ML20199J739: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:C. K. McCoy | {{#Wiki_filter:, | ||
'y C. K. McCoy Southern Nuclear - | |||
Vogtie Project | W:e Pts @nt Operating Corepent.ine. | ||
Vogtie Project 40 inverness Center Parkway ^ | |||
. RO. B *295 Birrningem, Alabama 35201 Tel 205 932.7122 I | |||
Fax 2059920403 SOUTHERN ma COMPANY Energy to Serve) bus World* | Fax 2059920403 SOUTHERN ma COMPANY Energy to Serve) bus World* | ||
November 20, 1997 | November 20, 1997 LCV-ll25 Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemt t VOGTLE ELECTRIC GENERATING PLANT GENERIC LETTER 92-08 FOLLOW-UP RESPONSE THERMO-LAG REMOVAL All thermo-lag material that was installed at the Vogtle Electric Generating Plant as fire barrier material pursuant to the requirements of BTP CMEB 9.5-1 was removed. The final removal was effected during the last refueling outage, IR7, which was completed on October 22,1997. Some miscellaneous Thermo-Lag material, not used to meet the requirements of CMEB 9.5-1, still remains at VEGP and is being removed per our schedule. | ||
Sincerely, C. K. McCoy CKM/KWK/gmb cc: | Sincerely, C. K. McCoy CKM/KWK/gmb cc: | ||
Mr. M. Sheibani NORMS | Southern Nuclear Operating Company Mr. J. B. Beasley, Jr. | ||
U. S. Nuclear Regulatory Commission | Mr. M. Sheibani NORMS h | ||
kl PDR | D U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. L L. Wheeler, Senior Project Manager, NRR NRC Senior Resident inspector, Vogtle 9711290214 971120 h hlh{h! | ||
kl PDR ADOCK 05000424 F | |||
l'DR}} | |||
Latest revision as of 04:20, 8 December 2024
| ML20199J739 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 11/20/1997 |
| From: | Mccoy C SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-92-08, GL-92-8, LCV-1125, NUDOCS 9711280214 | |
| Download: ML20199J739 (1) | |
Text
,
'y C. K. McCoy Southern Nuclear -
W:e Pts @nt Operating Corepent.ine.
Vogtie Project 40 inverness Center Parkway ^
. RO. B *295 Birrningem, Alabama 35201 Tel 205 932.7122 I
Fax 2059920403 SOUTHERN ma COMPANY Energy to Serve) bus World*
November 20, 1997 LCV-ll25 Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemt t VOGTLE ELECTRIC GENERATING PLANT GENERIC LETTER 92-08 FOLLOW-UP RESPONSE THERMO-LAG REMOVAL All thermo-lag material that was installed at the Vogtle Electric Generating Plant as fire barrier material pursuant to the requirements of BTP CMEB 9.5-1 was removed. The final removal was effected during the last refueling outage, IR7, which was completed on October 22,1997. Some miscellaneous Thermo-Lag material, not used to meet the requirements of CMEB 9.5-1, still remains at VEGP and is being removed per our schedule.
Sincerely, C. K. McCoy CKM/KWK/gmb cc:
Southern Nuclear Operating Company Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS h
D U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. L L. Wheeler, Senior Project Manager, NRR NRC Senior Resident inspector, Vogtle 9711290214 971120 h hlh{h!
kl PDR ADOCK 05000424 F
l'DR