W3P86-1945, Forwards Supplemental Response to NRC Re Violations Noted in Insp Rept 50-382/86-05.Corrective Actions:Ltrs Issued Re Lack of Adequate Radiation Work Permits & Test Procedure Developed to Include Leak Checks: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:'. | {{#Wiki_filter:'. | ||
h | h | ||
P. O. BOX 60340 | $ hb AUS I 91986 8* | ||
LO UISI AN A / 317 BARONNE STREET P. O. BOX 60340 (504) 595-3100 POWER & L1GHT NEW ORLEANS, LOUISIANA 70160 ESONsysYdU August 15, 1986 W3P86-1945 A4.05 QA Mr. Robert D. Martin Regional Administrater, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 | |||
==Subject:== | ==Subject:== | ||
| Line 31: | Line 29: | ||
==Dear Mr. Martin:== | ==Dear Mr. Martin:== | ||
Attached is the Louisiana Power & Light Company (LP&L) supplemental response to Violation No. 8605-01 which was requested by NRC {{letter dated|date=July 7, 1986|text=letter dated July 7, 1986}}, J.E. Gagliardo to G.W. Muench. | Attached is the Louisiana Power & Light Company (LP&L) supplemental response to Violation No. 8605-01 which was requested by NRC {{letter dated|date=July 7, 1986|text=letter dated July 7, 1986}}, J.E. Gagliardo to G.W. Muench. | ||
If you have any questions on the response, please contact G.E. Wulle:, | If you have any questions on the response, please contact G.E. Wulle:, | ||
Onsite Licensing, at (504) 464-3499. | Onsite Licensing, at (504) 464-3499. | ||
Very truly yours, | Very truly yours, | ||
/ | |||
K.W. Cook | K.W. Cook i | ||
B.W. Churchill | Nuclear Support & Licensing Manager KWC:KLB:ssf Attachment cc: NRC, Director, Office of I&E G.W. Knighton, NRC-NRR J.II. Wilson, NRC-NRR NRC Resident Inspectors Office B.W. Churchill g | ||
88A82/885SISShim 0 | W.M. Stevenson | ||
\\ | |||
88A82/885SISShim h | |||
0 "AN EQUAL OPPORTUNITY EMPLOYER" gl 1 e 1 y1 - gr. | |||
1 | |||
r- | r- | ||
*~ | |||
h | h ATTACHMENT to W3P86-1945 Sheet 1 of 1 LP&L SUPPLEMENTAL RESPONSE TO VIOLATION NO. 8605-01 NRC Request for Additional Information In response to the LP&L response to Violation No. 86G3-01, the NRC requested that additional inforestion be provided, "Specifically. ycu should address corrective actions associated with performance of the work without an adequate RWP and test procedure as required by the NOV." | ||
LP&L Supplemental Response (1) Corrective Action That Will Be Taken Regarding che lack of an adequate RWP, LP&L will issue two letters. | LP&L Supplemental Response (1) Corrective Action That Will Be Taken Regarding che lack of an adequate RWP, LP&L will issue two letters. | ||
The first letter will be issued to all plant personnel and they will be directed to ensure that they keep Operations personnel cognizant of work in progress and that Health Physics personnel are made aware of changes to the scope of work covered under a specific Radiation Work Permit particularly if such change increases the potential for changing the radiological conditions in the work area. | The first letter will be issued to all plant personnel and they will be directed to ensure that they keep Operations personnel cognizant of work in progress and that Health Physics personnel are made aware of changes to the scope of work covered under a specific Radiation Work Permit particularly if such change increases the potential for changing the radiological conditions in the work area. | ||
The second letter will be issued to appropriate Health Physica personnel to remind them of the importance of ensuring thet they are knorledgeable of the total scope of a job to be performed inside the RCA and that they evaluate potential adverse consequences of such work particularly with regard to the need for additional radiological ronitoring of the work area. | The second letter will be issued to appropriate Health Physica personnel to remind them of the importance of ensuring thet they are knorledgeable of the total scope of a job to be performed inside the RCA and that they evaluate potential adverse consequences of such work particularly with regard to the need for additional radiological ronitoring of the work area. | ||
A test procedure for Station Modification SM-818 has been developed which includes checks for leakage and crossed lines as well as provides for an integrated functional test of the system. This test procedure is expected to be reviewed and approved by PORC before August 22, 1986. | A test procedure for Station Modification SM-818 has been developed which includes checks for leakage and crossed lines as well as provides for an integrated functional test of the system. | ||
This test procedure is expected to be reviewed and approved by PORC before August 22, 1986. | |||
(2) Date When Full Compliance Will Be Achieved The two letters will be issued by September 15, 1986 and this will achieve full compliance.}} | (2) Date When Full Compliance Will Be Achieved The two letters will be issued by September 15, 1986 and this will achieve full compliance.}} | ||
Latest revision as of 00:04, 7 December 2024
| ML20206P098 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/15/1986 |
| From: | Cook K LOUISIANA POWER & LIGHT CO. |
| To: | Martin R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| W3P86-1945, NUDOCS 8608270094 | |
| Download: ML20206P098 (2) | |
Text
'.
