)
                                .-          .                                            --          . - .}}
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) uw r:.a.
. -.}}

Latest revision as of 08:34, 10 December 2024

Monthly Operating Rept for Oct 1997 for Waterford 3 Ses
ML20199B349
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/31/1997
From: Ewing E, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-97-0257, W3F1-97-257, NUDOCS 9711180281
Download: ML20199B349 (7)


Text

,-

- Entergy

a,_

Entergy Operations. inc.

Tel 504 739 6242 Early C. Ewing. lit b

afety & Regulawy Man W3F197-0257 A4.05 PR November 14,1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of October,1997. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Should you have any questions regarding the above, please contact me at (504) 739-6242 or Tim Gaudet at (504) 739 6666.

Very truly yours, e

{ll

~'

E.C. Ewing Director Nuclear Safety & Regulatory Affairs j

f ECE/ PRS /ssf Attachment cc.

E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),

J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),

J.T. Wheelock (INPO Reconis Center), NRC Resident inspectors

,,.. n c f, p, Office

~

fdi1 @ $7 &

!!!,5k!k!]Ni!i R

PDR u

'a NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for October,1997 The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period, uw

_ =.

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for October,1997 There were no pressurizer safety valve failures or challenges experienced during the month.

nw r. :

.r.

OPERATING DATA REPORT DOCKET NUMBER :

50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :

November 5,1997 COMPLETED BY :

D. S. Freeman TELEPHONE:

(504)739-6575 OPERATING STATUS

1. Reporting Period October,1997 Gross Hours in Reporting Period 745
2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :

1,07s Design Electrical Rating (Net MWe) 1,104

3. Power Level to which Restricted (if any)(Net MWe)

N/A

4. Reason for Restriction (if any)

N/A THIS YEAR TO MONTH DATE CUMULATIVE

5. Number of Hours Reactor was Critical 745.0 4,774.s 89,07s.7
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator was On-line 745.0 4,697.4 88,021.7
8. Unit Reserve Shutdown Hours 0.0 0.0 o.o 9, Gross Thermal Energy Generated (MWh, 2,523,657 15,769,777 292,027,142
10. Gross Electrical Energy Generated (MWH) 856,440 s,347,400 97,533,sso
11. Net Electrical Energy Generated (MWH) s21,520 s.101,420 93,034,081
12. Reactor Service Factor 100.0 65.4 84.0
13. Reactor Availability Factor 100.0 65.4 84.0
14. Unit Service Factor 100.0 64.4 83.0
15. Unit Availability Factor 100.0 s4.4 83.0
16. Unit Capacity Factor (using MDC) 102.s 65.0 81.s
17. Unit Capacity Factor (using DER) 99.9 63.3 79.4
18. Unit Forced Outage Rate 0.0 0.0 3.s

,,,,. m.

OPERATING DATA REPORT DOCKET NUMBER :

50 382 UNIT NAME : WATERFORD 3 DATE OF REPORT :

November 5,1997 COMPLETED BY :

D. S. Freeman TELEPHONE:

(504) 739-6575 OPERATING STATUS (Contj

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

NONE

20. If Shutdown at end of report period, estimated date of startup :

N/A

21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 745
  • 7,296 106,105
23. Unit Forced Outage Hours o.0 0.0 3,21s.9
24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :

N/A O NOTE: Hours in October = (31 days in October X 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day) + 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> gained on October 26. 1997 for Daylight Savings Time Shift = 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />. + 1 hr.=

745 hours0.00862 days <br />0.207 hours <br />0.00123 weeks <br />2.834725e-4 months <br />.

W Page : 4 of t

AVERAGE DAILY UNIT POWER LEVEL i

DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 j

DATE OF REPORT : November 5,1997 COMPLETED BY :

D. S. Freeman TELEPHONE : (504) 739-6575 Reporting Period :

October,1997

( NET MWe )

DAY Avg. Power Level DAY Avg. Power Level 3

1 1,100 16 1,103 2

1,100 17 1,100 3

1,095 18 1,105 4

1,094 19 1,108 5

1,099 20 1,106 6

1,101 21 1,100 7

1,102 22 1,104 8

1,102 23 1,105 9

1,102 24 1,105 10 1,103 25 1,105 11 1,102 26 1,105*

12 1,102 27 1,106 13 1,102 28 1,106 14 1,102 29 1,106

~

15-1,102 30 1,106 31 1,105 INSTRUCTIONS :

On this form, liet the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

  • NOTE: Used 25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> on October 26 for implementation of Daylight Savings Time.

e :,.r.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : November 5,1997 COMPLETED BY :

D. S. Freeman TELEPHONE : (504) 739-6575 REPORTING PERIOD :

October,1997 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) uw r:.a.

. -.