UNIT 1 OPERATING DATA REPORT coo *************************************************************************
UNIT 1 OPERATING DATA REPORT coo *************************************************************************
Docket No. 50-317 October 13, 1988 Prepared by C.Behnke Telephones (301)260-4871 OPERATING STATUS
Docket No. 50-317 October 13, 1988 Prepared by C.Behnke Telephones (301)260-4871 OPERATING STATUS
                                                      ~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~
: 1. UNIT NAME                                                     Calvert Cliffs Unit 1                                       ;
: 1. UNIT NAME Calvert Cliffs Unit 1
: 2. REPORTING PERIOD                                             SEPTEMBER 1988
: 2. REPORTING PERIOD SEPTEMBER 1988 3.
: 3. LICENSED THERMAL POWER (MWT) 2700                             !
LICENSED THERMAL POWER (MWT) 2700
: 4. NAMEPLATE RATING (GROSS MWe)                                                               918
: 4. NAMEPLATE RATING (GROSS MWe) 918 5.
: 5. DESIGN ELECTRICAL RATING (NET MWe)                                                         845
DESIGN ELECTRICAL RATING (NET MWe) 845 6.
: 6. MAXIMUM DEPENDABIS CAP'Y (GROSS MWe)                                                       860
MAXIMUM DEPENDABIS CAP'Y (GROSS MWe) 860
: 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe)                                                         825
: 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825 8.
: 8. CHANGE IN CAPACITY RATINGS                                                             none
CHANGE IN CAPACITY RATINGS none 9.
: 9. POWER LEVEL TO WHICH RESTRICTED                                                             n/a
POWER LEVEL TO WHICH RESTRICTED n/a
: 10. REASONS FOR RESTRICTIONS                                                                   n/a
: 10. REASONS FOR RESTRICTIONS n/a
(
(
Cumulative   {
Cumulative
This month                         Year-to-Date to Date     {
{
: 11. HOURS IN REPORTING PERIOD                                                                   720       6,575     117,468
This month Year-to-Date to Date
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                                                 720.0           4,517.5   90,904.7   t
{
: 13. REACTOR RESERVE SHUTDOWN HOURS                                                               0.0         0.0     3,019.4 t
: 11. HOURS IN REPORTING PERIOD 720 6,575 117,468
: 14. HOURS GENERATOR ON LINE                                                             720.0           4,401.5   88,854.4   -
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4,517.5 90,904.7 t
: 15. UNIT RESERVE SHUTDOWN HOURS                                                                 0.0         0.0         0.0 l
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4 t
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                                 1,917,494                   11,300,551 223,375,269
: 14. HOURS GENERATOR ON LINE 720.0 4,401.5 88,854.4
: 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH)                                         633,786             3,759,345 73,975,007 j          18. NET ELECTRICAL ENERGY GENERATED (MWH)                                       607,346               3,598,701 70,634,662   r
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 l
: 19. UNIT SERVICE FACTOR
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,917,494 11,300,551 223,375,269
  ~
: 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 633,786 3,759,345 73,975,007
100.0             66.9         75.6
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 607,346 3,598,701 70,634,662 r
: 20. UNIT AVAILABILITY FACTOR                                                             100.0             66.9         75.6 1
j
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                                                 102.2             66.3         72.9 !
~
!        22. UNIT CAPACITY FACTOR (USING DER NET)                                                     99.8           64.8         71.2 l       23. UNIT FORCED OUTAGE RATE                                                                     0.0         2.6         9.8 i
: 19. UNIT SERVICE FACTOR 100.0 66.9 75.6
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT l                           SIX MONTHS (TYPE, DATE AND DURATION):
: 20. UNIT AVAILABILITY FACTOR 100.0 66.9 75.6 1
;                                      Maintenance Outage March 10, 1988; 14 days                                                       !
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 102.2 66.3 72.9
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:                                                                                     l N/A                                                                                               [
: 22. UNIT CAPACITY FACTOR (USING DER NET) 99.8 64.8 71.2 l
l Note       Line 21 "Cumulative" factor no longer uses a weighted average.
: 23. UNIT FORCED OUTAGE RATE 0.0 2.6 9.8 i
___.. __.                                                            l i
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT l
I                                                                                                                                         I f l
SIX MONTHS (TYPE, DATE AND DURATION):
                                                                                                                                ,,  P 8810190218 881013                                                                               fi# b       l PDR     ADOCK 05000317                                                                                     l R                 PDC                                                                                 I g !
Maintenance Outage March 10, 1988; 14 days
l
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, l
                                                                                                                                          \
ESTIMATED DATE OF START-UP:
N/A
[
l Note Line 21 "Cumulative" factor no longer uses a weighted average.
l i
I I
f l
P 8810190218 881013 fi b l
PDR ADOCK 05000317 l
R PDC I
g l
\\


