ML20207E472: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:g | {{#Wiki_filter:g June 1, 1999 i | ||
David M. Main, Vice President Arvin Industries, Inc.- | |||
One Noblitt Plaza, Box 3000 Columbus, IN 47202-3002 | One Noblitt Plaza, Box 3000 Columbus, IN 47202-3002 | ||
| Line 26: | Line 26: | ||
==Dear Mr. Main:== | ==Dear Mr. Main:== | ||
This refers to the inspection conducted on April 23,1999, at your Greenwood, Indiana, facility. The inspection was to review the circumstance associated with the reported loss / theft of a Loran Control Systems, Model 5310 thickness gauge containing 1.0 curie (37 gigabecquerels (GBq)) of americium-214 that was reported to the NRC on April 10,1999. At the conclusion of the inspection the preliminary findings were discussed with | This refers to the inspection conducted on April 23,1999, at your Greenwood, Indiana, facility. The inspection was to review the circumstance associated with the reported loss / theft of a Loran Control Systems, Model 5310 thickness gauge containing 1.0 curie (37 gigabecquerels (GBq)) of americium-214 that was reported to the NRC on April 10,1999. At the conclusion of the inspection the preliminary findings were discussed with | ||
. you and your staff and on May 26,1999, the results of the inspection were discussed with you and Larry Mackey. | |||
The enclosed copy of our inspection report identifies areas examined during the inspection. | The enclosed copy of our inspection report identifies areas examined during the inspection. | ||
Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel. | Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel. | ||
The two apparent violations identified during our April 23,1999 inspection, see enclosed Inspectin: 43 ort 999-90003/99002(DNMS), are currently under review by the NRC. You will be notifs 0 W separate correspondence regarding the results of our review. | The two apparent violations identified during our April 23,1999 inspection, see enclosed Inspectin: 43 ort 999-90003/99002(DNMS), are currently under review by the NRC. You will be notifs 0 W separate correspondence regarding the results of our review. | ||
In accordoce with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter and the enclosure will be placed in the NRC Public Document Room. | In accordoce with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter and the enclosure will be placed in the NRC Public Document Room. | ||
i We will gladly discuss any questions you have conceming this inspection. | i We will gladly discuss any questions you have conceming this inspection. | ||
Sincerely, | 1 Sincerely, | ||
/s/ G.C. Wright for 9906070049 990601 RE03 GA999 EMV***** | |||
99990003 | 99990003 PDR Cynthia D. Pederson, Director Division of Nuclear Materials Safety i | ||
Docket No. 999-90003 | Docket No. 999-90003 | ||
) | |||
General License (10 CFR 31.5) i | |||
==Enclosure:== | ==Enclosure:== | ||
Inspection Report 999-90003/99002(DNMS) cc w/ encl: | Inspection Report 999-90003/99002(DNMS) cc w/ encl: | ||
L. Mackey, Esq., Bames & Thornburg DOCUMENT NAME: G;\\SEC\\99990003.991 To receive a copy of this document, indicate in the box;"C" = Copy without enclosure "E"= Copy with enclosure *N"= No copy bFFICE Rill Rlli l | |||
01 l | |||
Rill l | |||
NAME Wiedeman:LE Wright Paul Pederson DATE 06/01/99 06/01/99 06/01/99 06/01/99GCW OFFICIAL RECORD COPY j | |||
D. Main | D. Main Distribution: | ||
Docket File w/enci PUBLIC IE-07 w/enci J. L. Caldwell, Rlll w/enci - | Docket File w/enci PUBLIC IE-07 w/enci J. L. Caldwell, Rlll w/enci - | ||
C. D. Pederson, Rlli w/enci Rlll Enf. Coordinator w/enci - | C. D. Pederson, Rlli w/enci Rlll Enf. Coordinator w/enci - | ||
MJP (e-mail) | MJP (e-mail) | ||
LEO (e-mail) | LEO (e-mail) | ||
- DOCDESK (e-mail) | |||
. Greens w/o enci. | |||
-070032}} | |||
Latest revision as of 21:51, 6 December 2024
| ML20207E472 | |
| Person / Time | |
|---|---|
| Issue date: | 06/01/1999 |
| From: | Pederson C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Main D AFFILIATION NOT ASSIGNED |
| Shared Package | |
| ML20207E477 | List: |
| References | |
| REF-QA-99990003-990601 99990003-99-02, 99990003-99-2, NUDOCS 9906070049 | |
| Download: ML20207E472 (2) | |
Text
g June 1, 1999 i
David M. Main, Vice President Arvin Industries, Inc.-
One Noblitt Plaza, Box 3000 Columbus, IN 47202-3002
SUBJECT:
NRC INSPECTION REPORT 999-90003/99002(DNMS)
Dear Mr. Main:
This refers to the inspection conducted on April 23,1999, at your Greenwood, Indiana, facility. The inspection was to review the circumstance associated with the reported loss / theft of a Loran Control Systems, Model 5310 thickness gauge containing 1.0 curie (37 gigabecquerels (GBq)) of americium-214 that was reported to the NRC on April 10,1999. At the conclusion of the inspection the preliminary findings were discussed with
. you and your staff and on May 26,1999, the results of the inspection were discussed with you and Larry Mackey.
The enclosed copy of our inspection report identifies areas examined during the inspection.
Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel.
The two apparent violations identified during our April 23,1999 inspection, see enclosed Inspectin: 43 ort 999-90003/99002(DNMS), are currently under review by the NRC. You will be notifs 0 W separate correspondence regarding the results of our review.
In accordoce with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter and the enclosure will be placed in the NRC Public Document Room.
i We will gladly discuss any questions you have conceming this inspection.
1 Sincerely,
/s/ G.C. Wright for 9906070049 990601 RE03 GA999 EMV*****
99990003 PDR Cynthia D. Pederson, Director Division of Nuclear Materials Safety i
Docket No. 999-90003
)
General License (10 CFR 31.5) i
Enclosure:
Inspection Report 999-90003/99002(DNMS) cc w/ encl:
L. Mackey, Esq., Bames & Thornburg DOCUMENT NAME: G;\\SEC\\99990003.991 To receive a copy of this document, indicate in the box;"C" = Copy without enclosure "E"= Copy with enclosure *N"= No copy bFFICE Rill Rlli l
01 l
Rill l
NAME Wiedeman:LE Wright Paul Pederson DATE 06/01/99 06/01/99 06/01/99 06/01/99GCW OFFICIAL RECORD COPY j
D. Main Distribution:
Docket File w/enci PUBLIC IE-07 w/enci J. L. Caldwell, Rlll w/enci -
C. D. Pederson, Rlli w/enci Rlll Enf. Coordinator w/enci -
MJP (e-mail)
LEO (e-mail)
- DOCDESK (e-mail)
. Greens w/o enci.
-070032