3 November 20,:1997 Mr. J. E. Cross
3 November 20,:1997 Mr. J. E. Cross
    . President Generation Group Duquesne Light Company _
. President Generation Group Duquesne Light Company _
Post Office Box 4 Ehippingport, Pennsylvania 15077
Post Office Box 4 Ehippingport, Pennsylvania 15077


Line 26: Line 26:


==Dear Mr. Cross:==
==Dear Mr. Cross:==
 
' On October 22,1997, the NRC staff completed the semiannual plant performance review
    ' On October 22,1997, the NRC staff completed the semiannual plant performance review
'(PPR) of the Beaver Valley Power Station reactor facilities. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The FPR for Beaver Valley Power Station involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period April 1997 to September 1997. The PPR provides NRC maragement with a current summary of licensee performance and serves as input to the NRC systematic assessment of licensee performance (SALP) and senior management meeting (SMM) reviews.
    '(PPR) of the Beaver Valley Power Station reactor facilities. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The FPR for Beaver Valley Power Station involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period April 1997 to September 1997. The PPR provides NRC maragement with a current summary of licensee performance and serves as input to the NRC systematic assessment of licensee performance (SALP) and senior management meeting (SMM) reviews.
This letter advises you of our p;anned inspection effort resulting from the Beaver Valley Power Station PPR It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts e d personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan at Beaver Valley Power Station for the next 6 months. - Resident inspections are not listed due to their ongoing and continuous nature.
This letter advises you of our p;anned inspection effort resulting from the Beaver Valley Power Station PPR It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts e d personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan at Beaver Valley Power Station for the next 6 months. - Resident inspections are not listed due to their ongoing and continuous nature.
We willinform you of any changes to the inspection plan, if you have any questions, please contact me at (610) 337-5234, 4
We willinform you of any changes to the inspection plan, if you have any questions, please contact me at (610) 337-5234, 4
Sincerely,                             i Peter W. Eselgroth, Chief Projects Branch 7.
i Sincerely, Peter W. Eselgroth, Chief j(
                                                                                              ,  j(
Projects Branch 7.
g j Division of Reactor Projects
g j
      ' Docket Nos. 50 334; 50-412 E:. closure: Beaver Valley Power Station inspection Plan
Division of Reactor Projects
[I   t 9712010049 971120
' Docket Nos. 50 334; 50-412 E:. closure: Beaver Valley Power Station inspection Plan
          .POR ADOCK 05000334.
[I t
* PH         ,
9712010049 971120
.POR ADOCK 05000334.
PH


i Mr. J. E. Cross                                                       2 cc w/ encl:
i Mr. J. E. Cross 2
cc w/ encl:
Sushil C. Jain, Vice President, Nuclear Services R. LeGrand, Division Vice President, Nuclear Operations Group & Plant Manager W. Kline. Manager, Nuclear Engineering Department B. Tuite, General Manager, Nuclear Operations Unit K. L. Ostrowski, Manager, Quality Services Unit J. Arias, Director, Safety & Licensing Department M. Clancy, Mayor Commonwealth of Pennsylvania State of Ohio Distribution w/ encl:
Sushil C. Jain, Vice President, Nuclear Services R. LeGrand, Division Vice President, Nuclear Operations Group & Plant Manager W. Kline. Manager, Nuclear Engineering Department B. Tuite, General Manager, Nuclear Operations Unit K. L. Ostrowski, Manager, Quality Services Unit J. Arias, Director, Safety & Licensing Department M. Clancy, Mayor Commonwealth of Pennsylvania State of Ohio Distribution w/ encl:
Region 1 Docket Room (with concurrences)
Region 1 Docket Room (with concurrences)
PUBLIC Nuclear Safety information Center (NSIC)                                                                                                   '
PUBLIC Nuclear Safety information Center (NSIC)
NRC Resident inspector H. Miller, RA P. Eselgroth, DRP N. Perry, DRP D. Haverkamp, DRP A. Linde, DRP DRS Director, Region I DRS Deputy Director, Region i M. Oprendek, DRP K. Kennedy, OEDO J. Stolz, PDl 2, NRR D. Brinkman, PM, PDI-2, NRR R. Correia, NRR F. Talbot, NRR DOCDESK Inspection Program Branch, NRR (IPAS)
NRC Resident inspector H. Miller, RA P. Eselgroth, DRP N. Perry, DRP D. Haverkamp, DRP A. Linde, DRP DRS Director, Region I DRS Deputy Director, Region i M. Oprendek, DRP K. Kennedy, OEDO J. Stolz, PDl 2, NRR D. Brinkman, PM, PDI-2, NRR R. Correia, NRR F. Talbot, NRR DOCDESK Inspection Program Branch, NRR (IPAS)
DOCUMENT NAME: G:\ BRANCH 7\PPRL1197.BV Ta receive a copy of this doeurnent, hwncete in the bos: 'C' = Copy wthout attachment / enclosure *E* = Copy wth attachment / enclosure *N' = No copy 0FFICE         Rl/0RP                             a Ril.QRFh         - I e-         /           l                             l                   l NAME           DHaverkamp hRic- PE,sg4tscoth DATE             11/20/97:                           11/24 /97                   11/   /97             11/       /97               11/       /97 0FFICIAL RECORD COPY
DOCUMENT NAME: G:\\ BRANCH 7\\PPRL1197.BV Ta receive a copy of this doeurnent, hwncete in the bos: 'C' = Copy wthout attachment / enclosure
*E* = Copy wth attachment / enclosure
*N' = No copy 0FFICE Rl/0RP a
Ril.QRFh
- I e-
/
l l
l NAME DHaverkamp hRic-PE,sg4tscoth DATE 11/20/97:
11/24 /97 11/
/97 11/
/97 11/
/97 0FFICIAL RECORD COPY