      - - ._--=--                                           ..                        _ . _ .            .    . - _ - . _ - .        - -            .
- -._--=--
  }                                                                                                       LMIT 94JTIMDe6 Me PDGt EDLETIGE                                                                   DODET PC. 3)-317                                     .
}
LNITt# E Ca] vert C1iffs-01                     ,
LMIT 94JTIMDe6 Me PDGt EDLETIGE DODET PC. 3)-317
  <                                                                                                                                                                                                              DATE Cktober 13. 1988 __                     -
)
CDPLETED IN   C. Betnke                                       u FUUlT tDITH _Seotember 1988                                                                 TELERIFE (3011260-4071 l
LNITt# E Ca] vert C1iffs-01
I tETIG CF DlJMTICN       9tJTTItG               LI NEEE       SYSTEM                 CIPf U O tr                           CAlIE & CINECTIW 1
{
FO.           DATE                           TYPE                       OORS)   R/HP[    Daed                     EwNT                                                                         ACTICH TD recTm 3                meCnT .       cCrE''                       CrxE 3
DATE Cktober 13. 1988 __
aEwnT ECmea t&A TiEFE WBE to TRIPS G1 SI(NI-FICANT EDLCTICPE THIS POJTH I
u CDPLETED IN C. Betnke FUUlT tDITH _Seotember 1988 TELERIFE (3011260-4071 l
I tETIG CF DlJMTICN R/HP[
9tJTTItG LI NEEE SYSTEM CIPf U O tr CAlIE & CINECTIW 1
FO.
DATE TYPE OORS)
Daed EwNT ACTICH TD 3
3 recTm meCnT.
cCrE''
CrxE aEwnT ECmea t&A TiEFE WBE to TRIPS G1 SI(NI-FICANT EDLCTICPE THIS POJTH I
J I
J I
i l
i l
1                                                                                                                     .
1 l
l 1
1 F: Forced Reason:
F: Forced                                                         Reason:                                                                 tiethod:                                           Exhibit G-Instructions -
tiethod:
,                  Sr Scteduled                                                     A-Equipment Failure (Explain)                                             1-Manual                                         for Preparation of Data J
Exhibit G-Instructions -
D-tiaintenance or Test                                                   2-t1anual Scram.                                   Entry Stets for License C-Hefueling                                                             3-Automatic Scram.                                 Event Report (LER) File D-fbgulatory Restriction                                                 4-Other (Explain)                                 (PUECro161)
Sr Scteduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data J
E-Operator Training & License Examination F-Administrative                                                                                                       5 I                                                                                                                                                                                                                 Exhibit I - Same Source G-Operational Error (Explain)
D-tiaintenance or Test 2-t1anual Scram.
Entry Stets for License C-Hefueling 3-Automatic Scram.
Event Report (LER) File j
D-fbgulatory Restriction 4-Other (Explain)
(PUECro161)
E-Operator Training & License Examination F-Administrative 5
I Exhibit I - Same Source G-Operational Error (Explain)
H4)ther (Explain) 1
H4)ther (Explain) 1
    - . - - , - ,      , . , , . . - , . - - - , . - , - , - - - - - , - - . - , _ .                        ,                ,  ,.    ,m._ -,  ,,,y7_ - , - . _ _ - , , . . . . - . . , _ , - _ _ _
,m._
                                                                                                                                                                                                                            .,_,r   . - . , ,_ . ._ . _ . _
,,,y7_
.,_,r


  ./-       .-  ,
./-
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No. 1 October 13, 1988                                         '
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No. 1 October 13, 1988 Completed by C.
Completed by C. Behnke Telephone: (301) 260-4871 SEPTEMBER 1988 Average Daily Power Level                                                                     Average Daily Power Level Day       (MWe-Net)                                                                           Day                           (MWe-Net) 1                   845                                                                     17                               852 2                   845                                                                     18                               852 i                    3                   844                                                                     19                               851 4                     844                                                                     20                               851 5                     845                                                                     21                               850 6                   849                                                                     22                               852                                   l 7                     850                                                                     23                               851 8                     850                                                                     24                               851 9                     849                                                                     25                               853 10                     726                                                                     26                               846 11                     849                                                                     27                               817 12                     850                                                                     28                               824 13                     852                                                                     29                               854 14                     849                                                                     30                               855 15                     850 16                     851 t
Behnke Telephone: (301) 260-4871 SEPTEMBER 1988 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 845 17 852 2
845 18 852 3
844 19 851 i
4 844 20 851 5
845 21 850 6
849 22 852 l
7 850 23 851 8
850 24 851 9
849 25 853 10 726 26 846 11 849 27 817 12 850 28 824 13 852 29 854 14 849 30 855 15 850 16 851 t


  .:                                  o'                                   .
o' DOGEr # 50-317 CALVERP CUFFS - WIT 1 October 13, 1988 SG9RRY OF OPERATING EXPERIINCE September 198Q Unit 1 began the month at 100% power operations (840 PMe Net).
DOGEr # 50-317 CALVERP CUFFS - WIT 1 October 13, 1988 SG9RRY OF OPERATING EXPERIINCE September 198Q Unit 1 began the month at 100% power operations (840 PMe Net).                   Power was rdv=4 to 700 )Me on September 10th at 0610 to repair #16A Travelling Screen.
Power was rdv=4 to 700 )Me on September 10th at 0610 to repair #16A Travelling Screen.
Power was further rMv=1 to 460 PMe at 1000 to effect repairs on the Waugh Chapel 500 W Breaker "B". - Breaker and screen repairs wars conpleted by 1730 and by 1830 on Seg#anhar 10th the unit was at 100% power (845 PMe).
Power was further rMv=1 to 460 PMe at 1000 to effect repairs on the Waugh Chapel 500 W Breaker "B". - Breaker and screen repairs wars conpleted by 1730 and by 1830 on Seg#anhar 10th the unit was at 100% power (845 PMe).
On Septanber 25th at 0000 the unit had reached 850 PHe Net. On Septanbar 26th at 2120 power was rMv=1 to 750 )We to clean oordenser waterboxes. Cleanirq
On Septanber 25th at 0000 the unit had reached 850 PHe Net. On Septanbar 26th at 2120 power was rMv=1 to 750 )We to clean oordenser waterboxes. Cleanirq was ocupleted at 0520 on Septanbar 27th and power was increased to 1004 (850 PMe). Power was reduced to 760 PMe at 2100 on Septanbar 27th to clean waterboxes again until 0500 on Septanber 28th. Power was incraaamd to 100% and achieved 855 PMe Net By 0000 on September 29th.
,                                                                      was ocupleted at 0520 on Septanbar 27th and power was increased to 1004 (850 PMe) . Power was reduced to 760 PMe at 2100 on Septanbar 27th to clean waterboxes again until 0500 on Septanber 28th. Power was incraaamd to 100% and achieved 855 PMe Net By 0000 on September 29th.
'Ihe unit ended the month at 100% power (855 }Ee Net).
                                                                        'Ihe unit ended the month at 100% power (855 }Ee Net).
4 4
4 4
1 i
1 i


