l APPENDIX A NOTICE OF VIOLATION Vermont Yankee Nuclear Power Corporation | l APPENDIX A NOTICE OF VIOLATION Vermont Yankee Nuclear Power Corporation Docket No. | ||
50-271 | |||
. Vermont Yankee Nuclear Power Station License No. OPR-28 As a result of the inspection conducted on February 9-13, 1987, and in accor-dance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy) (1986), the following violation was identified: | |||
Technical Specification 6.5.B of the Vermont Yankee Nuclear. Power Station operating license DPR-28 requires that " radiation control standards and procedures shall be prepared, approved and maintained and made available to all station personnel. These procedures shall show permissible radiation exposure, and shall be consistent with the requirements of 10 CFR 20." | Technical Specification 6.5.B of the Vermont Yankee Nuclear. Power Station operating license DPR-28 requires that " radiation control standards and procedures shall be prepared, approved and maintained and made available to all station personnel. These procedures shall show permissible radiation exposure, and shall be consistent with the requirements of 10 CFR 20." | ||
Contrary to the above, procedure 0.P. 0533, revision 5, " Body Burden Analysis," | Contrary to the above, procedure 0.P. 0533, revision 5, " Body Burden Analysis," | ||
| Line 26: | Line 27: | ||
Pursuant to the provisions of 10 CFR 2.201, Vermont Yankee Nuclear Power Corporation is hereby required to submit to this office within thirty days of the date of the letter which transmitted this Notice, a written statement or explanation in reply, including: (1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. | Pursuant to the provisions of 10 CFR 2.201, Vermont Yankee Nuclear Power Corporation is hereby required to submit to this office within thirty days of the date of the letter which transmitted this Notice, a written statement or explanation in reply, including: (1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. | ||
Where good cause is shown, consideration will be given to extending this response time. | Where good cause is shown, consideration will be given to extending this response time. | ||
2 g g [5 | 2 g g [5 | ||
G OFFICIAL RECORD COPY | { | ||
G OFFICIAL RECORD COPY IR VY 87 0002.0.0 03/18/87 e | |||
w _-- _______.______-_ - _ - - --____ _ __ - ___ - __-______ _-____________ _}} | w _-- _______.______-_ - _ - - --____ _ __ - ___ - __-______ _-____________ _}} | ||
Latest revision as of 19:06, 6 December 2024
| ML20207T187 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 03/19/1987 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20207T184 | List: |
| References | |
| 50-271-87-03, 50-271-87-3, NUDOCS 8703230292 | |
| Download: ML20207T187 (1) | |
Text
_
l APPENDIX A NOTICE OF VIOLATION Vermont Yankee Nuclear Power Corporation Docket No.
50-271
. Vermont Yankee Nuclear Power Station License No. OPR-28 As a result of the inspection conducted on February 9-13, 1987, and in accor-dance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy) (1986), the following violation was identified:
Technical Specification 6.5.B of the Vermont Yankee Nuclear. Power Station operating license DPR-28 requires that " radiation control standards and procedures shall be prepared, approved and maintained and made available to all station personnel. These procedures shall show permissible radiation exposure, and shall be consistent with the requirements of 10 CFR 20."
Contrary to the above, procedure 0.P. 0533, revision 5, " Body Burden Analysis,"
was not maintained and followed. Several individuals were subjected to whole body recounts in a manner inappropriate to the requirements of the procedure, and form VYOPF 0533.02,-"Whole Body Count Activity Report" was not filled out and sent to the plant Health Physicist for review. As a result, an internal uptake of one individual was misidentified as external contamination.
This is a Severity Level V violation. (SupplementIV).
Pursuant to the provisions of 10 CFR 2.201, Vermont Yankee Nuclear Power Corporation is hereby required to submit to this office within thirty days of the date of the letter which transmitted this Notice, a written statement or explanation in reply, including: (1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.
Where good cause is shown, consideration will be given to extending this response time.
2 g g [5
{
G OFFICIAL RECORD COPY IR VY 87 0002.0.0 03/18/87 e
w _-- _______.______-_ - _ - - --____ _ __ - ___ - __-______ _-____________ _