Log # TXX-6042 File # 10110 | |||
903.9 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER . 439 NORT98 OLIVE STREET. I.R. 98 . DALIAs. TEXA5 7EEDI October 15, 1986 | ) | ||
903.9 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 439 NORT98 OLIVE STREET. I.R. 98. DALIAs. TEXA5 7EEDI October 15, 1986 mlf @ W..,. ;,. -- | |||
:*2 2 a' = :2, | .) | ||
M i | |||
l | :*2 2 a' = :2, | ||
~ | |||
l DCT151986 gh Mr. Eric-H. Johnson, Director b | |||
Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 | |||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 30: | Line 33: | ||
==Dear Mr. Johnson:== | ==Dear Mr. Johnson:== | ||
On June 6,1986, we notified you of a reportable item involving the scope of plant modifications resulting from the project's pipe support reverification program (see TXX-4844). | |||
On June 6,1986, we notified you of a reportable item involving the scope of plant modifications resulting from the project's pipe support reverification program (see TXX-4844). | This issue was being tracked under SDAR CP-86-36, Pipe Supports. We are dividing this issue into two parts to segregate small bore piping and supports from large bore piping and supports. | ||
SDAR CP-86-36 will become'"Large Bore Piping and Supports", and SDAR CP-86-72 is "Small Bore Piping and Supports". | |||
The scope of SDAR CP-86-72 includes Unit 1 and 2 small bore (2" and under) | The scope of SDAR CP-86-72 includes Unit 1 and 2 small bore (2" and under) | ||
ASME class 2 and 3 piping and supports that are not part of large bore or class 1 stress problems which are covered in SDAR CP-86-36. Interim reports will include a tabilation by category of piping or support modifications as follows: | ASME class 2 and 3 piping and supports that are not part of large bore or class 1 stress problems which are covered in SDAR CP-86-36. | ||
Interim reports will include a tabilation by category of piping or support modifications as follows: | |||
1) | |||
Prudent. Acceptance by physical modification versus analysis. | |||
Supports in this category may be technically acceptable; however, more time and expense would be involved than that required to physically modify the support and qualify the modification. | |||
: 2) Recent NRC and Industry recommended practice. Modifications implemented to eliminate snubbers to enhance a plant maintainability, reduce in-service inspection, and minimize worker exposure (operating plant conditions). | : 2) Recent NRC and Industry recommended practice. Modifications implemented to eliminate snubbers to enhance a plant maintainability, reduce in-service inspection, and minimize worker exposure (operating plant conditions). | ||
: 3) Adjustment. Minor modifications (such as re-torquing or shimning) implemented to meet more rigorous installation criteria contained in the resolution of the external source technical iscues. | : 3) Adjustment. Minor modifications (such as re-torquing or shimning) implemented to meet more rigorous installation criteria contained in the resolution of the external source technical iscues. | ||
: 4) Cumulative effects. Modifications that may be required due to the combined effect of multiple issues. | : 4) Cumulative effects. Modifications that may be required due to the combined effect of multiple issues. | ||
gO22OO54861015 S | gO22OO54861015 S | ||
ADOCK 05000445 PDR a unuswn <w rexrs arrunrs vu.ucrme anorm | |||
TXX-6042 October 15, 1986 Page 2 of 2 The attached list shows the support modifications initiated to date. We are continuing our evaluation and anticipate submitting our next report by December 1, 1986. | TXX-6042 October 15, 1986 Page 2 of 2 The attached list shows the support modifications initiated to date. We are continuing our evaluation and anticipate submitting our next report by December 1, 1986. | ||
| Line 44: | Line 52: | ||
W. G. Counsil JCH/amb Attachment c - NRC Region IV (0 + 1 copy) | W. G. Counsil JCH/amb Attachment c - NRC Region IV (0 + 1 copy) | ||
Director, Inspection & Enforcement (15 copies) | Director, Inspection & Enforcement (15 copies) | ||
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 1 | U. S. Nuclear Regulatory Commission Washington, D.C. | ||
20555 1 | |||
i l | i l | ||
4 TXX-6042 | 4 TXX-6042 l | ||
October 15, 1986 Page 1 of 1 ATTACHMENT SMALL BORE PIPE SUPPORT MODIFICATIONS Number of Mail Cateaory Modifications 1 | |||
Prudent-26 Recent Industry Practice 56 Adjustment 33 Cumulative Effects 32 2 | |||
Prudent 4 | |||
Recent Industry Practice 14 Adjustment 10 Cumulative Effects 74 i | |||
i | i | ||
) | ) | ||
4 1 | 4 1 | ||
f l | f l | ||
4 | 4 v-,- | ||
r | |||
-.w._,, | |||
.-.,_,,._,,.-,.--,-,,,c..-.. | |||
----r-,- | |||
..,-,,,,_.c | |||
. - - - - -., - -- - - ~., | |||
.}} | |||
Latest revision as of 00:09, 6 December 2024
| ML20211C922 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/15/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-72, TXX-6042, NUDOCS 8610220054 | |
| Download: ML20211C922 (3) | |
Text
-
Log # TXX-6042 File # 10110
)
903.9 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 439 NORT98 OLIVE STREET. I.R. 98. DALIAs. TEXA5 7EEDI October 15, 1986 mlf @ W..,. ;,. --
.)
M i
- 2 2 a' = :2,
~
l DCT151986 gh Mr. Eric-H. Johnson, Director b
Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446.
SMALL BORE PIPING AND SUPPORTS SDAR: CP-86-72 (INTERIM REPORT)
Dear Mr. Johnson:
On June 6,1986, we notified you of a reportable item involving the scope of plant modifications resulting from the project's pipe support reverification program (see TXX-4844).
This issue was being tracked under SDAR CP-86-36, Pipe Supports. We are dividing this issue into two parts to segregate small bore piping and supports from large bore piping and supports.
SDAR CP-86-36 will become'"Large Bore Piping and Supports", and SDAR CP-86-72 is "Small Bore Piping and Supports".
The scope of SDAR CP-86-72 includes Unit 1 and 2 small bore (2" and under)
ASME class 2 and 3 piping and supports that are not part of large bore or class 1 stress problems which are covered in SDAR CP-86-36.
Interim reports will include a tabilation by category of piping or support modifications as follows:
1)
Prudent. Acceptance by physical modification versus analysis.
Supports in this category may be technically acceptable; however, more time and expense would be involved than that required to physically modify the support and qualify the modification.
- 2) Recent NRC and Industry recommended practice. Modifications implemented to eliminate snubbers to enhance a plant maintainability, reduce in-service inspection, and minimize worker exposure (operating plant conditions).
- 3) Adjustment. Minor modifications (such as re-torquing or shimning) implemented to meet more rigorous installation criteria contained in the resolution of the external source technical iscues.
- 4) Cumulative effects. Modifications that may be required due to the combined effect of multiple issues.
gO22OO54861015 S
ADOCK 05000445 PDR a unuswn <w rexrs arrunrs vu.ucrme anorm
TXX-6042 October 15, 1986 Page 2 of 2 The attached list shows the support modifications initiated to date. We are continuing our evaluation and anticipate submitting our next report by December 1, 1986.
Very truly yours, (7f72/
W. G. Counsil JCH/amb Attachment c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 1
i l
4 TXX-6042 l
October 15, 1986 Page 1 of 1 ATTACHMENT SMALL BORE PIPE SUPPORT MODIFICATIONS Number of Mail Cateaory Modifications 1
Prudent-26 Recent Industry Practice 56 Adjustment 33 Cumulative Effects 32 2
Prudent 4
Recent Industry Practice 14 Adjustment 10 Cumulative Effects 74 i