s     .
s October 6, 1988 R EWEI.ING INFORMATION REQUEST l
October 6, 1988 R EWEI.ING INFORMATION REQUEST l
1.
: 1. Name of facility: Calvert Cliffs Nuc1 car power plant, Unit No. 1.
Name of facility: Calvert Cliffs Nuc1 car power plant, Unit No. 1.
: 2. Scheduled date for next refueling shutdown: March 31, 1990
2.
: 3. Scheduled date for restart following refueling: May 15,1990 4     Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Scheduled date for next refueling shutdown: March 31, 1990 3.
Scheduled date for restart following refueling: May 15,1990 4
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a higher enriched (4.3%) reload batch and reshuffled core for Unit l's next 24 month cycle.
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a higher enriched (4.3%) reload batch and reshuffled core for Unit l's next 24 month cycle.
: 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
5.
June 9, 1988       ( enrichment submittal )
Scheduled date(s) for submitting proposed licensing action and supporting information.
June 9, 1988
( enrichment submittal )
February 15, 1990 ( reload submittal )
February 15, 1990 ( reload submittal )
: 6. Ittport ant licensing considerations associated with the refueling.
6.
Ittport ant licensing considerations associated with the refueling.
Reload fuel will he similar to that reload fuel inserted into Calvert Cliffs Unit 1 tenth Cycle except for the higher enrichment (t'p to 5.0%)
Reload fuel will he similar to that reload fuel inserted into Calvert Cliffs Unit 1 tenth Cycle except for the higher enrichment (t'p to 5.0%)
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
7.
(a) 217             (b) 1243
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1243
* Spent fuel pools are common to Units ; and 2.
* Spent fuel pools are common to Units ; and 2.
: 8.     (a) The present licensed spent fuel pool storage capacity, and (b) the si::e of any increase in licensed storago capacity that has been requested or is planned, in number of fuel assemblies.
8.
(a) 1830         (b) 0
(a) The present licensed spent fuel pool storage capacity, and (b) the si::e of any increase in licensed storago capacity that has been requested or is planned, in number of fuel assemblies.
: 9. The projected date of the last refueling that can be discharged to the Spent Fuel pool assuming the present li insed acacity and maintaining space for one full core off load.
(a) 1830 (b) 0 9.
The projected date of the last refueling that can be discharged to the Spent Fuel pool assuming the present li insed acacity and maintaining space for one full core off load.
April, 1991
April, 1991
* changed since last report N '~ - i . .                               -
* changed since last report N '~ - i..
WWR$m
WWR$m


occo************************************************************************
occo************************************************************************
UNIT 2 OPERATING DATA REPORT ocoo************************************************************************
UNIT 2 OPERATING DATA REPORT ocoo************************************************************************
Docket No. 50-318 October 13, 1908 Prepared by C.Behnke Telephoner (301)260-4871                                     ,
Docket No. 50-318 October 13, 1908 Prepared by C.Behnke Telephoner (301)260-4871 L
L OPERATING STATUS                                                                                                                                                                 l
OPERATING STATUS l
                                                  ..-~~~~~~~~~~~~~
..-~~~~~~~~~~~~~
: 1. UNIT NAME                                                                                                                                                       Calvert Cliffs Unit 2
: 1. UNIT NAME Calvert Cliffs Unit 2
: 2. REPORTING PERIOD                                                                                                                                                 SEPTEMBER 1988                                               i
: 2. REPORTING PERIOD SEPTEMBER 1988 i
: 3. LICENSED THERMAL POWER (MWT)                                                                                                                                                                     2700
3.
: 4. NAMEPLATE RATING (GROSS MWe)                                                                                                                                                                     918                         '
LICENSED THERMAL POWER (MWT) 2700
: 5. DESIGN ELECTRICAL RATING (NET MWe)                                                                                                                                                               845                         l 6     MAXIMUM DEPENDABLE CAP'Y (GROSS MWe)                                                                                                                                                           A60                         l
: 4. NAMEPLATE RATING (GROSS MWe) 918 5.
: 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe)                                                                                                                                                               825                         '
DESIGN ELECTRICAL RATING (NET MWe) 845 l
: 8. CHANGE IN CAPACITY RATINGS                                                                                                                                                                       none                         *
6 MAXIMUM DEPENDABLE CAP'Y (GROSS MWe)
: 9. POWER LEVEL TO WHICH RESTRICTED                                                                                                                                                                   n/a
A60 l
: 10. REASONS FOR RESTRICTIONS                                                                                                                                                                           n/a L
: 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825
Cumulative i This month                           Yea. to-Date to Date   !
: 8. CHANGE IN CAPACITY RATINGS none 9.
: 11. HOURS IN REPORTING PERIOD                                                                                                                                                                         720       6,575     100,823 l
POWER LEVEL TO WHICH RESTRICTED n/a
: 12. HUMBER OF HOURS REACTOR WAS CRITICAL                                                                                                                                                             720.0     5,618.1   93,461.9
: 10. REASONS FOR RESTRICTIONS n/a L
: 13. REACTOR RESERVE SKUTDOWN HOURS                                                                                                                                                                     0.0         0.0     1,296.6 '
Cumulative i
: 14. HOURS GENERATOR ON LINE                                                                                                                                                                         720.0     5,606.2   82,287.8
This month Yea. to-Date to Date
: 15. UNIT RESERVE SHUTDOWN HOURS                                                                                                                                                                       0.0         0.0         0.0 t
: 11. HOURS IN REPORTING PERIOD 720 6,575 100,823 l
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                                                                                                                                                     1,918,754     14,850,941 208,191,605
: 12. HUMBER OF HOURS REACTOR WAS CRITICAL 720.0 5,618.1 93,461.9
: 17. GROSS ELECTRICAL ENERGY GEN'TED(MWM)                                                                                                                                                           624,219   4,930,079 68,818,180 !
: 13. REACTOR RESERVE SKUTDOWN HOURS 0.0 0.0 1,296.6
: 18. NET ELECTRICAL ENERGY GENERATED (MWM)                                                                                                                                                         598,127   4,727,818 65,718,876
: 14. HOURS GENERATOR ON LINE 720.0 5,606.2 82,287.8
: 19. UNIT SERVICE FACTOR                                                                                                                                                                             100.0       85.3       81.6 !
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 t
: 20. UNIT AVAILABILITY FACTOR                                                                                                                                                                         100.0       85.3       81.6 i
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,918,754 14,850,941 208,191,605
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                                                                                                                                                             100.7       87.2       79.0 !
: 17. GROSS ELECTRICAL ENERGY GEN'TED(MWM) 624,219 4,930,079 68,818,180
: 22. UNIT CAPACITY FACTOR (USING DER NET)                                                                                                                                                               98.3       85.1       '77.1 '
: 18. NET ELECTRICAL ENERGY GENERATED (MWM) 598,127 4,727,818 65,718,876
: 23. UNIT FORCED OUTAGE RATE                                                                                                                                                                             0.0         2.4         5.4 l
: 19. UNIT SERVICE FACTOR 100.0 85.3 81.6
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT                                                                                                                                                                                               i SIX MONTHS (TYPE, DATE AND DURATION):                                                                                                                                                                                 I Refueling Outage March 31, 1988; 49 days j
: 20. UNIT AVAILABILITY FACTOR 100.0 85.3 81.6 i
: 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD,                                                                                                                                                                                   f ESTIMATED DATE OF START-UP:                                                                                                                                                                                           '
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 100.7 87.2 79.0
: 22. UNIT CAPACITY FACTOR (USING DER NET) 98.3 85.1
'77.1
: 23. UNIT FORCED OUTAGE RATE 0.0 2.4 5.4 l
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT i
SIX MONTHS (TYPE, DATE AND DURATION):
I Refueling Outage March 31, 1988; 49 days j
: 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, f
ESTIMATED DATE OF START-UP:
N/A Note: Line 21 "Cumulative" factor no longer uses a weighted average.
N/A Note: Line 21 "Cumulative" factor no longer uses a weighted average.


