ML20199J739: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:C. K. McCoy               Southern Nuclear -
{{#Wiki_filter:,
    'y    W:e Pts @nt               Operating Corepent.ine.
'y C. K. McCoy Southern Nuclear -
Vogtie Project           40 inverness Center Parkway ^
W:e Pts @nt Operating Corepent.ine.
                                  . RO. B *295 Birrningem, Alabama 35201 Tel 205 932.7122 I
Vogtie Project 40 inverness Center Parkway ^
. RO. B *295 Birrningem, Alabama 35201 Tel 205 932.7122 I
Fax 2059920403 SOUTHERN ma COMPANY Energy to Serve) bus World*
Fax 2059920403 SOUTHERN ma COMPANY Energy to Serve) bus World*
November 20, 1997                                                           LCV-ll25 Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemt t VOGTLE ELECTRIC GENERATING PLANT GENERIC LETTER 92-08 FOLLOW-UP RESPONSE THERMO-LAG REMOVAL All thermo-lag material that was installed at the Vogtle Electric Generating Plant as fire barrier material pursuant to the requirements of BTP CMEB 9.5-1 was removed. The final removal was effected during the last refueling outage, IR7, which was completed on October 22,1997. Some miscellaneous Thermo-Lag material, not used to meet the requirements of CMEB 9.5-1, still remains at VEGP and is being removed per our schedule.
November 20, 1997 LCV-ll25 Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemt t VOGTLE ELECTRIC GENERATING PLANT GENERIC LETTER 92-08 FOLLOW-UP RESPONSE THERMO-LAG REMOVAL All thermo-lag material that was installed at the Vogtle Electric Generating Plant as fire barrier material pursuant to the requirements of BTP CMEB 9.5-1 was removed. The final removal was effected during the last refueling outage, IR7, which was completed on October 22,1997. Some miscellaneous Thermo-Lag material, not used to meet the requirements of CMEB 9.5-1, still remains at VEGP and is being removed per our schedule.
Sincerely, C. K. McCoy CKM/KWK/gmb cc:     Southern Nuclear Operating Company Mr. J. B. Beasley, Jr.
Sincerely, C. K. McCoy CKM/KWK/gmb cc:
Mr. M. Sheibani NORMS                                                                                     ,
Southern Nuclear Operating Company Mr. J. B. Beasley, Jr.
U. S. Nuclear Regulatory Commission                                       h                D Mr. L. A. Reyes, Regional Administrator Mr. L L. Wheeler, Senior Project Manager, NRR NRC Senior Resident inspector, Vogtle 9711290214 971120                                                       h hlh{h!
Mr. M. Sheibani NORMS h
kl PDR     ADOCK 05000424 F                       l'DR}}
D U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. L L. Wheeler, Senior Project Manager, NRR NRC Senior Resident inspector, Vogtle 9711290214 971120 h hlh{h!
kl PDR ADOCK 05000424 F
l'DR}}

Latest revision as of 04:20, 8 December 2024

Informs That All Thermo-Lag Matl That Was Installed at Vogtle Electric Generating Plant as Fire Barrier Matl Per Requirements of BTP Cmeb 9.5-1 Was Removed.Final Removal Effected During Last Refueling outage,1R7
ML20199J739
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/20/1997
From: Mccoy C
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-92-08, GL-92-8, LCV-1125, NUDOCS 9711280214
Download: ML20199J739 (1)


Text

,

'y C. K. McCoy Southern Nuclear -

W:e Pts @nt Operating Corepent.ine.

Vogtie Project 40 inverness Center Parkway ^

. RO. B *295 Birrningem, Alabama 35201 Tel 205 932.7122 I

Fax 2059920403 SOUTHERN ma COMPANY Energy to Serve) bus World*

November 20, 1997 LCV-ll25 Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemt t VOGTLE ELECTRIC GENERATING PLANT GENERIC LETTER 92-08 FOLLOW-UP RESPONSE THERMO-LAG REMOVAL All thermo-lag material that was installed at the Vogtle Electric Generating Plant as fire barrier material pursuant to the requirements of BTP CMEB 9.5-1 was removed. The final removal was effected during the last refueling outage, IR7, which was completed on October 22,1997. Some miscellaneous Thermo-Lag material, not used to meet the requirements of CMEB 9.5-1, still remains at VEGP and is being removed per our schedule.

Sincerely, C. K. McCoy CKM/KWK/gmb cc:

Southern Nuclear Operating Company Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS h

D U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. L L. Wheeler, Senior Project Manager, NRR NRC Senior Resident inspector, Vogtle 9711290214 971120 h hlh{h!

kl PDR ADOCK 05000424 F

l'DR