ML20209G820: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:r                                                                                                                       1 l
{{#Wiki_filter:r 1
G
l G/pareg9 h
  -  /pareg9
UNITED STATES
    - *-            h                                UNITED STATES
[l j
[l               j               NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205mH001
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205mH001 June 30, 1999 MEMORANDUM TO:
        ......                                        June 30, 1999 MEMORANDUM TO:                   Ellis W. Merschoff, Regional Administrator Region IV                                     ,
Ellis W. Merschoff, Regional Administrator Region IV FROM:
FROM:                             Frank J. Miraglia, Jr.                 I, Deputy Executive Director for Regulatory Programs
Frank J. Miraglia, Jr.
I, Deputy Executive Director for Regulatory Programs


==SUBJECT:==
==SUBJECT:==
FINAL 1999 REGION IV INTEGRATED MATERIALS PERFORMANCE EVALUATION PROGRAM REPORT On June 16,1999, the Management Review Board (MRB) met to consider the proposed final report documenting the Integrated Materials Performance Evaluation Program (IMPEP) review                   !
FINAL 1999 REGION IV INTEGRATED MATERIALS PERFORMANCE EVALUATION PROGRAM REPORT On June 16,1999, the Management Review Board (MRB) met to consider the proposed final report documenting the Integrated Materials Performance Evaluation Program (IMPEP) review of the Region IV program. The MRB found the Region IV program adequate to protect public
of the Region IV program. The MRB found the Region IV program adequate to protect public
]
                                                                                                                        ]
health and safety, but directed a number of changes for the attached final report. Since there were no recommendations for Region IV action, no additional response is required on your part.
health and safety, but directed a number of changes for the attached final report. Since there               '
were no recommendations for Region IV action, no additional response is required on your part.
The most significant changes to the report are as follows:
The most significant changes to the report are as follows:
: 1.       The report now clarifies that RIV's approach to inspections were risk informed and performance-based, and inspections focused on health and safety issues (pages 6
1.
                  . and 18).
The report now clarifies that RIV's approach to inspections were risk informed and performance-based, and inspections focused on health and safety issues (pages 6
: 2.       The resource utilization table on page 16 was modified to reflect redirection of resources. In accordance with a memorandum dated October 16,1998, the region and                   i program office have agreed that resources (1 FTE) would be redirected from the                     ,
. and 18).
uranium recovery inspection program to the decommissioning inspection program.
2.
: 3.       Section 4.2.4, Fuel Cycle Inspection Program, Technical Staffing and Training, was                 ,
The resource utilization table on page 16 was modified to reflect redirection of resources. In accordance with a memorandum dated October 16,1998, the region and i
clarified to better describe RIV's plan to cross train a materials inspector to qualify as a       l fuel cycle facility inspector, to provide back-up for the lead fuel cycle inspector.
program office have agreed that resources (1 FTE) would be redirected from the uranium recovery inspection program to the decommissioning inspection program.
: 4.       Recommendations three and four were slightly reworded to clarify the action required.
3.
: 5.       Several editorial changes were made to the report.                 QQ-l
Section 4.2.4, Fuel Cycle Inspection Program, Technical Staffing and Training, was clarified to better describe RIV's plan to cross train a materials inspector to qualify as a fuel cycle facility inspector, to provide back-up for the lead fuel cycle inspector.
                                                                                                                  }I   '
4.
CONTACT:         Sally L. Merchant, NMSS/IMNS (301) 415-7874
Recommendations three and four were slightly reworded to clarify the action required.
(       '
5.
q 2C000g                                                   1D &R 1 A L:le,5%                   (;.
Several editorial changes were made to the report.
    ,&i72g22 gogo 7                                                                                                                 .
QQ-l
}I CONTACT:
Sally L. Merchant, NMSS/IMNS (301) 415-7874
(
q 2C000g 1D &R 1 A L:le,5%
(;.
,&i72g22 gogo 7
PDR
PDR