O w
O w
LNIT 9UTDDe6 (M) FDER NDLCTICNS                     000-ET to. "O-318                 .
LNIT 9UTDDe6 (M) FDER NDLCTICNS 000-ET to. "O-318 LNIT FTrE Calww-t Clif fs4T2 DATE October 13. 1900 QJtMITED IN C. EVnke EPORT POJTH _Srptember 190B TELEFHJ E (301)260-4871 ttTu00 or DJMTIGJ 9 tJTTif G LICDRE SYSTEM EIfG DJT N & uJ+triItE y
LNIT FTrE Calww-t Clif fs4T2     -
fC.
DATE October 13. 1900 QJtMITED IN     C. EVnke EPORT POJTH _Srptember 190B                   TELEFHJ E (301)260-4871 ttTu00 or y
DATE WE-1HOLftS)-' NEtYU(
DJMTIGJ         , 9 tJTTif G   LICDRE   SYSTEM   EIfG DJT             N & uJ+triItE fC.     DATE     WE-         1HOLftS)-' NEtYU(               -EWNT                                      (CTIOJ TO
- 00 W 4 3- -RPmT #
                                                  - 00 W 4 3-           -- 4 --         5 RtcTot       -RPmT #  UIE         GIE                 NOUJT REQJTOE WA                                                                                             TFERE bOE to TRIPS 01 SIOJI-FICAf4T FEDLETIGE THIS PUlTH.
-- 4 --
                                                                            '                          4 1
5
* F: Fcscas                 ftwm:                                             ttttcd:                   Exhibit G-Instructicos   -
-EWNT (CTIOJ TO RtcTot UIE GIE NOUJT REQJTOE WA TFERE bOE to TRIPS 01 SIOJI-FICAf4T FEDLETIGE THIS PUlTH.
St Exte d 21e*1           (e-Equipemt Failure (E, plain)                   1-ttwual                   for Preparation of Data D-mir ter arce or ist                             Mh~m2al C.irrea.           Er.try Steets for License C4bf uelirq                                       34estcar.atic Scrara.     Ewnt Regrt (LER) File D-fkgitatcsy Ik<.trictics.                       4-Otter (Esplain)         (r a f EG-Ol61 )
4 1
F: Fcscas ftwm:
ttttcd:
Exhibit G-Instructicos St Exte d 21e*1 (e-Equipemt Failure (E, plain) 1-ttwual for Preparation of Data D-mir ter arce or ist Mh~m2al C.irrea.
Er.try Steets for License C4bf uelirq 34estcar.atic Scrara.
Ewnt Regrt (LER) File D-fkgitatcsy Ik<.trictics.
4-Otter (Esplain)
(r a f EG-Ol61 )
E-Orsatcr Ti ainirq & License Exarninaticn 3
E-Orsatcr Ti ainirq & License Exarninaticn 3
F-faininistrative                                                           E=hibit I - mme Smrce G-Operattonal Error (Explaan)
F-faininistrative E=hibit I - mme Smrce G-Operattonal Error (Explaan)
H4]tter (Explatn)
H4]tter (Explatn)


