OPERATING DATA REPORT | OPERATING DATA REPORT 4 | ||
DOCKET NO. | L DOCKET NO. | ||
50-443 DATE 11/02/88 COMPLETED BY P. Nardone | |||
OPERATING STATj)_SS | 'ELEPHONE (603) 474-9521 (Ext. 4078) | ||
OPERATING STATj)_SS 1. | |||
Unit Name: | |||
Seabrook Station Unit 1 l | |||
2. | |||
Reporting Period: | |||
OCTOBER 1988 3. | |||
Licensed Thermal P:wer (MWt): | |||
3411 4. | |||
Since Last Report, Give Reasons: | Nameplate Rating (G?oss MWe): | ||
1197 5. | |||
: 10. Reasons For Restrictions, If Any: License issued on 10/17/86 is a zero power license which a110ws fuel loading and performance of non-nuclear testing. | 02 sign Electrical Rating (Net MWe): | ||
t This Month | 1148 6. | ||
: 11. Hours In Reporting Period | Maximum Dependable Capacity (Gross MWe): | ||
: 12. Number Of Hours Reactor Was Critical | 1197 (Initial design value) 7. | ||
: 13. Reactor Reserve Shutdown Hours | Maximum Dependable Capacity (Net MWe): | ||
0.0 | 1148 (Initial design value) 8. | ||
: 14. Hours Generator On-Line | If Changes Occur in Capacity Ratings (!tems Number 3 Through 7) | ||
: 15. Unit Reserve Shutdown Hours | Since Last Report, Give Reasons: | ||
: 16. Gross Thermal Energy Cenerated (MWH) | Not Applicable 9. | ||
: 17. Gross Elec. Energy Gerierated (MWH) | Power Level To Which Restricted, If Any (Net MWe): | ||
: 18. Net Electrical Energy Generated (MWH) | Zero power i | ||
: 19. Unit Service Factor | : 10. Reasons For Restrictions, If Any: | ||
: 20. Unit Availability Factor | License issued on 10/17/86 is a zero power license which a110ws fuel loading and performance of non-nuclear testing. | ||
0.0 | t This Month Yr.-to-Date Cumulative | ||
: 21. Unit Capacity Factor (Using MOC Net) | : 11. Hours In Reporting Period 745.0 7320.0 17905.0 | ||
: 22. Unit Capacity Factor (Using DER Net) | : 12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0 | ||
: 23. Unit Forced Outage Rate | : 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 i | ||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | : 14. Hours Generator On-Line 0.0 0.0 0.0 | ||
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 | |||
: 16. Gross Thermal Energy Cenerated (MWH) 0 0 | |||
0 | |||
: 17. Gross Elec. Energy Gerierated (MWH) 0 0 | |||
0 | |||
: 18. Net Electrical Energy Generated (MWH) 0 0 | |||
0 | |||
: 19. Unit Service Factor 0.0 0.0 0.0 l | |||
: 20. Unit Availability Factor 0.0 0.0 0.0 | |||
~~ | |||
: 21. Unit Capacity Factor (Using MOC Net) 0.0 0.0 0.0 | |||
: 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 0.0 | |||
: 23. Unit Forced Outage Rate 0.0 0.0 0.0 | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | |||
i Not Scheduled | |||
[ | [ | ||
: 25. If Shut Down At End Of Repcrt Period, Estimated Date Of Startup: Not Asp 11 cable | : 25. If Shut Down At End Of Repcrt Period, Estimated Date Of Startup: Not Asp 11 cable | ||
: 26. Units In Test Status (Prior to Commercial Operation): Forecast | : 26. Units In Test Status (Prior to Commercial Operation): | ||
i 1 of 5 8911150245 gggo3g | Forecast Ac11eved t | ||
IN!T!AL CRITICALITY 1988 Not Applicable INITIAL ELECTRICITY 1988 Not Applicable l | |||
COMMERCIAL OPERATION 1988 Not Applicable i | |||
i 1 of 5 8911150245 gggo3g | |||
{DR Apocg ogono443 g | {DR Apocg ogono443 g | ||
PDC (L | PDC (L d. | ||
d. | |||
7 | 7 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | ||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | 50-443 UNIT Seabrook 1 DATE 11/02/88 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4078) | ||
MONTH | MONTH OCTOBER, 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) | ||
10 | (MWe-Nat) 1 0 | ||