3 l
3 l
E. W. Merschoff                                   2 I appreciate Region IV's efforts over the entire IMPEP review period, and especia during the time of the team's visit. Normally, the Office of Nuclear Materials Safety and S' eguards (NMSS) has used a two-year interval to conduct regional reviews. However,         ave asked               i NMSS to give consideration to a longer interval following favorable review , such as this one.
E. W. Merschoff 2
I At the MRB, you proposed severalideas on this topic. NMSS will take s into account as it                   l reaches its decision.                                                                                       l l
I appreciate Region IV's efforts over the entire IMPEP review period, and especia during the time of the team's visit. Normally, the Office of Nuclear Materials Safety and S' eguards (NMSS) has used a two-year interval to conduct regional reviews. However, ave asked i
Attachments: As stated cc:     D. Chamberlain, RIV I
NMSS to give consideration to a longer interval following favorable review, such as this one.
DISTRIBUTION:           Document name:         IVfincov.wpd NRC Central File IMPEP r/f IMNS r/f NMSS r/f                                                                                                   l PDR -- YES NUDOCS MSIB IMPEP FILE (Book)
At the MRB, you proposed severalideas on this topic. NMSS will take s into account as it l
LRakovan, OSP                         JHickey, DWM             GSmith, FCSS KSchneider, OSP                       JKennedy, DWM             LLessler, FCSS JMyers, OSP                           TJohnson, DWM             HBermudez, Ril GDeegan, NMSS                         LTenEyck, FCSS           CCain, RIV SMoore, NMSS                         ~ JPiccone, FCSS           Lhowell, RIV JGreeves, DWM                         PTing, FCSS               ECollins, RIV JHolonich, DWM                         WTroskowski, FCSS         DBSpitzberg, RIV BJ Smith, State o Mississippi To receive a co of this document, indicate in the box "C" = copy wit ut attachment / enclosure, "B" = copy with attachment / enclosure, "N" = No copy f/JA/57c6 OFFICE:[ RGB/IMNS             h   IMNS               NMSS                 DEDR NAME:[ SMebnt                     DC         N       CPaperiello           FMiraglia DATF         6 /M /99           6/1'/99             6/   /99             6/ /99
reaches its decision.
              ,g b
Attachments: As stated cc:
                        .g                 OFFICIAL RECORD COPY 9
D. Chamberlain, RIV DISTRIBUTION:
9 L                                                                                                               .
Document name:
IVfincov.wpd NRC Central File IMPEP r/f IMNS r/f NMSS r/f l
PDR -- YES NUDOCS MSIB IMPEP FILE (Book)
LRakovan, OSP JHickey, DWM GSmith, FCSS KSchneider, OSP JKennedy, DWM LLessler, FCSS JMyers, OSP TJohnson, DWM HBermudez, Ril GDeegan, NMSS LTenEyck, FCSS CCain, RIV SMoore, NMSS
~ JPiccone, FCSS Lhowell, RIV JGreeves, DWM PTing, FCSS ECollins, RIV JHolonich, DWM WTroskowski, FCSS DBSpitzberg, RIV BJ Smith, State o Mississippi To receive a co of this document, indicate in the box "C" = copy wit ut attachment / enclosure, "B" = copy with attachment / enclosure, "N" = No copy f/JA/57c6 OFFICE:[ RGB/IMNS h
IMNS NMSS DEDR NAME:[
SMebnt DC N
CPaperiello FMiraglia DATF 6 /M /99 6/1'/99 6/
/99 6/ /99
,g
.g OFFICIAL RECORD COPY b
9 9
L


