1Gj Log # TXX-6321
1Gj Log # TXX-6321 File #10110
                                                                ~~
~~
                                                                  -                    File #10110 1       -                                903.7 C       C Ref #10CFR50.55(e) 1UELECTRIC
1 903.7 C
              .,,, c, %                                                                 March 13, 1987 Emutiw 6ke l>esident U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
C Ref #10CFR50.55(e) 1UELECTRIC March 13, 1987
.,,, c, %
Emutiw 6ke l>esident U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555


==SUBJECT:==
==SUBJECT:==
Line 26: Line 29:
DOCKET NOS. 50-145 AND 50-446 SEISMIC AIR GAP DESIGN ADEQUACY SDAR: CP-86-55 Gentlemen:
DOCKET NOS. 50-145 AND 50-446 SEISMIC AIR GAP DESIGN ADEQUACY SDAR: CP-86-55 Gentlemen:
On August 14, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving the seismic air gap design adequacy between the Auxiliary Building and Units 1 and 2 Containment Buildings. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our last interim report was logged TXX-6107, dated November 21, 1986.
On August 14, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving the seismic air gap design adequacy between the Auxiliary Building and Units 1 and 2 Containment Buildings. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our last interim report was logged TXX-6107, dated November 21, 1986.
The evaluation of the refined calculations indicating acceptability of the existing gap (as noted in our previous reports) is continuing in conjunction with the validation of the Seismic Category I Building analysis. The results of this composite evaluation are needed to complete our assessment of the 4
The evaluation of the refined calculations indicating acceptability of the existing gap (as noted in our previous reports) is continuing in conjunction with the validation of the Seismic Category I Building analysis. The results of this composite evaluation are needed to complete our assessment of the impact of this issue upon the safety of plant operations. The validation 4
impact of this issue upon the safety of plant operations. The validation program is currently scheduled for completion by June 1,1987.
program is currently scheduled for completion by June 1,1987.
Our next report on this issue will be submitted no later than July 8, 1987.
Our next report on this issue will be submitted no later than July 8, 1987.
Very truly yours, W. G. Counsil
Very truly yours, W. G. Counsil
{         i By:        ,-
{
s G. S. Keeley N
i G. S. Keeley
                                                                                                    /
/
B703170053 870313 PDR  ADOCK 05000445                                              Manager, Nuclear ing      Lice h. V S                       PDR JCH/ef c - Mr. E. H. Johnson, Region IV Mr. D. L. Kelley - RI, Region IV                                                   /-
By:
Mr. H. S. Phillips - RI, Region IV
s Manager, Nuclear Lice h. V N
                                        - - - -                                                    pg
B703170053 870313 ing PDR ADOCK 05000445 S
PDR JCH/ef c - Mr. E. H. Johnson, Region IV Mr. D. L. Kelley - RI, Region IV
/-
Mr. H. S. Phillips - RI, Region IV pg


f'                 Outgsing C rresprndence bec (3):
f' Outgsing C rresprndence bec (3):
M. D. Spence
M. D. Spence
* INPO
* INPO
* K. L. Scheppele A   W. G. Counsil               R. T. Jenkins                                     H. C. Schmidt J. W. Beck                   R. A. Jones                                       A. B. Scott R. P. Baker                 S. D. Karpyak                                     B. C. Scott
* K. L. Scheppele A
* R. E. Ballard                 G. S. Keeley/                                     C. E. Scott E. Brabazon                   J. S. Marshall
W. G. Counsil R. T. Jenkins H. C. Schmidt J. W. Beck R. A. Jones A. B. Scott R. P. Baker S. D. Karpyak B. C. Scott
* R. E. Ballard G. S. Keeley/
C. E. Scott E. Brabazon J. S. Marshall
* L. K. Sterchi J. L. Barker
* L. K. Sterchi J. L. Barker
* R. P. Klause                                       P. B. Stevens
* R. P. Klause P. B. Stevens
* W. R. Burchette               J. E. Krechting                                   J. F. Streeter
* W. R. Burchette J. E. Krechting J. F. Streeter
* J. H. Butts                   J. C. Kuykenall
* J. H. Butts J. C. Kuykenall
* 8. Tartt R. D. Calder
* 8. Tartt R. D. Calder
* D. F. Landers
* D. F. Landers
* J. L. Vota F. Camp
* J. L. Vota F. Camp
* R. P. Lessey
* R. P. Lessey
* E. L. Wagoner R. E. Camp                   0. W. Lowe                                       H. M. Warren (2)
* E. L. Wagoner R. E. Camp
* R. L. Cloud                   D. M. McAcfee/
: 0. W. Lowe H. M. Warren (2)
* N. H. Williams J. R. Coombe                   P. E. Halstead                               hD.R.Woodlan D. E. Deviney
* R. L. Cloud D. M. McAcfee/
* R. E. McCaskill                                     R. A. Wooldridge
* N. H. Williams J. R. Coombe P. E. Halstead hD.R.Woodlan D. E. Deviney
* R. E. McCaskill R. A. Wooldridge
* L. Dietrich
* L. Dietrich
* J. P. McGaughy
* J. P. McGaughy
* T. G. Dignan                 D. D. Mosley
* T. G. Dignan D. D. Mosley
* J. Ellis
* J. Ellis
* A. Muzzin W. D. Fenoglio               L. D. Nace l
* A. Muzzin W. D. Fenoglio L. D. Nace l
* B. Finkelstein               PIMS l
* B. Finkelstein PIMS l
J. C. Finneran               L. E. Powell
J. C. Finneran L. E. Powell
* J. Garibaldi                 R. L. Ramsey J. B. George                 J. D. Redding R. L. Grubb                 D. M. Reynerson H. A. Harrison
* J. Garibaldi R. L. Ramsey J. B. George J. D. Redding R. L. Grubb D. M. Reynerson H. A. Harrison
* N. S. Reynolds J. C. Hicks March 2, 1987
* N. S. Reynolds J. C. Hicks March 2, 1987
                        * - First Class Mail l
* - First Class Mail l
i
i
  - - - . - . - - . . .                    . . _ _ , .          . _ _ - - - _ _ - , - - - - _ _ - - . _ ,                    --}}
--}}