1 INSTRUCTIONS | 16 0 | ||
2 0 | |||
17 0 | |||
3 0 | |||
18 0 | |||
4 0 | |||
19 0 | |||
5 0 | |||
20 0 | |||
6 | |||
, _,,0 21 0 | |||
7 u | |||
22 0 | |||
8 0 | |||
23 | |||
,,, 0 9 | |||
0 24 0 | |||
[ | |||
10 0 | |||
25 0 | |||
11 0 | |||
26 0 | |||
12 0 | |||
27 0 | |||
13 0 | |||
28 0 | |||
14 0 | |||
29 0 | |||
15 0 | |||
30 0 | |||
31 0 | |||
1 INSTRUCTIONS | |||
) | |||
On td.is format, list the average daily unit power level in MWe-Net for each day ir, the reporting month. Compute to the nearest whole megawatt. | On td.is format, list the average daily unit power level in MWe-Net for each day ir, the reporting month. Compute to the nearest whole megawatt. | ||
2 of 5 l | 2 of 5 l | ||
UNIT SHUTD00tS AND POWER REDUCTIONS | l UNIT SHUTD00tS AND POWER REDUCTIONS UNIT NME Seabrook 1 DATE 11/02/88 COMPLETED BY P. Nardone REPORT M0dTH OCTOBER, 1988 TELEPHONE (603) 474-9521 ^ " | ||
DATE | (Ext. 4078) 4 i | ||
COMPLETED BY | No. Date Typel Duration Reason 2 Method of Licensee Cause & Corrective (Hours) | ||
REPORT M0dTH | Shutting Event Action to l | ||
(Ext. 4078) 4 i | Down Reactor 3 Report # | ||
Prevent Recurrence i | |||
i, 4 | i, 4 | ||
I i | I i | ||
] | ] | ||
NOENTRIESFORTHISMOJN i | |||
1 1 | 1 1 | ||
1 1 | 1 1 | ||
S: Scheduled | 2 3 | ||
H-Other (Explain) | F: Forced Reason: | ||
Method: | |||
S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued from E-Operator Training & Licente Examination previous month F-Administrative 5-Power Reduction G-Operational Error (Explain) | |||
(Duration = 0) | |||
H-Other (Explain) 9-Other (Exp' air.) | |||
3 of 5 | 3 of 5 | ||
Dockat No. | Dockat No. | ||
Data | 50-443 Data 11/02/88 | ||
Unit Name | =l Unit Name Seabrook 1 Completed By P. Nardone l | ||
Telephone (603) 474-9521 (Ext. 4078) | |||
Completed By | CORRECTIVE MAINTENANCE SUMARY FOR SAFETY RELATED EQUIPMENT Page 1 of 1 | ||
Telephone (603) 474-9521 | ] | ||
(Ext. 4078) | 3 REPORT MONiH OCTOBER, 1988 L | ||
CORRECTIVE MAINTENANCE SUMARY FOR SAFETY RELATED EQUIPMENT | DATE SYSTEM COMPONENT MAINTENANCE ACTION 10/06/88 Nuclear 1-NI-NM-6690 Several power supply failures identified Instrumentation Train A during surveillance testing. Replacea PAM Nuclear defective power supplies at the signal Instrumectation processor and the amplifier. | ||
DATE | Chanrel l | ||
10/06/88 | 10/26/88 Auxiliary 1-AS-V-176 Motor operator failed to stroke valve. | ||
Chanrel 10/26/88 | Steam Train 8 Replaced defective worm shaft gear. | ||
Steam | HELB Isolation Valvd to PAB 1 | ||
HELB Isolation Valvd to PAB 10/28/88 | 10/28/88 Control 1-CBA-AC-5A Compressor tripped out during operation. | ||
Building | Building Train A Replaced defective compressor motor. | ||
Air | Air Control Room Air Conditioning Compressor 4 of 5 | ||
Docket No. | Docket No. | ||
50-443 Date: | |||
Telephone: ,(603) 474-9521 i | 11/02/88 Completed By: | ||
REFUELING INFORMATION REQUEST | P. Nardone Telephone:,(603) 474-9521 i | ||
t | (Ext. 4078) f REFUELING INFORMATION REQUEST t | ||
: 1. Name of facility: | : 1. Name of facility: | ||
: 2. Scheduled date for next refueling shutdown: Not Scheduled | Seabrook Unit 1 | ||
: 3. 3cheduled date for restart following refueling: Not Scheduled | : 2. Scheduled date for next refueling shutdown: Not Scheduled j | ||
: 4. Will refueling or resumption of operation thereafter require a technical | : 3. 3cheduled date for restart following refueling: Not Scheduled l | ||
: 4. Will refueling or resumption of operation thereafter require a technical | |||
+ | |||
specification change or other license amendment? | specification change or other license amendment? | ||
Unknown at this time. | Unknown at this time. | ||
: 5. Scheduled date(s) for submitting licensing action and supporting information: | i | ||
Not Applicable | : 5. Scheduled date(s) for submitting licensing action and supporting information: | ||
: 6. Important licensinc considerations associated with refueling, e.g. | I Not Applicable 7 | ||
: 6. Important licensinc considerations associated with refueling, e.g., | |||
new or different fuel design or supplier, unreviewed design # | |||
performanch analysis methods, significant changes in fuel design, | |||
) | |||
new operating procedures. | new operating procedures. | ||
None 4 | None 4 | ||
1 l | 1 l | ||
: 7. The number of fuel assemblies (a) in the core and (b) in the spent | : 7. The number of fuel assemblies (a) in the core and (b) in the spent j | ||
fuel storage pool: | |||
l | l (a) | ||
In Core: | |||
193 (b) 0 l | |||
: 8. The present licensed spent fuel pool storage capacity and the size of any in:rease in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: | : 8. The present licensed spent fuel pool storage capacity and the size of any in:rease in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: | ||
Present licensed capacity: 1236 | Present licensed capacity: | ||
No increase in storage capacity requested or planned. | 1236 No increase in storage capacity requested or planned. | ||
t l | |||
: 9. The projected dF*,e of the last refueling that can be discharged to | |||
} | |||
the spent fuel pool assuming the present licensed capacity: | |||
t l | t l | ||
Licensed capacity cf 1236 fuel assemblies based on sixteen refuelings and full core offload capability. | Licensed capacity cf 1236 fuel assemblies based on sixteen refuelings and full core offload capability. | ||
The current licensed capacity is adequate until at least the year 2007. | The current licensed capacity is adequate until at least the year 2007. | ||
5 of 5 | 5 of 5 | ||
.t George S. Thom<2s UI vice hepoentexw hodvenon Putse service of New Hampshire New Hampshire Yankee Division NYN-88147 November 7, 1988 United States Nuclear Regulatory Comission Washington, DC 10555 Attention: | |||
George S. Thom<2s vice hepoentexw hodvenon | Document Control Desk | ||
==Reference:== | ==Reference:== | ||
Facility Operating License No. NPF-56, Docket No. 50-443 Subjst.t | Facility Operating License No. NPF-56, Docket No. 50-443 Subjst.t Monthly Operating Report Gentiathen: | ||
In accordance with Technical Specification Section 6.8.1.5, enclosed please find Monthly Operating Report 88-10 covering the operation and shutdown experience relating to Seabrook Station Unit 1. | In accordance with Technical Specification Section 6.8.1.5, enclosed please find Monthly Operating Report 88-10 covering the operation and shutdown experience relating to Seabrook Station Unit 1. | ||
Very truly yours, e | Very truly yours, e | ||
l George S. Thomas Enclosure cc | l George S. Thomas Enclosure cc Regional Administrator Uni *td States Nuclear Regulatory Comission Re..-,s 1 631 Park Avenue King of Prussia, PA 19406 Mr. D. G. Ruscitto NRC Senior Resident Inspector Seabrook Station Seabrook. KH 03874 914 3 | ||
l P.O. Box 300 . Seabrook, NH 03874 . Telephone (603) 474 9574}} | i \\ | ||
l P.O. Box 300. Seabrook, NH 03874. Telephone (603) 474 9574}} | |||
Latest revision as of 02:31, 7 December 2024
| ML20206A749 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 10/31/1988 |
| From: | Nardone P, George Thomas PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NYN-88147, NUDOCS 8811150245 | |
| Download: ML20206A749 (6) | |
Text
,
OPERATING DATA REPORT 4
L DOCKET NO.
50-443 DATE 11/02/88 COMPLETED BY P. Nardone
'ELEPHONE (603) 474-9521 (Ext. 4078)
OPERATING STATj)_SS 1.
Unit Name:
Seabrook Station Unit 1 l
2.
Reporting Period:
OCTOBER 1988 3.
Licensed Thermal P:wer (MWt):
3411 4.
Nameplate Rating (G?oss MWe):
1197 5.
02 sign Electrical Rating (Net MWe):
1148 6.
Maximum Dependable Capacity (Gross MWe):
1197 (Initial design value) 7.
Maximum Dependable Capacity (Net MWe):
1148 (Initial design value) 8.
If Changes Occur in Capacity Ratings (!tems Number 3 Through 7)
Since Last Report, Give Reasons:
Not Applicable 9.
Power Level To Which Restricted, If Any (Net MWe):
Zero power i
- 10. Reasons For Restrictions, If Any:
License issued on 10/17/86 is a zero power license which a110ws fuel loading and performance of non-nuclear testing.
t This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 745.0 7320.0 17905.0
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 i
- 14. Hours Generator On-Line 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Cenerated (MWH) 0 0
0
- 17. Gross Elec. Energy Gerierated (MWH) 0 0
0
- 18. Net Electrical Energy Generated (MWH) 0 0
0
- 19. Unit Service Factor 0.0 0.0 0.0 l
- 20. Unit Availability Factor 0.0 0.0 0.0
~~
- 21. Unit Capacity Factor (Using MOC Net) 0.0 0.0 0.0
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 0.0
- 23. Unit Forced Outage Rate 0.0 0.0 0.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
i Not Scheduled
[
- 25. If Shut Down At End Of Repcrt Period, Estimated Date Of Startup: Not Asp 11 cable
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Ac11eved t
IN!T!AL CRITICALITY 1988 Not Applicable INITIAL ELECTRICITY 1988 Not Applicable l
COMMERCIAL OPERATION 1988 Not Applicable i
i 1 of 5 8911150245 gggo3g
{DR Apocg ogono443 g
PDC (L d.
7 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-443 UNIT Seabrook 1 DATE 11/02/88 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4078)
MONTH OCTOBER, 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Nat) 1 0
16 0
2 0
17 0
3 0
18 0
4 0
19 0
5 0
20 0
6
, _,,0 21 0
7 u
22 0
8 0
23
,,, 0 9
0 24 0
[
10 0
25 0
11 0
26 0
12 0
27 0
13 0
28 0
14 0
29 0
15 0
30 0
31 0
1 INSTRUCTIONS
)
On td.is format, list the average daily unit power level in MWe-Net for each day ir, the reporting month. Compute to the nearest whole megawatt.