AVERAGM DAILY UNIT POWER LEVEL                       i Docket No. 50-318                       .
AVERAGM DAILY UNIT POWER LEVEL i
Calvert Cliffs Unit No. 2               l October 13, 1988
Docket No. 50-318 Calvert Cliffs Unit No. 2 l
;                                                          completed by C. Behnke
October 13, 1988 completed by C.
!).                                                         Telephone   (301) 260-4871             <
Behnke
* SEPTEMBER 1988 Average Daily Powsr Level         Average Daily Power Level Day     (MWe-Net)                   Day       (MWe-Net) 1         820                       17         840 2         782                       18         842 I                                                                                                 l 3         835                       19         840
!).
;                                4        836                       20         840             I 4
Telephone (301) 260-4871 SEPTEMBER 1988 Average Daily Powsr Level Average Daily Power Level Day (MWe-Net)
5         835                       21         839             !
Day (MWe-Net) 1 820 17 840 2
6         836                       22         839             ,
782 18 842 I
!                                7        782                       23         839             :
l 3
1 8         840                       24         834             I i
835 19 840 4
9        840                       25         749             (
836 20 840 I
I J
5 835 21 839 4
10        777                      26          847              I
6 836 22 839 7
.                                11        839                      27          849              ;
782 23 839 1
i                                                                                                  -
8 840 24 834 I
j                                12        839                      28          850              ,
i 9
13        838                      29          850              !
840 25 749
14        837                      30          849              '
(
15        838                                                    .
I I
I I
16         839                                                   r l
J 10 777 26 847 11 839 27 849 i
I.
j 12 839 28 850 13 838 29 850 14 837 30 849 15 838 I
N
I 16 839 r
!                                                                                                  I t
l I.
I                                                                                                  I 1
N I
1                                                                                                 l
t I
I 1
l 1


DOCTF # 50-318 CALVERr CLIf73 - UNIT 2 October 13, 1988 SO2%RY OF OPERATDG EXPERIDICE Septerber 1988 Unit 2 began the month at 100% pcwer operatiens (835 Mk liet). On September 1st power was r*+M to 700 Mk at 2155 to clean condenser Vaterboxes. Ptwer was increased to 100% at 0615 on September 2rd. On September 7th power was again   ,
DOCTF # 50-318 CALVERr CLIf73 - UNIT 2 October 13, 1988 SO2%RY OF OPERATDG EXPERIDICE Septerber 1988 Unit 2 began the month at 100% pcwer operatiens (835 Mk liet). On September 1st power was r*+M to 700 Mk at 2155 to clean condenser Vaterboxes. Ptwer was increased to 100% at 0615 on September 2rd. On September 7th power was again reduced to 700 M4 at 0216 to clean waterbo), s.
reduced to 700 M4 at 0216 to clean waterbo),ts. Power was increa.wd at 1600 to 835 Mk.
Power was increa.wd at 1600 to t
835 Mk.
Ptmer was ra+M en Septe:rber loth to 775 MM to clean #23B Oordenser Amertsp.
Ptmer was ra+M en Septe:rber loth to 775 MM to clean #23B Oordenser Amertsp.
Power kus reduced further to 700 M4 to effec.t repairs to the Waugh Chapel Breaker "B" at 1130. Maintenance was expleted at 1510 ard pcwor was increased to 100% power at 845 Mk liet.
Power kus reduced further to 700 M4 to effec.t repairs to the Waugh Chapel Breaker "B" at 1130. Maintenance was expleted at 1510 ard pcwor was increased to 100% power at 845 Mk liet.
On September 24th Ptser kus reduced to 76015M to clean waterboxes. At 1840 on September 25th Power was ircreased to 845 MM.
On September 24th Ptser kus reduced to 76015M to clean waterboxes. At 1840 on September 25th Power was ircreased to 845 MM.
      'Ihe unit ended the month at 100% pcher operations (845 MM !!ct).
'Ihe unit ended the month at 100% pcher operations (845 MM !!ct).


                                              ,                                                                                                    t October 6, 1988 REWELING INFORMATION REQUEST
t October 6, 1988 REWELING INFORMATION REQUEST 1.
: 1. Name of facility: Calvert Cliffs Nuclear Power plant, Unit No. 2.
Name of facility: Calvert Cliffs Nuclear Power plant, Unit No. 2.
: 2. Scheduled date for next refueling shutdown: April 1, 1989
2.
: 3. Scheduled date for restart following refueling: May 16, 1989 4,     Will refueling or resumption of operation thereaf ter require a Technical Specification change or other license amendment?
Scheduled date for next refueling shutdown: April 1, 1989 3.
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a reload batch and reshuffled core at a higher enrichment, 5,     Scheduled date(s) for subraitting proposed licensing action and supporting information, February 9,     1989 ( reload submittal )
Scheduled date for restart following refueling: May 16, 1989 4,
Juna 9,1988                     ( enrichment submittal )
Will refueling or resumption of operation thereaf ter require a Technical Specification change or other license amendment?
: 6. Important licensing considerations associated with the refueling, Reload fuel will be similar to that reload fuel inserted into the previous                       i i                                                  cycle except for the 4.3% enrichment and four advanced test fuel assemblies                     -
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a reload batch and reshuffled core at a higher enrichment, 5,
Scheduled date(s) for subraitting proposed licensing action and supporting information, February 9,
1989 ( reload submittal )
Juna 9,1988
( enrichment submittal )
6.
Important licensing considerations associated with the refueling, Reload fuel will be similar to that reload fuel inserted into the previous i
cycle except for the 4.3% enrichment and four advanced test fuel assemblies i
containing an alternative burnable absorber.
containing an alternative burnable absorber.
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
7.
(a)   217                         (b) 1243
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1243
* Spent fuel pools are cosmoon to Unita 1 and 2.
* Spent fuel pools are cosmoon to Unita 1 and 2.
: 8.     (a) The present licensed spent fuel pool storage capacity, and (b) the size 4
8.
of any increase in licensed storage capacity that has been requested or is                       r planned, in number of fuel assemblies, 1
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is r
(a)   1830                       (b) 0
4 planned, in number of fuel assemblies, 1
: 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
(a) 1830 (b) 0 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April, 1991 r
April, 1991 r
* cb             3 las; report y     y   =       _- - , _ . _ _ _ . - .    . . , _ . _ , , - , _ , _ - , - - - - - _ _ . --
* cb 3 las; report y
y
=