BEAVER VALLEY INSPECTION PLAN INSPECT'.ON                           TITLE / PROGRAM AREA                           PLANNED         INSPECTION PP.OCEGURE                                                                           DATES           TYPE 82701         Operational Status of the Emergency Preparedness Program               12/8-12/97     Core 83728         Maintaining Occupational Exposures ALARA                               12/8 -12/97     Regional '
BEAVER VALLEY INSPECTION PLAN INSPECT'.ON TITLE / PROGRAM AREA PLANNED INSPECTION PP.OCEGURE DATES TYPE 82701 Operational Status of the Emergency Preparedness Program 12/8-12/97 Core 83728 Maintaining Occupational Exposures ALARA 12/8 -12/97 Regional '
Initiative 37550         Engineering                                                           12/15-19/97     Core 37001         10 CFR 50.59 Safety Eva!uation Program                                 1/5 - 9/98     Core                   .
Initiative 37550 Engineering 12/15-19/97 Core 37001 10 CFR 50.59 Safety Eva!uation Program 1/5 - 9/98 Core (Onsite) i 93809 Safety System Engineerir.g inspection (SSEI) 1/12-16/98 (RI Office) 1/19 - 23/98 (Onsite) 81700 Physical Security Program for Power Reactors -Visit No. 2 1/5 - 9/98 Core Occupational Radiation Exposure 1/26 - 30/98 Core 83750 83750 Occupational Radiation Exposure - Unit 2 Outage 3/23-27/98 Core Note: Does not include core resident inspections: 71707 (plant opeiations), 61726 (surveillance), 62707 (maintenance),
,                                                                                        (Onsite) i 93809         Safety System Engineerir.g inspection (SSEI)                           1/12-16/98 (RI Office)
.                                                                                        1/19 - 23/98 (Onsite)                               !
81700         Physical Security Program for Power Reactors -Visit No. 2             1/5 - 9/98     Core 83750    -
Occupational Radiation Exposure                                       1/26 - 30/98   Core 83750         Occupational Radiation Exposure - Unit 2 Outage                       3/23-27/98       Core Note: Does not include core resident inspections: 71707 (plant opeiations), 61726 (surveillance), 62707 (maintenance),
37551 (onsite engineering), and 71750 (plant support activities).}}
37551 (onsite engineering), and 71750 (plant support activities).}}

Latest revision as of 04:15, 8 December 2024

Advises of Planned Insp Effort Resulting from Licensee Ppr. Details of Insp Plan at Plant for Next 6 Months Encl
ML20199K213
Person / Time
Site: Beaver Valley
Issue date: 11/20/1997
From: Eselgroth P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Cross J
DUQUESNE LIGHT CO.
References
NUDOCS 9712010049
Download: ML20199K213 (3)


