ML20206L781: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:_ _ - _ _ _ _ _ _ - _ _ _                   _          _            _    _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _                    _ _ _ _ _ _ _ _ _ _ _ _ - - _ - _ _ _ _ _ _ __
{{#Wiki_filter:_ _ - _ _ _ _ _ _ - _ _ _
TENNECSEE VALLEY AUTHORITY
TENNECSEE VALLEY AUTHORITY CH ATTANOOGA, TENNESSEE 37a01 5W 157B Lookout Place i
* CH ATTANOOGA, TENNESSEE 37a01 5W 157B Lookout Place i
NOV 201988 U.S. Nuclear Regulatory Comlesion ATTH: Document Control Donk Washirston, D.C.
NOV 201988 U.S. Nuclear Regulatory Comlesion ATTH: Document Control Donk Washirston, D.C. 20555 centlement l
20555 centlement l
In the Matter of                                   )                                                   Docket Hos. 50-327                                         !
In the Matter of
Tennessee Valley Authority                           )                                                                                                       50-328 SEQUOYAll NUCLEAR PLANT (SQN) - TECHNICAL OPECIFICATION CilANCE 87                                   SUPPLEMENTAL INFORMATION                                                                                                                                             j
)
                                  ' deference: TVA's letter to NLC dated November 17, 1987. "Sequoyah Nuclear plant (9QN) - Technical Spectfleation Change 87-40" The reference transmLtted a proposed revision to the auxiliary feedwater (AW)                                                                                       ,
Docket Hos. 50-327 Tennessee Valley Authority
suction-pressure, low-trip setpoint and allowable value of table 3.3-4 (units 1 and 2) for the turbine-driven purp.                                             As part of their review of the                                           !
)
proposed change, NRC has detemlnud that the logic time delays assoch:ted with                                                                                       ,
50-328 SEQUOYAll NUCLEAR PLANT (SQN) - TECHNICAL OPECIFICATION CilANCE 87 SUPPLEMENTAL INFORMATION j
the suction transfer of the turbine-driven and mo'.or-drLven AFW purps should also be included in the technical specifications.
' deference: TVA's letter to NLC dated November 17, 1987. "Sequoyah Nuclear plant (9QN) - Technical Spectfleation Change 87-40" The reference transmLtted a proposed revision to the auxiliary feedwater (AW) suction-pressure, low-trip setpoint and allowable value of table 3.3-4 (units 1 and 2) for the turbine-driven purp.
TVA will autrmLt a proposed technical specification change to add appropriate                                                                                       i j                               requirements t ir the AW suction transfer logic time delays. Based on the                                                                                           l i                                 current workload associated with the unit 2 cycle 3 refueling outage, the l                               proposed change is expected to be submitted by June 1, 1989, i
As part of their review of the proposed change, NRC has detemlnud that the logic time delays assoch:ted with the suction transfer of the turbine-driven and mo'.or-drLven AFW purps should also be included in the technical specifications.
I Summary statements of comitments contained in this submittal are provided in i                               enclosure 1. Please direct questions concernLng this 1. sue to R. R. Thompson at (615) 843-7470.                                                                                                                                                   f i
TVA will autrmLt a proposed technical specification change to add appropriate i
j requirements t ir the AW suction transfer logic time delays. Based on the l
i current workload associated with the unit 2 cycle 3 refueling outage, the l
proposed change is expected to be submitted by June 1, 1989, i
I Summary statements of comitments contained in this submittal are provided in i
enclosure 1.
Please direct questions concernLng this 1. sue to R. R. Thompson at (615) 843-7470.
f i
Very tmly yourJ.
Very tmly yourJ.
TENNESSEE VALLEY AUTil0RITY
TENNESSEE VALLEY AUTil0RITY
                                                                                                                                        )
)
4 R. Crldley,                                     nager                                                             .
R. Crldley, nager 4
Nuclear Licensing and l
Nuclear Licensing and l
Regulatory Affairs Enclosure 4
Regulatory Affairs Enclosure cc: See page 2 j
cc: See page 2                                                                                                                                                       j i
4 i
c00 l                    8811300243 00112337                                                                                                                                                          01 '
c00 8811300243 001123 01 l
i PDR             ADOCK 050                                                                                                                                                     j P
i PDR ADOCK 050 37 j
1 An Equal Opportunity Employer 4
P 1
An Equal Opportunity Employer 4


. O
O J.S. Nuclear Regulatory Commission ec (Enclosure):
  . J.S. Nuclear Regulatory Commission ec (Enclosure):                                                                                                                 '
MA. S. C. Black Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockvillo Pike Rockville, Maryland 20852 L
MA. S. C. Black Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission                                                                                         .
Mr. F. R. McCoy, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW, Suite 2900 L
One White Flint, North 11555 Rockvillo Pike Rockville, Maryland 20852                                                                                                 L Mr. F. R. McCoy, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission                                                                                         !
Atlanta, Georgia 30323 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379
Region 11 101 Marietta Street, NW, Suite 2900                                                                                       L Atlanta, Georgia 30323 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379                                                                                               ;
)
                                                                                                                                        )
i P
i P
i r
i r
i
i
                                                                                                                                        ?
?


