ML20203P955: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:,
{{#Wiki_filter:,
Distribution: WM-86151
Distribution: WM-86151 W,MRecgr -
            ,                            W,MRecgr -                 WM Projed     /   ~
WM Projed
                                                                                          .=ES/F rm3405
/
    .      y                                      <f               Dccket No.             WMRP r/f NMSS           SBilhorn PDR V EBrowning Distribution'-
.=ES/F rm3405
                    /CC/02/25                                                             MJBell b ##                   J0 Bunting MRKnapp (Return to WM,623 SS)
<f Dccket No.
JTGreeves JJLinehan William J. Purcell                                                             RRBoyle Director                                                                     SMCoplan Office of Geologic Repositories                                               JEKennedy Office of Civilian Radioactive                                                 RCook Waste Management                                                           PPresthol t U. S. Department of Energy                                                   TVerma RW-20                                                                         JGiarratana Washington, DC 20545                                                           DHedges & r/f PDR
WMRP r/f
~
y NMSS PDR V SBilhorn EBrowning Distribution'-
/CC/02/25 MJBell b ## J0 Bunting MRKnapp (Return to WM,623 SS)
JTGreeves JJLinehan William J. Purcell RRBoyle Director SMCoplan Office of Geologic Repositories JEKennedy Office of Civilian Radioactive RCook Waste Management PPresthol t U. S. Department of Energy TVerma RW-20 JGiarratana Washington, DC 20545 DHedges & r/f PDR


==Dear Mr. Purcell:==
==Dear Mr. Purcell:==
Line 36: Line 40:
Linehan transmitting NRC staff comments on Department of Energy Draft Supplements to the Office of Geologic Repositories Quality Assurance Plan The reference letter provided formal comments of the U. S. Nuclear Regulatory Commission (NRC) staff review of the subject documents. This letter provides' additional NRC staff comments which should be considered along with those provided in the {{letter dated|date=February 12, 1986|text=February 12, 1986 letter}}.
Linehan transmitting NRC staff comments on Department of Energy Draft Supplements to the Office of Geologic Repositories Quality Assurance Plan The reference letter provided formal comments of the U. S. Nuclear Regulatory Commission (NRC) staff review of the subject documents. This letter provides' additional NRC staff comments which should be considered along with those provided in the {{letter dated|date=February 12, 1986|text=February 12, 1986 letter}}.
Sincerely, 4
Sincerely, 4
John J. Linehan, Acting Chief Repository Projects Branch g o g s e60307                                 Division of Waste Management WM-1                 PDR                       Office of Nuclear Material Safety and Safeguards
John J. Linehan, Acting Chief Repository Projects Branch g o g s e60307 Division of Waste Management WM-1 PDR Office of Nuclear Material Safety and Safeguards


==Enclosure:==
==Enclosure:==
NRC comments on Draft Supplements 1
NRC comments on Draft Supplements 1
DFC :WMRP:mkb         :WMRP         :WMRP             :IEg           :I           :              :
DFC :WMRP:mkb
.....:.....___g.:...._______:_______..:...._____..:.                            _____:_____.....__._..........
:WMRP
NAME :DHedges         :JKen dy       :      p         :WAltman       : G imes     :              :
:WMRP
DATE :86/02/25         :02/h/96       :          6       :02/gf/86     :02/4 4/86   :              :
:IEg
1
:I
.....:.....___g.:...._______:_______..:...._____..:.
NAME :DHedges
:JKen dy p
:WAltman
: G imes DATE :86/02/25
:02/h/96 4
6
:02/gf/86
:02/4 /86 1


