MATUME TRfJ3MITTED HERUM CWif pnmmm U. S. NUCLEAR REGULATORY COMMISSION REGION V Report No. 70-33/86-004 (IE-V-780)
MATUME TRfJ3MITTED HERUM CWif pnmmm U. S. NUCLEAR REGULATORY COMMISSION REGION V Report No. 70-33/86-004 (IE-V-780)
Docket No. 70-36 License No. SNM-33 Safeguards Group:     III Licensee: Combustion Engineering, Inc.
Docket No. 70-36 License No. SNM-33 Safeguards Group:
C-E Power Systems P. O. Box 107 Hematite, Missouri 63047 Facility Name:     Hematite LEU Fuel Facility Inspection At:     Region V U.S. Nuclear Regulatory Commission, Walnut Creek, California Inspection Conducted:       November 3 through 28 and December 3, 1986 Dates of Last Material Control and Accounting Inspection:                     July 7 through August 12, 1986 Type of Inspection:     Routine Unannounced In-Office MC&A Safeguards Inspector:     '
III Licensee: Combustion Engineering, Inc.
hM B. Welson, Chemist
C-E Power Systems P. O. Box 107 Hematite, Missouri 63047 Facility Name:
                                                                                            /b /Y' 88 Date Signed
Hematite LEU Fuel Facility Inspection At:
                                ~
Region V U.S. Nuclear Regulatory Commission, Walnut Creek, California Inspection Conducted:
Approved by:                                               . ,
November 3 through 28 and December 3, 1986 Dates of Last Material Control and Accounting Inspection:
t(Q.4A,         ll'/4-f6 6A M. D. Schuster, Chief                             '
July 7 through August 12, 1986 Type of Inspection:
Date Signed Safeguards Section Summary:
Routine Unannounced In-Office MC&A Safeguards Inspector:
hM
/b /Y' 88 B. Welson, Chemist Date Signed Approved by:
~
t(Q.4A, ll'/4-f6 6A M. D. Schuster, Chief Date Signed Safeguards Section Summary:
Inspection on November 3 through 28 and December 3, 1986 (70-36/86-004)
Inspection on November 3 through 28 and December 3, 1986 (70-36/86-004)
Areas Inspected: Measurement systems and entrance and exit meetings.                       During the inspection, inspection procedures 85207 and 30703 were used.
Areas Inspected:
Measurement systems and entrance and exit meetings.
During the inspection, inspection procedures 85207 and 30703 were used.
Results: Within the area inspected, no violation or deviations were identified.
Results: Within the area inspected, no violation or deviations were identified.
8612300351 861219
8612300351 861219
{DR ADOCK 07000036 PDR dT[RIA[ TRfJGMITTEU NUM @M L@ Eif@@.IN}}
{DR ADOCK 07000036 PDR dT[RIA[ TRfJGMITTEU NUM @M L@ Eif@@.IN}}

Latest revision as of 22:11, 6 December 2024

Partially Withheld Insp Rept 70-0036/86-04 on 861103-28 & 1203 (Ref 10CFR2.790(d)).No Violations or Deviations Noted. Major Areas Inspected:Measurement Sys & Entrance & Exit Meetings
ML20207D216
Person / Time
Site: 07000036
Issue date: 12/19/1986
From: Nelson G, Schuster M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19292G501 List:
References
70-0036-86-04, 70-36-86-4, NUDOCS 8612300351
Download: ML20207D216 (1)


Text

_

MATUME TRfJ3MITTED HERUM CWif pnmmm U. S. NUCLEAR REGULATORY COMMISSION REGION V Report No. 70-33/86-004 (IE-V-780)

Docket No. 70-36 License No. SNM-33 Safeguards Group:

III Licensee: Combustion Engineering, Inc.

C-E Power Systems P. O. Box 107 Hematite, Missouri 63047 Facility Name:

Hematite LEU Fuel Facility Inspection At:

Region V U.S. Nuclear Regulatory Commission, Walnut Creek, California Inspection Conducted:

November 3 through 28 and December 3, 1986 Dates of Last Material Control and Accounting Inspection:

July 7 through August 12, 1986 Type of Inspection:

Routine Unannounced In-Office MC&A Safeguards Inspector:

hM

/b /Y' 88 B. Welson, Chemist Date Signed Approved by:

~

t(Q.4A, ll'/4-f6 6A M. D. Schuster, Chief Date Signed Safeguards Section Summary:

Inspection on November 3 through 28 and December 3, 1986 (70-36/86-004)

Areas Inspected:

Measurement systems and entrance and exit meetings.

During the inspection, inspection procedures 85207 and 30703 were used.

Results: Within the area inspected, no violation or deviations were identified.