TXX-4944, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters.Initially Reported on 860321.Next Rept Expected by 860926: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:._ | {{#Wiki_filter:._ | ||
Log # TXX-4944 File # 10110 910.3 TEXAS UTILITIES GENERATING COMPANY RKYWAY TO9/ER . 40J NORTH OI.JVE STREET. L.B. At . DALLAS. TEXA175201 July 30, 1986 | Log # TXX-4944 File # 10110 910.3 TEXAS UTILITIES GENERATING COMPANY RKYWAY TO9/ER. 40J NORTH OI.JVE STREET. L.B. At. DALLAS. TEXA175201 July 30, 1986 | ||
T'R@lROMEWV | ==== | ||
T'R@lROMEWV 7 | |||
Mr. Eric H. Johnson, Director | |||
611 Ryan Plaza Drive, Suite 1000 | ( | ||
M-lg l | |||
i Division of Reactor Safety and Projects J{' | |||
U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 E | |||
Arlington, TX 76012 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 29: | Line 33: | ||
==Dear Mr. Johnson:== | ==Dear Mr. Johnson:== | ||
On March 21, 1986, we notified you of a reportable item involving the installation of steam service pressure transmitters (see TXX-4824). This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e). | On March 21, 1986, we notified you of a reportable item involving the installation of steam service pressure transmitters (see TXX-4824). This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e). | ||
We anticipate completing our evaluation of all corrective action and submitting our next report by September 26, 1986. | We anticipate completing our evaluation of all corrective action and submitting our next report by September 26, 1986. | ||
Very truly yours, | Very truly yours, | ||
/ | |||
Director, Inspection & Enforcement (15 copies) | f W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 copy) | ||
U. S. Nuclear Regulatory Commission | Director, Inspection & Enforcement (15 copies) | ||
U. S. Nuclear Regulatory Commission 1 | |||
Washington, D.C. | |||
20555 8608080240 860730 PDR ADOCK 05000445 S | |||
PDR | |||
% k A DIVISION OF TEXAN UTELITIEN ELECTRIC COMP ANY | |||
_ _ _ _ _ _ _ _ _ _ _ _ _}} | _ _ _ _ _ _ _ _ _ _ _ _ _}} | ||
Latest revision as of 20:47, 7 December 2024
| ML20204H900 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/30/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-19, TXX-4944, NUDOCS 8608080240 | |
| Download: ML20204H900 (1) | |
Text
._
Log # TXX-4944 File # 10110 910.3 TEXAS UTILITIES GENERATING COMPANY RKYWAY TO9/ER. 40J NORTH OI.JVE STREET. L.B. At. DALLAS. TEXA175201 July 30, 1986
==
T'R@lROMEWV 7
Mr. Eric H. Johnson, Director
(
M-lg l
i Division of Reactor Safety and Projects J{'
U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 E
Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 PRESSURE INSTRUMENT INSTALLATIONS SDAR: CP-86-19 (INTERIM REPORT)
Dear Mr. Johnson:
On March 21, 1986, we notified you of a reportable item involving the installation of steam service pressure transmitters (see TXX-4824). This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e).
We anticipate completing our evaluation of all corrective action and submitting our next report by September 26, 1986.
Very truly yours,
/
f W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission 1
Washington, D.C.
20555 8608080240 860730 PDR ADOCK 05000445 S
% k A DIVISION OF TEXAN UTELITIEN ELECTRIC COMP ANY
_ _ _ _ _ _ _ _ _ _ _ _ _