F.
F.
l .,      .
l l
l E. W. Merschoff                                   2 I appreciate Region IV's efforts over the entire IMPEP review period, and especially during the time of the team's visit. During the MRB, you proposed severalideas regarding extending the interval between regional reviews. Normally, the Office of Nuclear Material Safety and l       . Safeguards (NMSS) has used a two-year interval to conduct regional reviews. In response to your comments, I have asked NMSS to evaluate the current interval between regional reviews.
E. W. Merschoff 2
I appreciate Region IV's efforts over the entire IMPEP review period, and especially during the time of the team's visit. During the MRB, you proposed severalideas regarding extending the interval between regional reviews. Normally, the Office of Nuclear Material Safety and l
. Safeguards (NMSS) has used a two-year interval to conduct regional reviews. In response to your comments, I have asked NMSS to evaluate the current interval between regional reviews.
Attachments: As stated 1
Attachments: As stated 1
cc-     D. Chamberlain, RIV l
cc-D. Chamberlain, RIV l
Cop;eshavobeen made trOEDOandforthose highlighted.Pleasemake remainingdistributoa.
Cop;eshavobeen made trOEDOandforthose highlighted.Pleasemake remainingdistributoa.
DISTRIBUTION:           Document name: A:RIVfincov.wpd NRC Central File                                                             Thanks,         *^
DISTRIBUTION:
IMPEP r/f IMNS r/f NMSS r/f OEDO,     'll I f 9 7 PDR - YES NUDOCS MSlB IMPEP FILE (Book)
Document name: A:RIVfincov.wpd NRC Central File
LRakovan, OSP                             JHickey, DWM                 GSmith, FCSS KSchneider, OSP                           JKennedy, DWM               LLessler, FCSS JMyers, OSP                               TJohnson, DWM               HBermudez, Rll GDeegan, NMSS                             LTenEyck, FCSS               CCain, RIV SMoore, NMSS                             JPiccone, FCSS               Lhowell, RIV JGreeves, DWM                             PTing, FCSS                 ECollins, RIV l
: Thanks,
JHolonich, DWM                             WTroskowski, FCSS           DBSpitzberg, RIV BJ Smith, State of Mississippi
*^
IMPEP r/f IMNS r/f OEDO, 'll I f 9 7 NMSS r/f PDR - YES NUDOCS MSlB IMPEP FILE (Book)
LRakovan, OSP JHickey, DWM GSmith, FCSS KSchneider, OSP JKennedy, DWM LLessler, FCSS JMyers, OSP TJohnson, DWM HBermudez, Rll GDeegan, NMSS LTenEyck, FCSS CCain, RIV SMoore, NMSS JPiccone, FCSS Lhowell, RIV JGreeves, DWM PTing, FCSS ECollins, RIV l
JHolonich, DWM WTroskowski, FCSS DBSpitzberg, RIV BJ Smith, State of Mississippi
* See previous To receive a copy of this document, indicate in the box
* See previous To receive a copy of this document, indicate in the box
          *C" = copy without attachment / enclosure, "B" = copy with attachment / enclosure, *N" = No copy OFFICE:     RGB/IMNS*             IMNS*                 NMSS                   QEDR NAME:       SMerchant             DCool                 CPaperiello M <       kraglia DATE:       6 /22 /99             6/22 /99               6/$t#1 /99             d%99 l                                             OFFICIAL RECORD COPY
*C" = copy without attachment / enclosure, "B" = copy with attachment / enclosure, *N" = No copy OFFICE:
RGB/IMNS*
IMNS*
NMSS QEDR NAME:
SMerchant DCool CPaperiello M < kraglia DATE:
6 /22 /99 6/22 /99 6/$t#1 /99 d%99 l
OFFICIAL RECORD COPY


E. W. Merschoff                               2 I appreciate Region IV's efforts over the entire IMPEP review period, and especially during the time of the team's visit. During the MRB, you proposed severalideas regarding extending the interval between regional reviews. Normally, the Office of Nuclear Material Safety and Safeguards (NMSS) has used a two-year interval to conduct regional reviews. In response to your comments, I have asked NMSS to evaluate the current interval between regional reviews.
E. W. Merschoff 2
Attachments: As stated cc:     D. Chamberlain, RIV
I appreciate Region IV's efforts over the entire IMPEP review period, and especially during the time of the team's visit. During the MRB, you proposed severalideas regarding extending the interval between regional reviews. Normally, the Office of Nuclear Material Safety and Safeguards (NMSS) has used a two-year interval to conduct regional reviews. In response to your comments, I have asked NMSS to evaluate the current interval between regional reviews.
Attachments: As stated cc:
D. Chamberlain, RIV