Latest revision as of 19:46, 6 December 2024

Interim Deficiency Rept CP-86-55 Re Seismic Air Gap Design Adequacy Between Auxiliary Bldg & Units 1 & 2 Containment Bldgs.Initially Reported on 860814.Validation Program Scheduled for Completion by 870601.Next Rept by 870708
ML20207R279
Person / Time
Site: Comanche Peak  
Issue date: 03/13/1987
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CP-86-55, TXX-6321, NUDOCS 8703170053
Download: ML20207R279 (2)


Text

,

1Gj Log # TXX-6321 File #10110

~~

1 903.7 C

C Ref #10CFR50.55(e) 1UELECTRIC March 13, 1987

.,,, c, %

Emutiw 6ke l>esident U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-145 AND 50-446 SEISMIC AIR GAP DESIGN ADEQUACY SDAR: CP-86-55 Gentlemen:

On August 14, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving the seismic air gap design adequacy between the Auxiliary Building and Units 1 and 2 Containment Buildings. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our last interim report was logged TXX-6107, dated November 21, 1986.

The evaluation of the refined calculations indicating acceptability of the existing gap (as noted in our previous reports) is continuing in conjunction with the validation of the Seismic Category I Building analysis. The results of this composite evaluation are needed to complete our assessment of the impact of this issue upon the safety of plant operations. The validation 4

program is currently scheduled for completion by June 1,1987.

Our next report on this issue will be submitted no later than July 8, 1987.

Very truly yours, W. G. Counsil

{

i G. S. Keeley

/

By:

s Manager, Nuclear Lice h. V N

B703170053 870313 ing PDR ADOCK 05000445 S

PDR JCH/ef c - Mr. E. H. Johnson, Region IV Mr. D. L. Kelley - RI, Region IV

/-

Mr. H. S. Phillips - RI, Region IV pg

f' Outgsing C rresprndence bec (3):

M. D. Spence

  • K. L. Scheppele A

W. G. Counsil R. T. Jenkins H. C. Schmidt J. W. Beck R. A. Jones A. B. Scott R. P. Baker S. D. Karpyak B. C. Scott

  • R. E. Ballard G. S. Keeley/

C. E. Scott E. Brabazon J. S. Marshall

  • L. K. Sterchi J. L. Barker
  • R. P. Klause P. B. Stevens
  • W. R. Burchette J. E. Krechting J. F. Streeter
  • J. H. Butts J. C. Kuykenall
  • 8. Tartt R. D. Calder
  • D. F. Landers
  • J. L. Vota F. Camp
  • R. P. Lessey
  • E. L. Wagoner R. E. Camp
0. W. Lowe H. M. Warren (2)
  • R. L. Cloud D. M. McAcfee/
  • N. H. Williams J. R. Coombe P. E. Halstead hD.R.Woodlan D. E. Deviney
  • R. E. McCaskill R. A. Wooldridge
  • L. Dietrich
  • J. P. McGaughy
  • T. G. Dignan D. D. Mosley
  • J. Ellis
  • A. Muzzin W. D. Fenoglio L. D. Nace l
  • B. Finkelstein PIMS l

J. C. Finneran L. E. Powell

  • J. Garibaldi R. L. Ramsey J. B. George J. D. Redding R. L. Grubb D. M. Reynerson H. A. Harrison
  • N. S. Reynolds J. C. Hicks March 2, 1987
  • - First Class Mail l

i

--