ENCLOSURE TVA will submit a proposed technical specification chance to add appropriate requlteu nts for the AFW suction transfer logic time delays. Based on the current workload associated with the unit 2 cycle 3 refueling outagn, the propond thange is expected to be suhnLLled by June 1,1989.
ENCLOSURE TVA will submit a proposed technical specification chance to add appropriate requlteu nts for the AFW suction transfer logic time delays.
Based on the current workload associated with the unit 2 cycle 3 refueling outagn, the propond thange is expected to be suhnLLled by June 1,1989.
t 1
t 1
i i
i i
Line 57: Line 65:
I l
I l
J
J
                                                                                                                                                                        \
\\
l I
l I
l i
l i
i I
i I
l l                                                                                                                                                                       l i
l l
l i
4 l
4 l
l i
l i
l l
l l
?
?
l L
L
_ _ _ _ _ _ _ _ . _ _ _}}
_ _ _ _ _ _ _ _. _ _ _}}

Latest revision as of 00:34, 7 December 2024

Advises That Util Will Submit Proposed Change to Tech Spec Table 3.3-4 to Include Logic Time Delays Associated W/ Suction Transfer of turbine-driven & motor-driven Auxiliary Feedwater Pumps by 890601,per NRC Determination
ML20206L781
Person / Time
Site: Sequoyah  
Issue date: 11/23/1988
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8811300243
Download: ML20206L781 (3)


Text

_ _ - _ _ _ _ _ _ - _ _ _

TENNECSEE VALLEY AUTHORITY CH ATTANOOGA, TENNESSEE 37a01 5W 157B Lookout Place i

NOV 201988 U.S. Nuclear Regulatory Comlesion ATTH: Document Control Donk Washirston, D.C.

20555 centlement l

In the Matter of

)

Docket Hos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAll NUCLEAR PLANT (SQN) - TECHNICAL OPECIFICATION CilANCE 87 SUPPLEMENTAL INFORMATION j

' deference: TVA's letter to NLC dated November 17, 1987. "Sequoyah Nuclear plant (9QN) - Technical Spectfleation Change 87-40" The reference transmLtted a proposed revision to the auxiliary feedwater (AW) suction-pressure, low-trip setpoint and allowable value of table 3.3-4 (units 1 and 2) for the turbine-driven purp.

As part of their review of the proposed change, NRC has detemlnud that the logic time delays assoch:ted with the suction transfer of the turbine-driven and mo'.or-drLven AFW purps should also be included in the technical specifications.

TVA will autrmLt a proposed technical specification change to add appropriate i

j requirements t ir the AW suction transfer logic time delays. Based on the l

i current workload associated with the unit 2 cycle 3 refueling outage, the l

proposed change is expected to be submitted by June 1, 1989, i

I Summary statements of comitments contained in this submittal are provided in i

enclosure 1.

Please direct questions concernLng this 1. sue to R. R. Thompson at (615) 843-7470.

f i

Very tmly yourJ.

TENNESSEE VALLEY AUTil0RITY

)

R. Crldley, nager 4

Nuclear Licensing and l

Regulatory Affairs Enclosure cc: See page 2 j

4 i

c00 8811300243 001123 01 l

i PDR ADOCK 050 37 j

P 1

An Equal Opportunity Employer 4

O J.S. Nuclear Regulatory Commission ec (Enclosure):

MA. S. C. Black Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockvillo Pike Rockville, Maryland 20852 L

Mr. F. R. McCoy, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW, Suite 2900 L

Atlanta, Georgia 30323 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379

)

i P

i r

i

?

ENCLOSURE TVA will submit a proposed technical specification chance to add appropriate requlteu nts for the AFW suction transfer logic time delays.

Based on the current workload associated with the unit 2 cycle 3 refueling outagn, the propond thange is expected to be suhnLLled by June 1,1989.

t 1

i i

W I

1 b

I l

J

\\

l I

l i

i I

l l

l i

4 l

l i

l l

?

L

_ _ _ _ _ _ _ _. _ _ _