,S                           ',.
,S B ALTIMORE OAS AND ELECTWIC l
B ALTIMORE OAS AND                                                                       !
CHARLES CENTER P.O. BOX 1475 BALTIMORE, MARYLAND 21203 L
ELECTWIC                                                                     -
LEON B. RUS$ ELL we, w. ud.E. m, mi.vw October 13, 1988 I
l CHARLES CENTER   P.O. BOX 1475             BALTIMORE, MARYLAND 21203 L
Document Control Desk
LEON B. RUS$ ELL we, w. ud.E. m , mi.vw                                                 October 13, 1988                                                 I Document Control Desk                                                                                             [
[
U.S. Nuclear Regulatory Commission                                                                               -
U.S. Nuclear Regulatory Commission 1 White Flint North Floor Pl-Room 37 11555 Rockville Pike Rockville, MD 20850
1 White Flint North                                                                                               ;
[
Floor Pl-Room 37                                                                                                 !
ATTENTION:
11555 Rockville Pike Rockville, MD       20850                                                                                       [
Document Control Desk i
ATTENTION:       Document Control Desk                                                                           i Sulk 7ECT:       September Operating Data Reports for Calvert Cliffs                                             I Units 1 and 2 (Dockets 50-317 and 50-318)                                                       '
Sulk 7ECT:
Gentlement                                                                                                       ;
September Operating Data Reports for Calvert Cliffs I
The subject reports are being sent to you as required by Technical Specification 6.9.1.6.                                                                                 I If there are any questions, please contact Carl Behnke, (301)                                                     l 260-4871.                                                                                                         ;
Units 1 and 2 (Dockets 50-317 and 50-318)
Sincerely, f         (
Gentlement The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
I If there are any questions, please contact Carl Behnke, (301) l 260-4871.
Sincerely, f
(
f
f
                                                                                            'B.NusseY       Manager Calvert Cliffs Nuclear                                           t Power Plant Department l
'B.NusseY Manager Calvert Cliffs Nuclear t
LBR/CB/j af                                                                                                       b Enclosures                                                                                                       f cc     W. T. Russell (NRC)
Power Plant Department l
LBR/CB/j af b
f Enclosures cc W. T. Russell (NRC)
S. A. McNeil (NRC)
S. A. McNeil (NRC)
D. Trimble (NRC)                                                                                           [
D. Trimble (NRC)
P. Ross (NRC)                                                                                             l T. Magette (DNR)                                                                                           [
[
P. Ross (NRC) l T. Magette (DNR)
[
D. Reilly (INPO)
D. Reilly (INPO)
X. Gibbard (DOE)
X. Gibbard (DOE)
K. Gromack (CE) g2Y 1
K. Gromack (CE) g2Y 1
                                                                                                                    - . - . . . . . -  - - - - - . .}}
- - - - -..}}

Latest revision as of 20:11, 6 December 2024

Monthly Operating Repts for Sept 1988 for Calvert Cliffs Units 1 & 2
ML20207N560
Person / Time
Site: Calvert Cliffs  
Issue date: 09/30/1988
From: Behnke C, Russell L
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8810190218
Download: ML20207N560 (11)