Text

.. -

3 g

3 November 20,:1997 Mr. J. E. Cross

. President Generation Group Duquesne Light Company _

Post Office Box 4 Ehippingport, Pennsylvania 15077

SUBJECT:

PLANT PERFORMANCE REVIEW - BEAVER VALLEY POWER STATION

Dear Mr. Cross:

' On October 22,1997, the NRC staff completed the semiannual plant performance review

'(PPR) of the Beaver Valley Power Station reactor facilities. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The FPR for Beaver Valley Power Station involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period April 1997 to September 1997. The PPR provides NRC maragement with a current summary of licensee performance and serves as input to the NRC systematic assessment of licensee performance (SALP) and senior management meeting (SMM) reviews.

This letter advises you of our p;anned inspection effort resulting from the Beaver Valley Power Station PPR It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts e d personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan at Beaver Valley Power Station for the next 6 months. - Resident inspections are not listed due to their ongoing and continuous nature.

We willinform you of any changes to the inspection plan, if you have any questions, please contact me at (610) 337-5234, 4

i Sincerely, Peter W. Eselgroth, Chief j(

Projects Branch 7.

g j

Division of Reactor Projects

' Docket Nos. 50 334; 50-412 E:. closure: Beaver Valley Power Station inspection Plan

[I t

9712010049 971120

.POR ADOCK 05000334.

PH

i Mr. J. E. Cross 2

cc w/ encl:

Sushil C. Jain, Vice President, Nuclear Services R. LeGrand, Division Vice President, Nuclear Operations Group & Plant Manager W. Kline. Manager, Nuclear Engineering Department B. Tuite, General Manager, Nuclear Operations Unit K. L. Ostrowski, Manager, Quality Services Unit J. Arias, Director, Safety & Licensing Department M. Clancy, Mayor Commonwealth of Pennsylvania State of Ohio Distribution w/ encl:

Region 1 Docket Room (with concurrences)

PUBLIC Nuclear Safety information Center (NSIC)

NRC Resident inspector H. Miller, RA P. Eselgroth, DRP N. Perry, DRP D. Haverkamp, DRP A. Linde, DRP DRS Director, Region I DRS Deputy Director, Region i M. Oprendek, DRP K. Kennedy, OEDO J. Stolz, PDl 2, NRR D. Brinkman, PM, PDI-2, NRR R. Correia, NRR F. Talbot, NRR DOCDESK Inspection Program Branch, NRR (IPAS)

DOCUMENT NAME: G:\\ BRANCH 7\\PPRL1197.BV Ta receive a copy of this doeurnent, hwncete in the bos: 'C' = Copy wthout attachment / enclosure

  • E* = Copy wth attachment / enclosure
  • N' = No copy 0FFICE Rl/0RP a

Ril.QRFh

- I e-

/

l l

l NAME DHaverkamp hRic-PE,sg4tscoth DATE 11/20/97:

11/24 /97 11/

/97 11/

/97 11/

/97 0FFICIAL RECORD COPY

BEAVER VALLEY INSPECTION PLAN INSPECT'.ON TITLE / PROGRAM AREA PLANNED INSPECTION PP.OCEGURE DATES TYPE 82701 Operational Status of the Emergency Preparedness Program 12/8-12/97 Core 83728 Maintaining Occupational Exposures ALARA 12/8 -12/97 Regional '

Initiative 37550 Engineering 12/15-19/97 Core 37001 10 CFR 50.59 Safety Eva!uation Program 1/5 - 9/98 Core (Onsite) i 93809 Safety System Engineerir.g inspection (SSEI) 1/12-16/98 (RI Office) 1/19 - 23/98 (Onsite) 81700 Physical Security Program for Power Reactors -Visit No. 2 1/5 - 9/98 Core Occupational Radiation Exposure 1/26 - 30/98 Core 83750 83750 Occupational Radiation Exposure - Unit 2 Outage 3/23-27/98 Core Note: Does not include core resident inspections: 71707 (plant opeiations), 61726 (surveillance), 62707 (maintenance),

37551 (onsite engineering), and 71750 (plant support activities).