M' ,.                                                       June 30, 1999 E. W. Merschoff                                   2 I appreciate Region IV's efforts over the entire IMPEP review period, and especially during the time of the team's visit. During the MRB, you proposed severalideas regarding extending the interval between regional reviews. Normally, the Office of Nuclear Material Safety and Safeguards (NMSS) has used a two-year interval to conduct regional reviews. In response to your comments, I have asked NMSS to evaluate the current interval between regional reviews.
M',.
I Attachments: As stated cc:     D. Chamberlain, RIV l
June 30, 1999 E. W. Merschoff 2
l DISTRIBUTION:           Document name: A:RIVfincov.wpd NRC Central File IMPEP r/f IMNS r/f NMSS r/f PDR - YES NUDOCS MSIB IMPEP FILE (Book)
I appreciate Region IV's efforts over the entire IMPEP review period, and especially during the time of the team's visit. During the MRB, you proposed severalideas regarding extending the interval between regional reviews. Normally, the Office of Nuclear Material Safety and Safeguards (NMSS) has used a two-year interval to conduct regional reviews. In response to your comments, I have asked NMSS to evaluate the current interval between regional reviews.
LRakovan, OSP                             JHickey, DWM               GSmith, FCSS KSchneider, OSP                           JKennedy, DWM               LLessler, FCSS JMyers, OSP                               TJohnson, DWM               HBermudez, Ril GDeegan, NMSS                             LTenEyck, FCSS             CCain, RIV SMoore, NMSS                               JPiccone, FCSS             Lhowell, RIV I         JGreeves, DWM                             PTing, FCSS                 ECollins, RIV JHolonich, DWM                             WTroskowski, FCSS           DBSpitzberg, RIV BJ Smith, State of Mississippi
I Attachments: As stated cc:
* See previous To roccive a copy of this document, indicate in the box "C" = copy without attachment /enclosui , B" = copy with attachment / enclosure, "N" = No copy OFFICE:       RGB/IMNS*             IMNS*                 NMSS                 QEDR NAME:         SMerchant             DCool                 CPaperiello M <           raglia DATE:         6/22 /99             6/22 /99               6/M /99               hd$f99 OFFICIAL RECORD COPY k   _}}
D. Chamberlain, RIV l
DISTRIBUTION:
Document name: A:RIVfincov.wpd NRC Central File IMPEP r/f IMNS r/f NMSS r/f PDR - YES NUDOCS MSIB IMPEP FILE (Book)
LRakovan, OSP JHickey, DWM GSmith, FCSS KSchneider, OSP JKennedy, DWM LLessler, FCSS JMyers, OSP TJohnson, DWM HBermudez, Ril GDeegan, NMSS LTenEyck, FCSS CCain, RIV SMoore, NMSS JPiccone, FCSS Lhowell, RIV I
JGreeves, DWM PTing, FCSS ECollins, RIV JHolonich, DWM WTroskowski, FCSS DBSpitzberg, RIV BJ Smith, State of Mississippi
* See previous To roccive a copy of this document, indicate in the box "C" = copy without attachment /enclosui, B" = copy with attachment / enclosure, "N" = No copy OFFICE:
RGB/IMNS*
IMNS*
NMSS QEDR NAME:
SMerchant DCool CPaperiello M <
raglia DATE:
6/22 /99 6/22 /99 6/M /99 hd$f99 OFFICIAL RECORD COPY k
_}}