Text

r-

~

4

~

oco*************************************************************************

UNIT 1 OPERATING DATA REPORT coo *************************************************************************

Docket No. 50-317 October 13, 1988 Prepared by C.Behnke Telephones (301)260-4871 OPERATING STATUS

~~~~~~~~~~~~~~~~

1. UNIT NAME Calvert Cliffs Unit 1
2. REPORTING PERIOD SEPTEMBER 1988 3.

LICENSED THERMAL POWER (MWT) 2700

4. NAMEPLATE RATING (GROSS MWe) 918 5.

DESIGN ELECTRICAL RATING (NET MWe) 845 6.

MAXIMUM DEPENDABIS CAP'Y (GROSS MWe) 860

7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825 8.

CHANGE IN CAPACITY RATINGS none 9.

POWER LEVEL TO WHICH RESTRICTED n/a

10. REASONS FOR RESTRICTIONS n/a

(

Cumulative

{

This month Year-to-Date to Date

{

11. HOURS IN REPORTING PERIOD 720 6,575 117,468
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4,517.5 90,904.7 t
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4 t
14. HOURS GENERATOR ON LINE 720.0 4,401.5 88,854.4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 l
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,917,494 11,300,551 223,375,269
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 633,786 3,759,345 73,975,007
18. NET ELECTRICAL ENERGY GENERATED (MWH) 607,346 3,598,701 70,634,662 r

j

~

19. UNIT SERVICE FACTOR 100.0 66.9 75.6
20. UNIT AVAILABILITY FACTOR 100.0 66.9 75.6 1
21. UNIT CAPACITY FACTOR (USING MDC NET) 102.2 66.3 72.9
22. UNIT CAPACITY FACTOR (USING DER NET) 99.8 64.8 71.2 l
23. UNIT FORCED OUTAGE RATE 0.0 2.6 9.8 i
24. SHUTDOWNS SCHEDULED OVER THE NEXT l

SIX MONTHS (TYPE, DATE AND DURATION):

Maintenance Outage March 10, 1988; 14 days

25. IF SHUTDOWN AT END OF REPORT PERIOD, l

ESTIMATED DATE OF START-UP:

N/A

[

l Note Line 21 "Cumulative" factor no longer uses a weighted average.

l i

I I

f l

P 8810190218 881013 fi b l

PDR ADOCK 05000317 l

R PDC I

g l

\\

- -._--=--

}

LMIT 94JTIMDe6 Me PDGt EDLETIGE DODET PC. 3)-317

)

LNITt# E Ca] vert C1iffs-01

{

DATE Cktober 13. 1988 __

u CDPLETED IN C. Betnke FUUlT tDITH _Seotember 1988 TELERIFE (3011260-4071 l

I tETIG CF DlJMTICN R/HP[

9tJTTItG LI NEEE SYSTEM CIPf U O tr CAlIE & CINECTIW 1

FO.

DATE TYPE OORS)

Daed EwNT ACTICH TD 3

3 recTm meCnT.

cCrE

CrxE aEwnT ECmea t&A TiEFE WBE to TRIPS G1 SI(NI-FICANT EDLCTICPE THIS POJTH I

J I

i l

1 l

1 F: Forced Reason:

tiethod:

Exhibit G-Instructions -

Sr Scteduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data J

D-tiaintenance or Test 2-t1anual Scram.

Entry Stets for License C-Hefueling 3-Automatic Scram.

Event Report (LER) File j

D-fbgulatory Restriction 4-Other (Explain)

(PUECro161)

E-Operator Training & License Examination F-Administrative 5

I Exhibit I - Same Source G-Operational Error (Explain)

H4)ther (Explain) 1

,m._

,,,y7_

.,_,r

./-

AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No. 1 October 13, 1988 Completed by C.

Behnke Telephone: (301) 260-4871 SEPTEMBER 1988 Average Daily Power Level Average Daily Power Level Day (MWe-Net)

Day (MWe-Net) 1 845 17 852 2

845 18 852 3

844 19 851 i

4 844 20 851 5

845 21 850 6

849 22 852 l

7 850 23 851 8

850 24 851 9

849 25 853 10 726 26 846 11 849 27 817 12 850 28 824 13 852 29 854 14 849 30 855 15 850 16 851 t

o' DOGEr # 50-317 CALVERP CUFFS - WIT 1 October 13, 1988 SG9RRY OF OPERATING EXPERIINCE September 198Q Unit 1 began the month at 100% power operations (840 PMe Net).

Power was rdv=4 to 700 )Me on September 10th at 0610 to repair #16A Travelling Screen.

Power was further rMv=1 to 460 PMe at 1000 to effect repairs on the Waugh Chapel 500 W Breaker "B". - Breaker and screen repairs wars conpleted by 1730 and by 1830 on Seg#anhar 10th the unit was at 100% power (845 PMe).

On Septanber 25th at 0000 the unit had reached 850 PHe Net. On Septanbar 26th at 2120 power was rMv=1 to 750 )We to clean oordenser waterboxes. Cleanirq was ocupleted at 0520 on Septanbar 27th and power was increased to 1004 (850 PMe). Power was reduced to 760 PMe at 2100 on Septanbar 27th to clean waterboxes again until 0500 on Septanber 28th. Power was incraaamd to 100% and achieved 855 PMe Net By 0000 on September 29th.

'Ihe unit ended the month at 100% power (855 }Ee Net).

4 4

1 i

s October 6, 1988 R EWEI.ING INFORMATION REQUEST l

1.

Name of facility: Calvert Cliffs Nuc1 car power plant, Unit No. 1.

2.

Scheduled date for next refueling shutdown: March 31, 1990 3.

Scheduled date for restart following refueling: May 15,1990 4

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a higher enriched (4.3%) reload batch and reshuffled core for Unit l's next 24 month cycle.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

June 9, 1988

( enrichment submittal )

February 15, 1990 ( reload submittal )

6.

Ittport ant licensing considerations associated with the refueling.

Reload fuel will he similar to that reload fuel inserted into Calvert Cliffs Unit 1 tenth Cycle except for the higher enrichment (t'p to 5.0%)

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 1243

  • Spent fuel pools are common to Units ; and 2.

8.

(a) The present licensed spent fuel pool storage capacity, and (b) the si::e of any increase in licensed storago capacity that has been requested or is planned, in number of fuel assemblies.

(a) 1830 (b) 0 9.

The projected date of the last refueling that can be discharged to the Spent Fuel pool assuming the present li insed acacity and maintaining space for one full core off load.

April, 1991

  • changed since last report N '~ - i..

WWR$m

occo************************************************************************

UNIT 2 OPERATING DATA REPORT ocoo************************************************************************

Docket No. 50-318 October 13, 1908 Prepared by C.Behnke Telephoner (301)260-4871 L

OPERATING STATUS l

..-~~~~~~~~~~~~~

1. UNIT NAME Calvert Cliffs Unit 2
