',/ CENTRAL FILE iOdb,Nb$ bb. [U.E CDR JUL 7 1980 o47 | |||
't l | |||
s 0 | s 0 | ||
MDf0RANDUM FOR: | MDf0RANDUM FOR: | ||
FROM: | B. J. Youngblood, Chief Licensing Projects Branch, DL FROM: | ||
Franz P. Schauer, Chief Structural Engineering Branch, DE f | |||
==SUBJECT:== | ==SUBJECT:== | ||
WPPSS-2 SACRIFICIAL SHIELD WALL (SSW) CORRECTIVE s | WPPSS-2 SACRIFICIAL SHIELD WALL (SSW) CORRECTIVE s | ||
ACTION PLAN In accordance with your request the Structurni Engine 2 ring Branch has reviewed Burns and Roe Technical Memorandum No. 1173 which providee Justification for the une of the partial penetration weld between SSV rings 3 and 4 including SSW as-built dinension consideration. However, we do not have adequate background information of the problem such ao those references listed in the Technical Memorandum No. 1173, and are i | |||
rings 3 and 4 including SSW as-built dinension consideration. However, | therefore at difficulty in performing an in-depth review. Furthermore, it appears that the corrective measures to be taken to transmit shcan at the interface of the channel and box rings are based on the idealistic | ||
+ | |||
distribution of design loads instead of the actual ~ defective conditions. | |||
at the interface of the channel and box rings are based on the idealistic | |||
t On this account we request the following additional information in order to complete our review on the SSU corrective action plant i | t On this account we request the following additional information in order to complete our review on the SSU corrective action plant i | ||
1. | |||
References 1 thru 4 stated in Burns and Roe Technical Memorandum l | |||
type, nature, size, location and description of all defects, cracks, i | No. 1173, dated Ifarch 19, 1990. | ||
2.. | |||
Detailed drawings of the sacrificial shield wall. Identify the i | |||
7 | type, nature, size, location and description of all defects, cracks, i | ||
irregularities, or damages that exist in the sacrificial. shield wall and its reinted structures. | |||
SEB:DE | 3. | ||
SEB: | Calculation of design loads and load combinations, stress analyses i | ||
of both the design structuro and the as-built structure with iden-l tified defects. Identify any redistribution of loads in the strue-ture and at the box ring interfaces. Locate all the contact bearing areas at the interfaces. List all the assunptions and postulations used in the analyses. | |||
7 I | |||
-P.. | |||
X29460 i | |||
SEB:DE SEB: | |||
/ | |||
.. <.R......T....!... | |||
............D.ES..E. S : | |||
D | |||
.. 3.pj,7 | |||
..f.h.h/2,9,!.8.W,.........h de.",8...., | |||
(.S.9 D a.').9X......... | |||
en, sun a m. > | |||
,... 6../..d..../. 8. 0......... 7./..*/../. 8 0 e 1.....(........ | |||
w.* | |||
pe c somas He (p.te) pu os o m | |||
...iim m m | |||
4 i | 4 i | ||
i h | i h | ||
! We also suggest a meeting with the applicant to expedite the understanding and resolution of the problem. | |||
Franz P. Schauer, Chief Structural Engineering Branch Division of Engineering 1 | Franz P. Schauer, Chief Structural Engineering Branch Division of Engineering 1 | ||
I | I cc: | ||
R. L. Tedesco | J. Faiaht R. L. Tedesco I | ||
D. Jeng D.' Lynch l | |||
S. Chan 1 | |||
S. Chan | l t | ||
t | lt i | ||
1 I | 1 I | ||
~ | |||
r | r l, | ||
t i. | |||
i. | |||
f f | f f | ||
I, L | I, L | ||
| Line 78: | Line 81: | ||
i 1 | i 1 | ||
I 1 | I 1 | ||
i wme* | i wme* | ||
sema = > | sema = > | ||
I SA?S * | I SA?S | ||
l Mac poem sie (9 76) NBCM 004 | * l Mac poem sie (9 76) NBCM 004 8 w.e. **ve=== eat m'a'ia s emm '"* | ||
* en n e | * en n e | ||
.}} | |||
Latest revision as of 04:32, 4 December 2024
| ML20213D271 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/07/1980 |
| From: | Schauer F Office of Nuclear Reactor Regulation |
| To: | Yopungblood B, Youngblood B Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0304, CON-WNP-304 NUDOCS 8008190121 | |
| Download: ML20213D271 (2) | |
Text
_
\\
',/ CENTRAL FILE iOdb,Nb$ bb. [U.E CDR JUL 7 1980 o47
't l
s 0
MDf0RANDUM FOR:
B. J. Youngblood, Chief Licensing Projects Branch, DL FROM:
Franz P. Schauer, Chief Structural Engineering Branch, DE f
SUBJECT:
WPPSS-2 SACRIFICIAL SHIELD WALL (SSW) CORRECTIVE s
ACTION PLAN In accordance with your request the Structurni Engine 2 ring Branch has reviewed Burns and Roe Technical Memorandum No. 1173 which providee Justification for the une of the partial penetration weld between SSV rings 3 and 4 including SSW as-built dinension consideration. However, we do not have adequate background information of the problem such ao those references listed in the Technical Memorandum No. 1173, and are i
therefore at difficulty in performing an in-depth review. Furthermore, it appears that the corrective measures to be taken to transmit shcan at the interface of the channel and box rings are based on the idealistic
+
distribution of design loads instead of the actual ~ defective conditions.
t On this account we request the following additional information in order to complete our review on the SSU corrective action plant i
1.
References 1 thru 4 stated in Burns and Roe Technical Memorandum l
No. 1173, dated Ifarch 19, 1990.
2..
Detailed drawings of the sacrificial shield wall. Identify the i
type, nature, size, location and description of all defects, cracks, i
irregularities, or damages that exist in the sacrificial. shield wall and its reinted structures.
3.
Calculation of design loads and load combinations, stress analyses i
of both the design structuro and the as-built structure with iden-l tified defects. Identify any redistribution of loads in the strue-ture and at the box ring interfaces. Locate all the contact bearing areas at the interfaces. List all the assunptions and postulations used in the analyses.
7 I
-P..
X29460 i
SEB:DE SEB:
/
.. <.R......T....!...
............D.ES..E. S :
D
.. 3.pj,7
..f.h.h/2,9,!.8.W,.........h de.",8....,
(.S.9 D a.').9X.........
en, sun a m. >
,... 6../..d..../. 8. 0......... 7./..*/../. 8 0 e 1.....(........
w.*
pe c somas He (p.te) pu os o m
...iim m m
4 i
i h
! We also suggest a meeting with the applicant to expedite the understanding and resolution of the problem.
Franz P. Schauer, Chief Structural Engineering Branch Division of Engineering 1
I cc:
J. Faiaht R. L. Tedesco I
D. Jeng D.' Lynch l
S. Chan 1
l t
lt i
1 I
~
r l,
t i.
f f
I, L
f i
l 6
5 t
i 1
I 1
i wme*
sema = >
I SA?S
- l Mac poem sie (9 76) NBCM 004 8 w.e. **ve=== eat m'a'ia s emm '"*
- en n e
.