o     ; s   .,
o
I NRC STAFF COMMENTS ON DOE SUPPLEMENTS SUPPLEMENT N0. 2:   OVERVIEW OF QUALITY ASSURANCE ACTIVITIES Section 1.2: BaselineacceptancecriteriaJireneededtoenhanceuniformity between projects and allow for easier revihw of proposed plans, procedures, and manuals.
; s I
NRC STAFF COMMENTS ON DOE SUPPLEMENTS SUPPLEMENT N0. 2:
OVERVIEW OF QUALITY ASSURANCE ACTIVITIES Section 1.2: BaselineacceptancecriteriaJireneededtoenhanceuniformity between projects and allow for easier revihw of proposed plans, procedures, and manuals.
SUPPLEMENT NO. 3: CONTROL OF MEASURING AN.D TEST EGUIPMENT Section 1.1: Basic Requirement 12 and Supplement 12S-1 of ANSI /ASME NQA-1-1983 should be referenced.
SUPPLEMENT NO. 3: CONTROL OF MEASURING AN.D TEST EGUIPMENT Section 1.1: Basic Requirement 12 and Supplement 12S-1 of ANSI /ASME NQA-1-1983 should be referenced.
Section 1.2: The 00E supplement should specify the use of a measurement control program.
Section 1.2: The 00E supplement should specify the use of a measurement control program.
SUPPLEMENT NO. 5: QUALITY ASSURANCE ON (R&D) EXPERIMENTS Section 1.0 This supplement, as written, is of little regulatory interest to the NRC since it covers only non-licensed activities. However, with the addition of certain measures, the QA program described in this supplement would be a good starting point for a QA program for routine experiments and other R&D activity during site characterization.}}
SUPPLEMENT NO. 5: QUALITY ASSURANCE ON (R&D) EXPERIMENTS Section 1.0 This supplement, as written, is of little regulatory interest to the NRC since it covers only non-licensed activities. However, with the addition of certain measures, the QA program described in this supplement would be a good starting point for a QA program for routine experiments and other R&D activity during site characterization.}}

Latest revision as of 21:48, 7 December 2024

Forwards Addl Comments on DOE Draft Suppls to DOE Ofc of Geologic Repositories QA Plan Which Should Be Considered Along W/Comments Provided in Author
ML20203P955
Person / Time
Issue date: 03/07/1986
From: Linehan J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Purcell W
ENERGY, DEPT. OF
References
REF-WM-1 NUDOCS 8605080408
Download: ML20203P955 (2)


Text

,

Distribution: WM-86151 W,MRecgr -

WM Projed

/

.=ES/F rm3405

<f Dccket No.

WMRP r/f

~

y NMSS PDR V SBilhorn EBrowning Distribution'-

/CC/02/25 MJBell b ## J0 Bunting MRKnapp (Return to WM,623 SS)

JTGreeves JJLinehan William J. Purcell RRBoyle Director SMCoplan Office of Geologic Repositories JEKennedy Office of Civilian Radioactive RCook Waste Management PPresthol t U. S. Department of Energy TVerma RW-20 JGiarratana Washington, DC 20545 DHedges & r/f PDR

Dear Mr. Purcell:

WAltman BGrimes

SUBJECT:

NRC STAFF COMMENTS ON DEPARTMENT OF ENERGY DRAFT SUPPLEMENTS TO THE OFFICE OF GE0 LOGIC REPOSITORIES QUALITY ASSURANCE PLAN

Reference:

Letter to William J. Purcell dated February 12, 1986, from John J.

Linehan transmitting NRC staff comments on Department of Energy Draft Supplements to the Office of Geologic Repositories Quality Assurance Plan The reference letter provided formal comments of the U. S. Nuclear Regulatory Commission (NRC) staff review of the subject documents. This letter provides' additional NRC staff comments which should be considered along with those provided in the February 12, 1986 letter.

Sincerely, 4

John J. Linehan, Acting Chief Repository Projects Branch g o g s e60307 Division of Waste Management WM-1 PDR Office of Nuclear Material Safety and Safeguards

Enclosure:

NRC comments on Draft Supplements 1

DFC :WMRP:mkb

WMRP
WMRP
IEg
I

.....:.....___g.:...._______:_______..:...._____..:.

NAME :DHedges

JKen dy p
WAltman
G imes DATE :86/02/25
02/h/96 4

6

02/gf/86
02/4 /86 1

o

s I

NRC STAFF COMMENTS ON DOE SUPPLEMENTS SUPPLEMENT N0. 2:

OVERVIEW OF QUALITY ASSURANCE ACTIVITIES Section 1.2: BaselineacceptancecriteriaJireneededtoenhanceuniformity between projects and allow for easier revihw of proposed plans, procedures, and manuals.

SUPPLEMENT NO. 3: CONTROL OF MEASURING AN.D TEST EGUIPMENT Section 1.1: Basic Requirement 12 and Supplement 12S-1 of ANSI /ASME NQA-1-1983 should be referenced.

Section 1.2: The 00E supplement should specify the use of a measurement control program.

SUPPLEMENT NO. 5: QUALITY ASSURANCE ON (R&D) EXPERIMENTS Section 1.0 This supplement, as written, is of little regulatory interest to the NRC since it covers only non-licensed activities. However, with the addition of certain measures, the QA program described in this supplement would be a good starting point for a QA program for routine experiments and other R&D activity during site characterization.