{{#Wiki_filter:[mq) Commonwealth
{{#Wiki_filter:[mq) Commonwealth Edison One First N 'ional Plaza. Chicago,1:2nois
(    _-
(
Edison One First N 'ional Plaza. Chicago,1:2nois p ,      \           / Address Reply 12: Post Office Box 767
\\
          's / Chicago, Illinois 60690 - 0767 July 23, 1986 Mr. Harold R. Denton U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC.             20555
/ Address Reply 12: Post Office Box 767 p,
's / Chicago, Illinois 60690 - 0767 July 23, 1986 Mr. Harold R. Denton U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC.
20555


==Subject:==
==Subject:==
Line 25: Line 27:


==Dear Mr. Denton:==
==Dear Mr. Denton:==
 
At a meeting with your staff on July 18, 1986 Commonwealth Edison was asked to supply additional information concerning daily and two week test data for the Static-O-Ring differential pressure switchen.
At a meeting with your staff on July 18, 1986 Commonwealth Edison was asked to supply additional information concerning daily and two week test data for the Static-O-Ring differential pressure switchen.         The enclosed test data was obtained at the SOR factory.
The enclosed test data was obtained at the SOR factory.
The switches were calibrated at 1,000 psi static pressure and have been held at 1,000 psi since July 8, 1986.
The switches were calibrated at 1,000 psi static pressure and have been held at 1,000 psi since July 8, 1986.
Very truly yours, 1
Very truly yours, 1k.
: k. .
M.
M. S. Turbak Operating Plant Licensing Director
S.
    /klj cc:   R. Bernero T. Bournia Resident Inspector-LaSalle 1896K 8607290237 DR                 860723
Turbak Operating Plant Licensing Director
* ADOCK 05000374                                                         -  0l 0:
/klj cc:
PDR                                               j   t
R. Bernero T. Bournia Resident Inspector-LaSalle 1896K 8607290237 860723 0l DR ADOCK 05000374 0:
PDR j
t


o i                                                                                                     e ENCLOSURE Initial     +24 Hr                 72 hrs                   96 hrs           2wk.
o i
i         __r            r         1 j,   Switch # 7/8/86       7/9/86       7/11/86       7/14/86     7/18/86       7/22/86   7/23/86 Daily A 60.1/51.4   60.7/51.8     60.8/52.0     60.9/52.1   61.0/51.9     61.3/52.2 2 wk. A 56.0/48.7   60.0/52.4                                                 --
e ENCLOSURE Initial
60.4/52.9 All data in inches W.C.
+24 Hr 72 hrs
}             Both switches have standard cross-shafts
__r 96 hrs 2wk.
:l l             Daily A was not cycled between 7/11/86-7/14/86 and 7/18/86-7/22/86 1896K 4
i r
1 j,
Switch #
7/8/86 7/9/86 7/11/86 7/14/86 7/18/86 7/22/86 7/23/86 Daily A 60.1/51.4 60.7/51.8 60.8/52.0 60.9/52.1 61.0/51.9 61.3/52.2 2 wk. A 56.0/48.7 60.0/52.4 60.4/52.9 All data in inches W.C.
}
Both switches have standard cross-shafts
:l l
Daily A was not cycled between 7/11/86-7/14/86 and 7/18/86-7/22/86 1896K 4
I
I
)
)

Latest revision as of 20:56, 6 December 2024

Forwards Daily & 2-wk Test Data for Static O-ring Differential Pressure Switches.Switches Calibr at 1,000 Psi Static Pressure & Held at 1,000 Psi Since 860708
ML20207J730
Person / Time
Site: LaSalle 
Issue date: 07/23/1986
From: Turbak M
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
1896K, NUDOCS 8607290237
Download: ML20207J730 (2)


Text

[mq) Commonwealth Edison One First N 'ional Plaza. Chicago,1:2nois

(

\\

/ Address Reply 12: Post Office Box 767 p,

's / Chicago, Illinois 60690 - 0767 July 23, 1986 Mr. Harold R. Denton U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC.

20555

Subject:

LaSalle County Station Unit 2 Additional Information Regarding Differential Pressure Switches NRC Docket No. 50-374

Dear Mr. Denton:

At a meeting with your staff on July 18, 1986 Commonwealth Edison was asked to supply additional information concerning daily and two week test data for the Static-O-Ring differential pressure switchen.

The enclosed test data was obtained at the SOR factory.

The switches were calibrated at 1,000 psi static pressure and have been held at 1,000 psi since July 8, 1986.

Very truly yours, 1k.

M.

S.

Turbak Operating Plant Licensing Director

/klj cc:

R. Bernero T. Bournia Resident Inspector-LaSalle 1896K 8607290237 860723 0l DR ADOCK 05000374 0:

PDR j

t

o i

e ENCLOSURE Initial

+24 Hr 72 hrs

__r 96 hrs 2wk.

i r

1 j,

Switch #

7/8/86 7/9/86 7/11/86 7/14/86 7/18/86 7/22/86 7/23/86 Daily A 60.1/51.4 60.7/51.8 60.8/52.0 60.9/52.1 61.0/51.9 61.3/52.2 2 wk. A 56.0/48.7 60.0/52.4 60.4/52.9 All data in inches W.C.

}

Both switches have standard cross-shafts

l l

Daily A was not cycled between 7/11/86-7/14/86 and 7/18/86-7/22/86 1896K 4

I

)

)

1

).