2. REPORTING PERIOD SEPTEMBER 1988 i

3.

LICENSED THERMAL POWER (MWT) 2700

4. NAMEPLATE RATING (GROSS MWe) 918 5.

DESIGN ELECTRICAL RATING (NET MWe) 845 l

6 MAXIMUM DEPENDABLE CAP'Y (GROSS MWe)

A60 l

7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825
8. CHANGE IN CAPACITY RATINGS none 9.

POWER LEVEL TO WHICH RESTRICTED n/a

10. REASONS FOR RESTRICTIONS n/a L

Cumulative i

This month Yea. to-Date to Date

11. HOURS IN REPORTING PERIOD 720 6,575 100,823 l
12. HUMBER OF HOURS REACTOR WAS CRITICAL 720.0 5,618.1 93,461.9
13. REACTOR RESERVE SKUTDOWN HOURS 0.0 0.0 1,296.6
14. HOURS GENERATOR ON LINE 720.0 5,606.2 82,287.8
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 t
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,918,754 14,850,941 208,191,605
17. GROSS ELECTRICAL ENERGY GEN'TED(MWM) 624,219 4,930,079 68,818,180
18. NET ELECTRICAL ENERGY GENERATED (MWM) 598,127 4,727,818 65,718,876
19. UNIT SERVICE FACTOR 100.0 85.3 81.6
20. UNIT AVAILABILITY FACTOR 100.0 85.3 81.6 i
21. UNIT CAPACITY FACTOR (USING MDC NET) 100.7 87.2 79.0
22. UNIT CAPACITY FACTOR (USING DER NET) 98.3 85.1

'77.1

23. UNIT FORCED OUTAGE RATE 0.0 2.4 5.4 l
24. SHUTDOWNS SCHEDULED OVER THE NEXT i

SIX MONTHS (TYPE, DATE AND DURATION):

I Refueling Outage March 31, 1988; 49 days j

25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, f

ESTIMATED DATE OF START-UP:

N/A Note: Line 21 "Cumulative" factor no longer uses a weighted average.

O w

LNIT 9UTDDe6 (M) FDER NDLCTICNS 000-ET to. "O-318 LNIT FTrE Calww-t Clif fs4T2 DATE October 13. 1900 QJtMITED IN C. EVnke EPORT POJTH _Srptember 190B TELEFHJ E (301)260-4871 ttTu00 or DJMTIGJ 9 tJTTif G LICDRE SYSTEM EIfG DJT N & uJ+triItE y

fC.

DATE WE-1HOLftS)-' NEtYU(

- 00 W 4 3- -RPmT #

-- 4 --

5

-EWNT (CTIOJ TO RtcTot UIE GIE NOUJT REQJTOE WA TFERE bOE to TRIPS 01 SIOJI-FICAf4T FEDLETIGE THIS PUlTH.

4 1

F: Fcscas ftwm:

ttttcd:

Exhibit G-Instructicos St Exte d 21e*1 (e-Equipemt Failure (E, plain) 1-ttwual for Preparation of Data D-mir ter arce or ist Mh~m2al C.irrea.

Er.try Steets for License C4bf uelirq 34estcar.atic Scrara.

Ewnt Regrt (LER) File D-fkgitatcsy Ik<.trictics.

4-Otter (Esplain)

(r a f EG-Ol61 )

E-Orsatcr Ti ainirq & License Exarninaticn 3

F-faininistrative E=hibit I - mme Smrce G-Operattonal Error (Explaan)

H4]tter (Explatn)

AVERAGM DAILY UNIT POWER LEVEL i

Docket No. 50-318 Calvert Cliffs Unit No. 2 l

October 13, 1988 completed by C.

Behnke

!).

Telephone (301) 260-4871 SEPTEMBER 1988 Average Daily Powsr Level Average Daily Power Level Day (MWe-Net)

Day (MWe-Net) 1 820 17 840 2

782 18 842 I

l 3

835 19 840 4

836 20 840 I

5 835 21 839 4

6 836 22 839 7

782 23 839 1

8 840 24 834 I

i 9

840 25 749

(

I I

J 10 777 26 847 11 839 27 849 i

j 12 839 28 850 13 838 29 850 14 837 30 849 15 838 I

I 16 839 r

l I.

N I

t I

I 1

l 1

DOCTF # 50-318 CALVERr CLIf73 - UNIT 2 October 13, 1988 SO2%RY OF OPERATDG EXPERIDICE Septerber 1988 Unit 2 began the month at 100% pcwer operatiens (835 Mk liet). On September 1st power was r*+M to 700 Mk at 2155 to clean condenser Vaterboxes. Ptwer was increased to 100% at 0615 on September 2rd. On September 7th power was again reduced to 700 M4 at 0216 to clean waterbo), s.

Power was increa.wd at 1600 to t

835 Mk.

Ptmer was ra+M en Septe:rber loth to 775 MM to clean #23B Oordenser Amertsp.

Power kus reduced further to 700 M4 to effec.t repairs to the Waugh Chapel Breaker "B" at 1130. Maintenance was expleted at 1510 ard pcwor was increased to 100% power at 845 Mk liet.

On September 24th Ptser kus reduced to 76015M to clean waterboxes. At 1840 on September 25th Power was ircreased to 845 MM.

'Ihe unit ended the month at 100% pcher operations (845 MM !!ct).

t October 6, 1988 REWELING INFORMATION REQUEST 1.

Name of facility: Calvert Cliffs Nuclear Power plant, Unit No. 2.

2.

Scheduled date for next refueling shutdown: April 1, 1989 3.

Scheduled date for restart following refueling: May 16, 1989 4,

Will refueling or resumption of operation thereaf ter require a Technical Specification change or other license amendment?

Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a reload batch and reshuffled core at a higher enrichment, 5,

Scheduled date(s) for subraitting proposed licensing action and supporting information, February 9,

1989 ( reload submittal )

Juna 9,1988

( enrichment submittal )

6.

Important licensing considerations associated with the refueling, Reload fuel will be similar to that reload fuel inserted into the previous i

cycle except for the 4.3% enrichment and four advanced test fuel assemblies i

containing an alternative burnable absorber.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 1243

  • Spent fuel pools are cosmoon to Unita 1 and 2.

8.

(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is r

4 planned, in number of fuel assemblies, 1

(a) 1830 (b) 0 9.

The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

April, 1991 r

  • cb 3 las; report y

y

=

,S B ALTIMORE OAS AND ELECTWIC l

CHARLES CENTER P.O. BOX 1475 BALTIMORE, MARYLAND 21203 L

LEON B. RUS$ ELL we, w. ud.E. m, mi.vw October 13, 1988 I

Document Control Desk

[

U.S. Nuclear Regulatory Commission 1 White Flint North Floor Pl-Room 37 11555 Rockville Pike Rockville, MD 20850

[

ATTENTION:

Document Control Desk i

Sulk 7ECT:

September Operating Data Reports for Calvert Cliffs I

Units 1 and 2 (Dockets 50-317 and 50-318)

Gentlement The subject reports are being sent to you as required by Technical Specification 6.9.1.6.

I If there are any questions, please contact Carl Behnke, (301) l 260-4871.

Sincerely, f

(

f

'B.NusseY Manager Calvert Cliffs Nuclear t

Power Plant Department l

LBR/CB/j af b

f Enclosures cc W. T. Russell (NRC)

S. A. McNeil (NRC)

D. Trimble (NRC)

[

P. Ross (NRC) l T. Magette (DNR)

[

D. Reilly (INPO)

X. Gibbard (DOE)

K. Gromack (CE) g2Y 1

- - - - -..