Latest revision as of 17:45, 6 December 2024

Forwards Final 1999 Region IV Integrated Materials Performance Evaluation Program Rept.Mrb Found Region IV Program Adequate to Protect Public Health & Safety,But Directed Number of Changes for Attached Final Rept
ML20209G820
Person / Time
Issue date: 06/30/1999
From: Miraglia F
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Merschoff E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20209G825 List:
References
NUDOCS 9907200021
Download: ML20209G820 (5)


Text

r 1

l G/pareg9 h

UNITED STATES

[l j

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205mH001 June 30, 1999 MEMORANDUM TO:

Ellis W. Merschoff, Regional Administrator Region IV FROM:

Frank J. Miraglia, Jr.

I, Deputy Executive Director for Regulatory Programs

SUBJECT:

FINAL 1999 REGION IV INTEGRATED MATERIALS PERFORMANCE EVALUATION PROGRAM REPORT On June 16,1999, the Management Review Board (MRB) met to consider the proposed final report documenting the Integrated Materials Performance Evaluation Program (IMPEP) review of the Region IV program. The MRB found the Region IV program adequate to protect public

]

health and safety, but directed a number of changes for the attached final report. Since there were no recommendations for Region IV action, no additional response is required on your part.

The most significant changes to the report are as follows:

1.

The report now clarifies that RIV's approach to inspections were risk informed and performance-based, and inspections focused on health and safety issues (pages 6

. and 18).

2.

The resource utilization table on page 16 was modified to reflect redirection of resources. In accordance with a memorandum dated October 16,1998, the region and i

program office have agreed that resources (1 FTE) would be redirected from the uranium recovery inspection program to the decommissioning inspection program.

3.

Section 4.2.4, Fuel Cycle Inspection Program, Technical Staffing and Training, was clarified to better describe RIV's plan to cross train a materials inspector to qualify as a fuel cycle facility inspector, to provide back-up for the lead fuel cycle inspector.

4.

Recommendations three and four were slightly reworded to clarify the action required.

5.

Several editorial changes were made to the report.

QQ-l

}I CONTACT:

Sally L. Merchant, NMSS/IMNS (301) 415-7874

(

q 2C000g 1D &R 1 A L:le,5%

(;.

,&i72g22 gogo 7

PDR

3 l

E. W. Merschoff 2

I appreciate Region IV's efforts over the entire IMPEP review period, and especia during the time of the team's visit. Normally, the Office of Nuclear Materials Safety and S' eguards (NMSS) has used a two-year interval to conduct regional reviews. However, ave asked i

NMSS to give consideration to a longer interval following favorable review, such as this one.

At the MRB, you proposed severalideas on this topic. NMSS will take s into account as it l

reaches its decision.

Attachments: As stated cc:

D. Chamberlain, RIV DISTRIBUTION:

Document name:

IVfincov.wpd NRC Central File IMPEP r/f IMNS r/f NMSS r/f l

PDR -- YES NUDOCS MSIB IMPEP FILE (Book)

LRakovan, OSP JHickey, DWM GSmith, FCSS KSchneider, OSP JKennedy, DWM LLessler, FCSS JMyers, OSP TJohnson, DWM HBermudez, Ril GDeegan, NMSS LTenEyck, FCSS CCain, RIV SMoore, NMSS

~ JPiccone, FCSS Lhowell, RIV JGreeves, DWM PTing, FCSS ECollins, RIV JHolonich, DWM WTroskowski, FCSS DBSpitzberg, RIV BJ Smith, State o Mississippi To receive a co of this document, indicate in the box "C" = copy wit ut attachment / enclosure, "B" = copy with attachment / enclosure, "N" = No copy f/JA/57c6 OFFICE:[ RGB/IMNS h

IMNS NMSS DEDR NAME:[

SMebnt DC N

CPaperiello FMiraglia DATF 6 /M /99 6/1'/99 6/

/99 6/ /99

,g

.g OFFICIAL RECORD COPY b

9 9

L

F.

l l

E. W. Merschoff 2

I appreciate Region IV's efforts over the entire IMPEP review period, and especially during the time of the team's visit. During the MRB, you proposed severalideas regarding extending the interval between regional reviews. Normally, the Office of Nuclear Material Safety and l

. Safeguards (NMSS) has used a two-year interval to conduct regional reviews. In response to your comments, I have asked NMSS to evaluate the current interval between regional reviews.

