ML20214A049: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:- | ||
GPU Nuclear Corporation Nuclear | GPU Nuclear Corporation Nuclear | ||
:::eme=8o Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number: | :::eme=8o o | ||
(717) 948-8461 4410-87-L-0074 Document ID 0091P May 12, 1987 US Nuclear Regulatory Commission Attn: Document Control Desk | Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number: | ||
(717) 948-8461 4410-87-L-0074 Document ID 0091P May 12, 1987 US Nuclear Regulatory Commission Attn: Document Control Desk i | |||
Washington, DC 20555 | |||
==Dear Sirs:== | ==Dear Sirs:== | ||
Three Mile Island Nuclear Station, Unit 2 (TMI-2) | Three Mile Island Nuclear Station, Unit 2 (TMI-2) | ||
Operating License No. DPR-73 Docket No. 50-320 Annual Update of Interim Solid Waste Staging Facility Technical Evaluation Report As requested by NRC {{letter dated|date=February 4, 1982|text=letter dated February 4,1982}}, GPU Nuclear has performed the annual review of the Interim Solid Waste Staging Facility (ISWSF) | Operating License No. DPR-73 Docket No. 50-320 Annual Update of Interim Solid Waste Staging Facility Technical Evaluation Report As requested by NRC {{letter dated|date=February 4, 1982|text=letter dated February 4,1982}}, GPU Nuclear has performed the annual review of the Interim Solid Waste Staging Facility (ISWSF) | ||
Technical Evaluation Report (TER) and has detemined that a revision is not required at this time. | Technical Evaluation Report (TER) and has detemined that a revision is not required at this time. | ||
Sincerely, | Sincerely, | ||
-[ | |||
F. R. Standerfer Director, TMI-2 FRS/CJD/eml cc: Regional Administrator, Region 1 - W. T. Russell Director, TMI-2 Cleanup Project Directorate - Dr. W. D. Travers l | F. R. Standerfer Director, TMI-2 FRS/CJD/eml cc: Regional Administrator, Region 1 - W. T. Russell Director, TMI-2 Cleanup Project Directorate - Dr. W. D. Travers l | ||
8705190226 870512 | fg 8705190226 870512 0 | ||
ADOCK 05000320 R | PDR ADOCK 05000320 j4 R | ||
PDR g | |||
GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation}} | |||
Latest revision as of 02:53, 4 December 2024
| ML20214A049 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/12/1987 |
| From: | Standerfer F GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| 0091P, 4410-87-L-0074, 4410-87-L-74, 91P, NUDOCS 8705190226 | |
| Download: ML20214A049 (1) | |
Text
-
GPU Nuclear Corporation Nuclear
- eme=8o o
Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:
(717) 948-8461 4410-87-L-0074 Document ID 0091P May 12, 1987 US Nuclear Regulatory Commission Attn: Document Control Desk i
Washington, DC 20555
Dear Sirs:
Three Mile Island Nuclear Station, Unit 2 (TMI-2)
Operating License No. DPR-73 Docket No. 50-320 Annual Update of Interim Solid Waste Staging Facility Technical Evaluation Report As requested by NRC letter dated February 4,1982, GPU Nuclear has performed the annual review of the Interim Solid Waste Staging Facility (ISWSF)
Technical Evaluation Report (TER) and has detemined that a revision is not required at this time.
Sincerely,
-[
F. R. Standerfer Director, TMI-2 FRS/CJD/eml cc: Regional Administrator, Region 1 - W. T. Russell Director, TMI-2 Cleanup Project Directorate - Dr. W. D. Travers l
fg 8705190226 870512 0
PDR ADOCK 05000320 j4 R
PDR g
GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation