ML20206L781: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_ _ - _ _ _ _ _ _ - _ _ _ | {{#Wiki_filter:_ _ - _ _ _ _ _ _ - _ _ _ | ||
TENNECSEE VALLEY AUTHORITY | TENNECSEE VALLEY AUTHORITY CH ATTANOOGA, TENNESSEE 37a01 5W 157B Lookout Place i | ||
NOV 201988 U.S. Nuclear Regulatory Comlesion ATTH: Document Control Donk Washirston, D.C. | |||
NOV 201988 U.S. Nuclear Regulatory Comlesion ATTH: Document Control Donk Washirston, D.C. 20555 centlement l | 20555 centlement l | ||
In the Matter of | In the Matter of | ||
Tennessee Valley Authority | ) | ||
Docket Hos. 50-327 Tennessee Valley Authority | |||
suction-pressure, low-trip setpoint and allowable value of table 3.3-4 (units 1 and 2) for the turbine-driven purp. | ) | ||
proposed change, NRC has detemlnud that the logic time delays assoch:ted with | 50-328 SEQUOYAll NUCLEAR PLANT (SQN) - TECHNICAL OPECIFICATION CilANCE 87 SUPPLEMENTAL INFORMATION j | ||
the suction transfer of the turbine-driven and mo'.or-drLven AFW purps should also be included in the technical specifications. | ' deference: TVA's letter to NLC dated November 17, 1987. "Sequoyah Nuclear plant (9QN) - Technical Spectfleation Change 87-40" The reference transmLtted a proposed revision to the auxiliary feedwater (AW) suction-pressure, low-trip setpoint and allowable value of table 3.3-4 (units 1 and 2) for the turbine-driven purp. | ||
TVA will autrmLt a proposed technical specification change to add appropriate | As part of their review of the proposed change, NRC has detemlnud that the logic time delays assoch:ted with the suction transfer of the turbine-driven and mo'.or-drLven AFW purps should also be included in the technical specifications. | ||
I Summary statements of comitments contained in this submittal are provided in i | TVA will autrmLt a proposed technical specification change to add appropriate i | ||
j requirements t ir the AW suction transfer logic time delays. Based on the l | |||
i current workload associated with the unit 2 cycle 3 refueling outage, the l | |||
proposed change is expected to be submitted by June 1, 1989, i | |||
I Summary statements of comitments contained in this submittal are provided in i | |||
enclosure 1. | |||
Please direct questions concernLng this 1. sue to R. R. Thompson at (615) 843-7470. | |||
f i | |||
Very tmly yourJ. | Very tmly yourJ. | ||
TENNESSEE VALLEY AUTil0RITY | TENNESSEE VALLEY AUTil0RITY | ||
) | |||
R. Crldley, nager 4 | |||
Nuclear Licensing and l | Nuclear Licensing and l | ||
Regulatory Affairs Enclosure | Regulatory Affairs Enclosure cc: See page 2 j | ||
cc: See page 2 | 4 i | ||
c00 | c00 8811300243 001123 01 l | ||
i PDR | i PDR ADOCK 050 37 j | ||
P 1 | |||
An Equal Opportunity Employer 4 | |||
O J.S. Nuclear Regulatory Commission ec (Enclosure): | |||
MA. S. C. Black Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockvillo Pike Rockville, Maryland 20852 L | |||
MA. S. C. Black Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission | Mr. F. R. McCoy, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW, Suite 2900 L | ||
One White Flint, North 11555 Rockvillo Pike Rockville, Maryland 20852 | Atlanta, Georgia 30323 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 | ||
Region 11 101 Marietta Street, NW, Suite 2900 | ) | ||
i P | i P | ||
i r | i r | ||
i | i | ||
? | |||
ENCLOSURE TVA will submit a proposed technical specification chance to add appropriate requlteu nts for the AFW suction transfer logic time delays. Based on the current workload associated with the unit 2 cycle 3 refueling outagn, the propond thange is expected to be suhnLLled by June 1,1989. | ENCLOSURE TVA will submit a proposed technical specification chance to add appropriate requlteu nts for the AFW suction transfer logic time delays. | ||
Based on the current workload associated with the unit 2 cycle 3 refueling outagn, the propond thange is expected to be suhnLLled by June 1,1989. | |||
t 1 | t 1 | ||
i i | i i | ||
| Line 57: | Line 65: | ||
I l | I l | ||
J | J | ||
\\ | |||
l I | l I | ||
l i | l i | ||
i I | i I | ||
l l | l l | ||
l i | |||
4 l | 4 l | ||
l i | l i | ||
l l | l l | ||
? | ? | ||
L | |||
_ _ _ _ _ _ _ _ . _ _ _}} | _ _ _ _ _ _ _ _. _ _ _}} | ||
Latest revision as of 00:34, 7 December 2024
| ML20206L781 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 11/23/1988 |
| From: | Gridley R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8811300243 | |
| Download: ML20206L781 (3) | |
Text
_ _ - _ _ _ _ _ _ - _ _ _
TENNECSEE VALLEY AUTHORITY CH ATTANOOGA, TENNESSEE 37a01 5W 157B Lookout Place i
NOV 201988 U.S. Nuclear Regulatory Comlesion ATTH: Document Control Donk Washirston, D.C.
20555 centlement l
In the Matter of
)
Docket Hos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAll NUCLEAR PLANT (SQN) - TECHNICAL OPECIFICATION CilANCE 87 SUPPLEMENTAL INFORMATION j
' deference: TVA's letter to NLC dated November 17, 1987. "Sequoyah Nuclear plant (9QN) - Technical Spectfleation Change 87-40" The reference transmLtted a proposed revision to the auxiliary feedwater (AW) suction-pressure, low-trip setpoint and allowable value of table 3.3-4 (units 1 and 2) for the turbine-driven purp.
As part of their review of the proposed change, NRC has detemlnud that the logic time delays assoch:ted with the suction transfer of the turbine-driven and mo'.or-drLven AFW purps should also be included in the technical specifications.
TVA will autrmLt a proposed technical specification change to add appropriate i
j requirements t ir the AW suction transfer logic time delays. Based on the l
i current workload associated with the unit 2 cycle 3 refueling outage, the l
proposed change is expected to be submitted by June 1, 1989, i
I Summary statements of comitments contained in this submittal are provided in i
enclosure 1.
Please direct questions concernLng this 1. sue to R. R. Thompson at (615) 843-7470.
f i
Very tmly yourJ.
TENNESSEE VALLEY AUTil0RITY
)
R. Crldley, nager 4
Nuclear Licensing and l
Regulatory Affairs Enclosure cc: See page 2 j
4 i
c00 8811300243 001123 01 l
i PDR ADOCK 050 37 j
P 1
An Equal Opportunity Employer 4
O J.S. Nuclear Regulatory Commission ec (Enclosure):
MA. S. C. Black Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockvillo Pike Rockville, Maryland 20852 L
Mr. F. R. McCoy, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW, Suite 2900 L
Atlanta, Georgia 30323 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379
)
i P
i r
i
?
ENCLOSURE TVA will submit a proposed technical specification chance to add appropriate requlteu nts for the AFW suction transfer logic time delays.
Based on the current workload associated with the unit 2 cycle 3 refueling outagn, the propond thange is expected to be suhnLLled by June 1,1989.
t 1
i i
W I
1 b
I l
J
\\
l I
l i
i I
l l
l i
4 l
l i
l l
?
L
_ _ _ _ _ _ _ _. _ _ _