ML20202B460: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:--             _ _ - _ _ _ _ _ _.
{{#Wiki_filter:--
1 t Avt.                                                       UNIT E D sT ATES
1 Avt.
: g.                      t                           NUCLEAR REGULATORY COMMISSION REOloNiv
UNIT E D sT ATES t
t NUCLEAR REGULATORY COMMISSION g.
{
{
    'g                                                       611 RYAN PLAZA drive,sulTE 400 AR LINGToN, T E XAS 760118064 t, ,     ,+
REOloNiv
February 6, 1998 S. K. Gambhir, Division Manager Engineering & Operations Support                                                                                           ,
'g 611 RYAN PLAZA drive,sulTE 400 AR LINGToN, T E XAS 760118064 t,,
Omabs Public Power District Fort Calhoun Station FC 2-4 Adm.
,+
February 6, 1998 S. K. Gambhir, Division Manager Engineering & Operations Support Omabs Public Power District Fort Calhoun Station FC 2-4 Adm.
P.O. Box 399 Hwy. 75 North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399
P.O. Box 399 Hwy. 75 North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399


Line 31: Line 33:
Implementation of these changes will be subject to inspection to confirm that they have not decreased the overall effectiveness of your emergency plan, in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room.
Implementation of these changes will be subject to inspection to confirm that they have not decreased the overall effectiveness of your emergency plan, in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room.
Sincerely, P%
Sincerely, P%
Blaine Murray, Chief Plant Support Branc Division of Reactor fety Docket No.:                       50 285 License No.: DPR-40 t
Blaine Murray, Chief Plant Support Branc Division of Reactor fety Docket No.:
DO           O   285
50 285 License No.: DPR-40 t
* l  !
l DO O
F                                          PDR                                           '
285 F
PDR


i Omaha Public Power District             2-cc:
i Omaha Public Power District 2-cc:
James W. Tills, Manager Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2 4 Adm.
James W. Tills, Manager Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2 4 Adm.
P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 James W. Chase, Manager Fort Calhoun Station P.O. Box 399 Fort Calhoun, Nebraska 68023 Perry D. Robinson, Esq.
P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 James W. Chase, Manager Fort Calhoun Station P.O. Box 399 Fort Calhoun, Nebraska 68023 Perry D. Robinson, Esq.
Line 42: Line 45:
Washington, D.C. 20005 3502 Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Cheryl Rogers, LLRW Program Manager Environmental Protection Section Nebraska Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509 5007
Washington, D.C. 20005 3502 Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Cheryl Rogers, LLRW Program Manager Environmental Protection Section Nebraska Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509 5007


Omaha Public Power District                                 3 I
Omaha Public Power District 3
Regional Administrator DRS Director DRS Deputy Director DRS PSB DRP Director Branch Chief (DRP/B)
I Regional Administrator DRS Director DRS Deputy Director DRS PSB DRP Director Branch Chief (DRP/B)
Project Engineer (DRP/B)
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Branch Chief (DRP/TSS)
Resident inspector MIS System (Elko)
Resident inspector MIS System (Elko)
RIV File DRS Action item File (97 E-0013)
RIV File DRS Action item File (97 E-0013)
DOCUMENT NAME: G:\DRSLTRS\FC9801EP. LOO                                                                 TAC #XO3385 G:\DRSLTRS\FC9801EP. MOO -
DOCUMENT NAME: G:\\DRSLTRS\\FC9801EP. LOO TAC #XO3385 G:\\DRSLTRS\\FC9801EP. MOO -
To receive copy of document, Indicate in bar: "C" = Copy without enclosures "E" = Copy with enclosures *N" = No copy RIV:PSB -                     C:DRS\PSB THAndrews:nhgic               BMurray%
To receive copy of document, Indicate in bar: "C" = Copy without enclosures "E" = Copy with enclosures *N" = No copy RIV:PSB -
02/5798 /
C:DRS\\PSB THAndrews:nhgic BMurray%
02Af/98 OFFICIAL RECORD COPY
02Af/98 02/5798 /
_ _ _ _ _ _ _ - _ - .}}
OFFICIAL RECORD COPY
_ _ _ _ _ _ _ - _ -.}}

Latest revision as of 03:34, 8 December 2024

Ack Receipt of Which Transmitted Changes to REP for Fort Calhoun Station Submitted Under Provisions of 10CFR50,Appendix E & 10CFR50.4(b)(5)(iii).NRC Approval Not Required
ML20202B460
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/06/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gambhir S
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 9802120022
Download: ML20202B460 (3)


Text

--

1 Avt.

UNIT E D sT ATES t

t NUCLEAR REGULATORY COMMISSION g.

{

REOloNiv

'g 611 RYAN PLAZA drive,sulTE 400 AR LINGToN, T E XAS 760118064 t,,

,+

February 6, 1998 S. K. Gambhir, Division Manager Engineering & Operations Support Omabs Public Power District Fort Calhoun Station FC 2-4 Adm.

P.O. Box 399 Hwy. 75 North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399

SUBJECT:

CHANGES TO THE FORT CALHOUN STATION RADIOLOGICAL EMERGENCY Pl.AN This letter acknowledges receipt of your letter dated March 19,1997, which transmitted changes to the Radiological Emergency Plan for the Fort Calhoun Station submitted under the provisions of 10 CFR 50, Appendix E and 10 CFR 50.4(b)(5)(ill).

Based on your determination that the changes do not decrease the overall effectiveness of your emergency plan, and that it continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to Part 50, NRC approvalis not required. Our initial review of these changes indicates that they are in accordance with 10 CFR 50.54(q).

Implementation of these changes will be subject to inspection to confirm that they have not decreased the overall effectiveness of your emergency plan, in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room.

Sincerely, P%

Blaine Murray, Chief Plant Support Branc Division of Reactor fety Docket No.:

50 285 License No.: DPR-40 t

l DO O

285 F

PDR

i Omaha Public Power District 2-cc:

James W. Tills, Manager Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2 4 Adm.

P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 James W. Chase, Manager Fort Calhoun Station P.O. Box 399 Fort Calhoun, Nebraska 68023 Perry D. Robinson, Esq.

Winston & Strawn 1400 L. Street, N.W.

Washington, D.C. 20005 3502 Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Cheryl Rogers, LLRW Program Manager Environmental Protection Section Nebraska Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509 5007

Omaha Public Power District 3

I Regional Administrator DRS Director DRS Deputy Director DRS PSB DRP Director Branch Chief (DRP/B)

Project Engineer (DRP/B)

Branch Chief (DRP/TSS)

Resident inspector MIS System (Elko)

RIV File DRS Action item File (97 E-0013)

DOCUMENT NAME: G:\\DRSLTRS\\FC9801EP. LOO TAC #XO3385 G:\\DRSLTRS\\FC9801EP. MOO -

To receive copy of document, Indicate in bar: "C" = Copy without enclosures "E" = Copy with enclosures *N" = No copy RIV:PSB -

C:DRS\\PSB THAndrews:nhgic BMurray%

02Af/98 02/5798 /

OFFICIAL RECORD COPY

_ _ _ _ _ _ _ - _ -.