Attachments: As stated 1

cc-D. Chamberlain, RIV l

Cop;eshavobeen made trOEDOandforthose highlighted.Pleasemake remainingdistributoa.

DISTRIBUTION:

Document name: A:RIVfincov.wpd NRC Central File

Thanks,
  • ^

IMPEP r/f IMNS r/f OEDO, 'll I f 9 7 NMSS r/f PDR - YES NUDOCS MSlB IMPEP FILE (Book)

LRakovan, OSP JHickey, DWM GSmith, FCSS KSchneider, OSP JKennedy, DWM LLessler, FCSS JMyers, OSP TJohnson, DWM HBermudez, Rll GDeegan, NMSS LTenEyck, FCSS CCain, RIV SMoore, NMSS JPiccone, FCSS Lhowell, RIV JGreeves, DWM PTing, FCSS ECollins, RIV l

JHolonich, DWM WTroskowski, FCSS DBSpitzberg, RIV BJ Smith, State of Mississippi

  • See previous To receive a copy of this document, indicate in the box
  • C" = copy without attachment / enclosure, "B" = copy with attachment / enclosure, *N" = No copy OFFICE:

RGB/IMNS*

IMNS*

NMSS QEDR NAME:

SMerchant DCool CPaperiello M < kraglia DATE:

6 /22 /99 6/22 /99 6/$t#1 /99 d%99 l

OFFICIAL RECORD COPY

E. W. Merschoff 2

I appreciate Region IV's efforts over the entire IMPEP review period, and especially during the time of the team's visit. During the MRB, you proposed severalideas regarding extending the interval between regional reviews. Normally, the Office of Nuclear Material Safety and Safeguards (NMSS) has used a two-year interval to conduct regional reviews. In response to your comments, I have asked NMSS to evaluate the current interval between regional reviews.

Attachments: As stated cc:

D. Chamberlain, RIV

M',.

June 30, 1999 E. W. Merschoff 2

I appreciate Region IV's efforts over the entire IMPEP review period, and especially during the time of the team's visit. During the MRB, you proposed severalideas regarding extending the interval between regional reviews. Normally, the Office of Nuclear Material Safety and Safeguards (NMSS) has used a two-year interval to conduct regional reviews. In response to your comments, I have asked NMSS to evaluate the current interval between regional reviews.

I Attachments: As stated cc:

D. Chamberlain, RIV l

DISTRIBUTION:

Document name: A:RIVfincov.wpd NRC Central File IMPEP r/f IMNS r/f NMSS r/f PDR - YES NUDOCS MSIB IMPEP FILE (Book)

LRakovan, OSP JHickey, DWM GSmith, FCSS KSchneider, OSP JKennedy, DWM LLessler, FCSS JMyers, OSP TJohnson, DWM HBermudez, Ril GDeegan, NMSS LTenEyck, FCSS CCain, RIV SMoore, NMSS JPiccone, FCSS Lhowell, RIV I

JGreeves, DWM PTing, FCSS ECollins, RIV JHolonich, DWM WTroskowski, FCSS DBSpitzberg, RIV BJ Smith, State of Mississippi

  • See previous To roccive a copy of this document, indicate in the box "C" = copy without attachment /enclosui, B" = copy with attachment / enclosure, "N" = No copy OFFICE:

RGB/IMNS*

IMNS*

NMSS QEDR NAME:

SMerchant DCool CPaperiello M <

raglia DATE:

6/22 /99 6/22 /99 6/M /99 hd$f99 OFFICIAL RECORD COPY k

_