h
$ hb AUS I 91986 8*
LO UISI AN A / 317 BARONNE STREET P. O. BOX 60340 (504) 595-3100 POWER & L1GHT NEW ORLEANS, LOUISIANA 70160 ESONsysYdU August 15, 1986 W3P86-1945 A4.05 QA Mr. Robert D. Martin Regional Administrater, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 NRC Inspection Report 86-05
Reference:
LP&L response to Violation 8605-01 in letter W3P86-00/2, dated 5/2/86, K.W. Cook to R.D. Martin, NRC Region IV.
Dear Mr. Martin:
Attached is the Louisiana Power & Light Company (LP&L) supplemental response to Violation No. 8605-01 which was requested by NRC letter dated July 7, 1986, J.E. Gagliardo to G.W. Muench.
If you have any questions on the response, please contact G.E. Wulle:,
Onsite Licensing, at (504) 464-3499.
Very truly yours,
/
K.W. Cook i
Nuclear Support & Licensing Manager KWC:KLB:ssf Attachment cc: NRC, Director, Office of I&E G.W. Knighton, NRC-NRR J.II. Wilson, NRC-NRR NRC Resident Inspectors Office B.W. Churchill g
W.M. Stevenson
\\
88A82/885SISShim h
0 "AN EQUAL OPPORTUNITY EMPLOYER" gl 1 e 1 y1 - gr.
1
r-
- ~
h ATTACHMENT to W3P86-1945 Sheet 1 of 1 LP&L SUPPLEMENTAL RESPONSE TO VIOLATION NO. 8605-01 NRC Request for Additional Information In response to the LP&L response to Violation No. 86G3-01, the NRC requested that additional inforestion be provided, "Specifically. ycu should address corrective actions associated with performance of the work without an adequate RWP and test procedure as required by the NOV."
LP&L Supplemental Response (1) Corrective Action That Will Be Taken Regarding che lack of an adequate RWP, LP&L will issue two letters.
The first letter will be issued to all plant personnel and they will be directed to ensure that they keep Operations personnel cognizant of work in progress and that Health Physics personnel are made aware of changes to the scope of work covered under a specific Radiation Work Permit particularly if such change increases the potential for changing the radiological conditions in the work area.
The second letter will be issued to appropriate Health Physica personnel to remind them of the importance of ensuring thet they are knorledgeable of the total scope of a job to be performed inside the RCA and that they evaluate potential adverse consequences of such work particularly with regard to the need for additional radiological ronitoring of the work area.
A test procedure for Station Modification SM-818 has been developed which includes checks for leakage and crossed lines as well as provides for an integrated functional test of the system.
This test procedure is expected to be reviewed and approved by PORC before August 22, 1986.
(2) Date When Full Compliance Will Be Achieved The two letters will be issued by September 15, 1986 and this will achieve full compliance.