2 of 5 l
l UNIT SHUTD00tS AND POWER REDUCTIONS UNIT NME Seabrook 1 DATE 11/02/88 COMPLETED BY P. Nardone REPORT M0dTH OCTOBER, 1988 TELEPHONE (603) 474-9521 ^ "
(Ext. 4078) 4 i
No. Date Typel Duration Reason 2 Method of Licensee Cause & Corrective (Hours)
Shutting Event Action to l
Down Reactor 3 Report #
Prevent Recurrence i
i, 4
I i
]
NOENTRIESFORTHISMOJN i
1 1
1 1
2 3
F: Forced Reason:
Method:
S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued from E-Operator Training & Licente Examination previous month F-Administrative 5-Power Reduction G-Operational Error (Explain)
(Duration = 0)
H-Other (Explain) 9-Other (Exp' air.)
3 of 5
Dockat No.
50-443 Data 11/02/88
=l Unit Name Seabrook 1 Completed By P. Nardone l
Telephone (603) 474-9521 (Ext. 4078)
CORRECTIVE MAINTENANCE SUMARY FOR SAFETY RELATED EQUIPMENT Page 1 of 1
]
3 REPORT MONiH OCTOBER, 1988 L
DATE SYSTEM COMPONENT MAINTENANCE ACTION 10/06/88 Nuclear 1-NI-NM-6690 Several power supply failures identified Instrumentation Train A during surveillance testing. Replacea PAM Nuclear defective power supplies at the signal Instrumectation processor and the amplifier.
Chanrel l
10/26/88 Auxiliary 1-AS-V-176 Motor operator failed to stroke valve.
Steam Train 8 Replaced defective worm shaft gear.
HELB Isolation Valvd to PAB 1
10/28/88 Control 1-CBA-AC-5A Compressor tripped out during operation.
Building Train A Replaced defective compressor motor.
Air Control Room Air Conditioning Compressor 4 of 5
Docket No.
50-443 Date:
11/02/88 Completed By:
P. Nardone Telephone:,(603) 474-9521 i
(Ext. 4078) f REFUELING INFORMATION REQUEST t
- 1. Name of facility:
Seabrook Unit 1
- 2. Scheduled date for next refueling shutdown: Not Scheduled j
- 3. 3cheduled date for restart following refueling: Not Scheduled l
- 4. Will refueling or resumption of operation thereafter require a technical
+
specification change or other license amendment?
Unknown at this time.
i
- 5. Scheduled date(s) for submitting licensing action and supporting information:
I Not Applicable 7
- 6. Important licensinc considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design #
performanch analysis methods, significant changes in fuel design,
)
new operating procedures.
None 4
1 l
- 7. The number of fuel assemblies (a) in the core and (b) in the spent j
fuel storage pool:
l (a)
In Core:
193 (b) 0 l
- 8. The present licensed spent fuel pool storage capacity and the size of any in:rease in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity:
1236 No increase in storage capacity requested or planned.
t l
- 9. The projected dF*,e of the last refueling that can be discharged to
}
the spent fuel pool assuming the present licensed capacity:
t l
Licensed capacity cf 1236 fuel assemblies based on sixteen refuelings and full core offload capability.
The current licensed capacity is adequate until at least the year 2007.
5 of 5
.t George S. Thom<2s UI vice hepoentexw hodvenon Putse service of New Hampshire New Hampshire Yankee Division NYN-88147 November 7, 1988 United States Nuclear Regulatory Comission Washington, DC 10555 Attention:
Document Control Desk
Reference:
Facility Operating License No. NPF-56, Docket No. 50-443 Subjst.t Monthly Operating Report Gentiathen:
In accordance with Technical Specification Section 6.8.1.5, enclosed please find Monthly Operating Report 88-10 covering the operation and shutdown experience relating to Seabrook Station Unit 1.
Very truly yours, e
l George S. Thomas Enclosure cc Regional Administrator Uni *td States Nuclear Regulatory Comission Re..-,s 1 631 Park Avenue King of Prussia, PA 19406 Mr. D. G. Ruscitto NRC Senior Resident Inspector Seabrook Station Seabrook. KH 03874 914 3
i \\